HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 301 i 330 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5838

Derbyniwyd: 10/03/2026

Respondent ID: 3396

Ymatebydd: Mr Simon Tomlinson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Very poor choice. Already massive congestion, losing character of village without appropriate facilities in terms of doctors, schools, shops etc. Also significant flooding risk already in the village which could only be made worse with additional concrete, drainage and loss of trees/ greenery.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5841

Derbyniwyd: 10/03/2026

Respondent ID: 3372

Ymatebydd: Dinas Powys Community Council

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the allocation of Site HG1 KS2 – Land North of Dinas Powys due to concerns over flood risk, drainage capacity, and the impact on local infrastructure, including schools and healthcare. I believe the site’s development would worsen existing drainage issues, increase flood risk, and place unsustainable strain on services. Traffic congestion along the commuter corridor would intensify, and the rural character of the village would be eroded. Given these constraints, I request the Vale of Glamorgan Council reconsider this site’s allocation, deeming it unsuitable for the proposed scale of development.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5842

Derbyniwyd: 10/03/2026

Respondent ID: 3397

Ymatebydd: Mr R Todd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Cardiff road is already a traffic bottleneck. Traffic regularly queues from the Merrie Harrier junction all the way through Dinas Powys to Bryn y don park. More traffic plus extra junctions will only make the situation worse due to lack of road infrastructure. And more pollution - No thank you !!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5843

Derbyniwyd: 10/03/2026

Respondent ID: 3398

Ymatebydd: Ms Rhian Williams

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

The use of Welsh language will reduce as these new developments don't use bilingual signs or documents and there is no school spaces for students to learn Welsh language locally as they are full. And often people that are not local are buying these houses as locals cannot afford them and they don't speak Welsh and it dilutes the language and Welsh culture.

Crynodeb o'r Gynrychiolaeth:

There is too much traffic and not enough infrastructure in Dinas powys to support it. There is not enough school places, GP, dentists, road space. The pollution levels on the front road must be close to or above the assembly recommended limit and adding at least another 500 cars will damage the health of locals including children attending primary school. This will also affect the village environment of Dinas Powys which people value and Dinas will lose it's identity.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5876

Derbyniwyd: 11/03/2026

Respondent ID: 3409

Ymatebydd: Mrs Ruth Shields

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

How does housing have an impact on the welsh language ?

Crynodeb o'r Gynrychiolaeth:

I wish to object to the proposed housing development in Dinas Powys due to its impact on local amenities and traffic. Local services such as doctors, schools, and community facilities are already under pressure and lack the capacity to support significant additional demand. The proposal does not clearly demonstrate how this strain would be mitigated. Traffic congestion is already problematic, particularly at peak times, and the development would increase traffic on roads that are not designed for higher volumes. This raises concerns about safety, pollution, and overall quality of life. For these reasons, I believe the development is unsustainable. ref:HG/KST

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5895

Derbyniwyd: 08/03/2026

Respondent ID: 2131

Ymatebydd: Mr GRAHAM MORRIS

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am concerned that the proposed site would intrude into the green belt, risking the loss of Dinas Powys’s village identity due to "creep" merging Dinas with Llandough. Increased pedestrian traffic from Eastbrook Railway Station could cause delays and pollution without sufficient parking. The development might generate 300-400 additional cars daily, worsening traffic congestion, especially without a proposed bypass. Flooding risks from the Cadoxton River and East Brook are unaddressed in the plan, with climate change likely to worsen this. Sewerage capacity and support services like schools and healthcare also remain inadequate.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5942

Derbyniwyd: 08/03/2026

Respondent ID: 1825

Ymatebydd: Mr Alan Tarr

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Nothing to do with the Welsh language - few people speak Welsh in this area - what it is about is Congestion!

Crynodeb o'r Gynrychiolaeth:

Dinas Powys is very busy now at peak times with traffic from Barry as well as Dinas Powys! Peak times between 8am - 9.30am and 4pm - 6pm is absolutely crazy!
To build more properties increases; people, cars, deliveries, children going to school, pressure on transport; buses and trains, doctors appointments, dentists, schools, sewers, roads, traffic.
I cannot believe yet 250 more houses are being considered in the area which is already at breaking point - my understanding is that the Dinas area was at maximum capacity some 5 years ago so why is this even being considered - has everyone in planning gone completely mad? I object to the idea 100%.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5985

Derbyniwyd: 11/03/2026

Respondent ID: 2264

Ymatebydd: Mr Andrew John

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I strongly oppose the development site, citing flood risks, inadequate drainage, and the potential for increased flooding, especially for houses near Cardiff Road. The current infrastructure cannot handle more traffic, which already causes congestion; additional vehicles will worsen this. Public services, like Dinas Powys surgery, are already strained, and extra residents will exacerbate these issues. I believe the council should prioritise existing residents' needs, conduct independent reviews, and require developers to address environmental and infrastructural concerns before proceeding with any development.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5997

Derbyniwyd: 11/03/2026

Respondent ID: 3450

Ymatebydd: M vdh

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I wish to formally object to the allocation of Site HG1 KS2 – Land North of Dinas Powys within the Replacement Local Development Plan.
In my view, the site is unsuitable for development due to concerns relating to flood risk and drainage capacity, pressure on local infrastructure, constraints within the highway network, and the impact on the rural character and setting of the village.
Key Concerns
Flood risk and drainage capacity.
Pressure on schools and healthcare services.
Highway congestion along the Vale–Cardiff commuter corridor.
Loss of countryside forming mental and physical health recreation and noise polution.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6007

Derbyniwyd: 09/03/2026

Respondent ID: 3453

Ymatebydd: Mr Jeffrey Joyce

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Having lived in the area since 1980 I have seen the village expand to a virtual suburb of Penarth and this development will almost join DP to Llandough hospital. This ignores the greenbelt between the 2 villages and the natural habitats of widlife. no Traffic congestion has increased to such a level there is standing traffic along the main arterial routes through the village from 7am until 7pm making it impossible to plan ahead for meetings. Additional traffic and junctions between DP and Llandough will make travel unbearable, particularly as weneed a car to attend tofamily needs.

Having been flooded in 2020 I dread the thought of how the riskof worse flooding to be exacerbated by 250 houses on top of the Eastbrook. If you walk the intended site now it is like a swamp, but at least that excess water is being held upin those fields!

Trying to see a doctor at the moment is extremely difficult and will be nigh on impossible with anothe 500++ people fighting for an appointment. The village schools are at full capacity and finding it difficult cope with its current intake.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6012

Derbyniwyd: 11/03/2026

Respondent ID: 3455

Ymatebydd: Miss Cari Rees

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed development of 250 homes in Dinas Powys, citing its unsuitability for the village size. I believe it will strain local services such as healthcare and schools, worsen traffic congestion and safety, and increase flooding risks due to environmental impact. The development threatens to erode the village’s character by overextending its scale and infrastructure. I urge the Council to reject this proposal, emphasising the need for sustainable, proportionate planning that respects the existing community and environment. I request confirmation of receipt and recording of this objection.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6023

Derbyniwyd: 07/03/2026

Respondent ID: 1858

Ymatebydd: Mr Phil Richardson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

All the building within Dinas , no consideration is given to the residents as to the changes which we have to tend with ,traffic caused by these changes , the road are gridlocked plus all the congestion as a result plus all the other add on,s which follow, they should not be using all the available plots within the village, also surrounding areas to be considered.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6027

Derbyniwyd: 07/03/2026

Respondent ID: 1894

Ymatebydd: Mrs Janet Richardson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

all the building within Dinas , no consideration is given to the residents as to the changes which we have to tend with ,traffic caused by these changes , the road are gridlocked plus all the congestion as a result plus all the other add on,s which follow, they should not be using all the available plots within the village, also surrounding areas to be considered.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6033

Derbyniwyd: 08/03/2026

Respondent ID: 1931

Ymatebydd: Mr Lewis Clements

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed housing development at Dinas Powys, due to existing infrastructure strain, severe traffic congestion, flooding risks, and environmental concerns. The area already faces overburdened roads, drainage, and public services, with inadequate active travel infrastructure forcing residents to use cars. The development would increase congestion around the hospital, cause loss of green space, and worsen air quality. Roads are poorly maintained and cannot support more traffic. Local healthcare and education services are at capacity, and the proposal neglects necessary infrastructure and community needs burdening residents and undermining sustainability of the community.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6034

Derbyniwyd: 09/03/2026

Respondent ID: 3457

Ymatebydd: Mrs Suzanne Rees

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

My first concern is currently there is insufficient infrastructure to support the level of development proposed. The surrounding area is already too congested, and existing roads regularly struggle to cope with the amount of traffic. Building a large number of additional homes will inevitably increase vehicle and place further strain on roads that are already operating beyond reasonable capacity. In addition, local public services are already under considerable pressure. Schools in the area are at capacity and local GP surgeries are struggling to accommodate the current population. The surrounding area has not really changed in the last 30 years. Dinas Powys bypass was first proposed around 1977 and the route safeguarded. It was on the councils development plan 1996-2011. We are still waiting. While we are continuing to have new development forced on us in the Vale of Glamorgan. Average family fomes have changed, possibly having 3 or more cars per household. The reads are in a terrible state full of potholes because of the traffic and heavier vehicles etc. Without substantial investment in supporting infrastructure the proposed development would have a detrimental impact on the quality of life, existing residents and the wider community.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6040

Derbyniwyd: 11/03/2026

Respondent ID: 1537

Ymatebydd: Mrs Claire Oneill

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

HG1 KS2
Major risk of flooding as Eastbrook runs to the rear of my property from adjacent fields.
Loss of wildlife and fauna - bats,owls, weasels, rabbits, goldfinches, woodpeckers, birds of prey. Oak trees and thistles.
Eastbrook railway station does not have all-inclusive access for wheelchairs/buggies/impaired mobility
NHS services and schools already over-stretched/over-subscribed.
Cardiff Road traffic crawling
Boundary dispute XX Wayside Cottages CF64 4LH adjacent to proposed site. Full planning permission in 2007 for a side extension 2007/XXXXX/FUL. Historic google images show more land at my property than currently fenced off and pre-existing fence posts remain.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6041

Derbyniwyd: 09/03/2026

Respondent ID: 2001

Ymatebydd: Mr Michael Hutchings

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Increased congestion- 250 homes will bring 300-500 extra cars.
Increased flooding - water run off from Eastbrook site will enter the Cadoxton river flooding homes in Dinas Powys.
Doctors and schools already at capacity.
Loss of wildlife - development will destroy vast habitats for wildlife.
Active travel- limited access to Eastbrook train station and inadequate.
NHS services- emergency responders affected by the additional demand and congestion brought on by the development.
Reduced greenbelt boundaries are meant to be protected, not adjusted to fit an agenda.
Losing village identity- Dinas Powys population is constantly growing and will lose village identity

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6043

Derbyniwyd: 11/03/2026

Respondent ID: 1537

Ymatebydd: Mrs Claire Oneill

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

HG1 KS2
Major risk of flooding as Eastbrook runs to the rear of my property from adjacent fields.
Loss of wildlife and fauna - bats,owls, weasels, rabbits, goldfinches, woodpeckers, birds of prey. Oak trees and thistles.
Eastbrook railway station does not have all-inclusive access for wheelchairs/buggies/impaired mobility
NHS services and schools already over-stretched/over-subscribed.
Cardiff Road traffic crawling
Boundary dispute 12 Wayside Cottages CF64 4LH adjacent to proposed site. Full planning permission in 2007 for a side extension 2007/01696/FUL. Historic google images show more land at my property than currently fenced off and pre-existing fence posts remain.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6045

Derbyniwyd: 11/03/2026

Respondent ID: 3372

Ymatebydd: Dinas Powys Community Council

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the allocation of Site HG1 KS2 – Land North of Dinas Powys, citing concerns about flood risk, drainage capacity, and climate change impacts. I believe development would increase runoff, strain existing drainage infrastructure, and risk downstream flooding. Additionally, existing pressure on local schools and healthcare services, along with highway congestion on key commuter routes, would worsen with 250 new homes. The site’s development would also threaten the rural character and setting of the village. I urge the Council to reconsider this site’s suitability for development within the Local Development Plan.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6053

Derbyniwyd: 11/03/2026

Respondent ID: 3461

Ymatebydd: Miss Ceri Baines

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This area of Dinas Powys is so congested that journeys are becoming un manageable, two surgeries have been closed and not replaced. Schools are oversubscribed and public transport is not fit for purpose. Unless infrastructure is significantly upgraded developments like this should be postponed. There is also the major concern of chronic habitat loss in the local area. Decline in wildlife is stark and vital habitat continues to be eroded, including a number of established trees in this area.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6059

Derbyniwyd: 11/03/2026

Respondent ID: 3459

Ymatebydd: Mrs Joanna Williams

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

This site is not suitable for allocation, and its inclusion would conflict with several key RLDP objectives, including sustainable transport, flood risk management, settlement hierarchy, landscape protection, and infrastructure capacity.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6062

Derbyniwyd: 09/03/2026

Respondent ID: 2013

Ymatebydd: Ms Clare Richardson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I oppose development of 250 homes at Dinas Powys, due to concerns about increased traffic, pollution, and congestion, especially near schools and the train station. Not many people work near a train station so lots will still travel by car. The bus service is not frequent enough. The development risks damaging local habitats vital for wildlife, including bats, dormice, birds, and reptiles. It may contribute to village sprawl, eroding Dinas Powys’ sense of identity by bringing it closer to Llandough. Additionally, the existing healthcare facilities are already stretched, and housing costs remain high, making affordable options for young residents scarce.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6063

Derbyniwyd: 11/03/2026

Respondent ID: 3462

Ymatebydd: Mr James Huzzey

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Absolutely none! Who is to say that welsh residents will move in. This will simply be another commuter area of the Vale

Crynodeb o'r Gynrychiolaeth:

I think the pan to build up to 250 houses on this land is absolutely ridiculous! I lived in Dinas Powys for the majority of my life before moving to Penarth. I regularly travel through Dinas Powys and the traffic without the additional properties is gridlocked ALL DAY EVERY DAY. I am registered with the doctors surgery in the village and can never get an appointment as they are full to capacity. The schools are full.
There is no infrastructure to cope with the current number of properties, let alone another 250. THIS MUST NOT GO AHEAD

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6067

Derbyniwyd: 11/03/2026

Respondent ID: 2951

Ymatebydd: Miss Siobhan O'Connell

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the allocation of Site HG1 KS2 – Land North of Dinas Powys, citing concerns over flood risk, drainage capacity, and climate change impacts. I believe the development of 250 homes would worsen existing drainage issues and flood risks. I also highlight the strain on local infrastructure, including schools and healthcare, and increased traffic congestion on the highway network. Additionally, the site’s development would harm the village’s rural character and setting. Given these constraints, I consider the site unsuitable for development and request the council reconsider its allocation.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6075

Derbyniwyd: 09/03/2026

Respondent ID: 3466

Ymatebydd: Mr Nick Hughes

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed 250 homes north of Dinas Powys due to concerns over increased congestion on the A4055 Cardiff road, which already suffers peak-hour traffic issues. I believe the current public transport plans are insufficient to address this, if existing transport options solved this issue there wouldn't be any existing traffic. Additionally, I am worried about strain on local services such as schools and healthcare. The development risks eroding Dinas Powys’s identity by turning it into a suburban extension of Cardiff, with minimal community or commercial expansion. Overall, I feel residents’ concerns have not been adequately addressed.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6083

Derbyniwyd: 09/03/2026

Respondent ID: 3468

Ymatebydd: Mr Kevin Rossiter

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

As a fluent Welsh speaker who actively encourages others to use the language where possible, it disappoints me to think about the impact this development has on the Welsh language in the area.

Due to the location of the development, there is little option for Welsh medium education as there are no Welsh medium schools in the village. This would mean that people moving into the area with the intention of starting a family, or those who will be moving in as family units who will be changing the schools of their children will be more likely to engage in English medium education.

There is Pen y Garth nearby, but to access the school the families would need to drive as there is no public footpath along that road to travel safely to school. In your propsoal it has been stated that there is no expectation for traffic levels to increase as the new residents will all choose public transport with the station nearby. If that is correct, then I see no world where this new community would choose to engage in the Welsh medium facilities available to them.

This, of course, will oppose the principle of "A Wales of Vibrant Culture and Thriving Welsh Language" within the Wellbeing of Future Generations Act 2015.

Crynodeb o'r Gynrychiolaeth:

I object to the development of site HG1 KS2, evaluating its impact against the Wellbeing of Future Generations Act 2015. The project undermines key principles by damaging green spaces essential for carbon absorption and flood defence, reducing biodiversity, and negatively affecting community health and cohesion. It also risks increasing inequalities due to its location and contributes to environmental degradation through increased traffic and loss of natural habitats. The development conflicts with Wales’ goals of prosperity, resilience, health, equality, community cohesion, and global responsibility through providing no infrastructure and actively removing countryside.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6085

Derbyniwyd: 09/03/2026

Respondent ID: 3467

Ymatebydd: Mrs Wendy Puntis

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Many people in and around Dinas Powys speak Welsh. This is our language and as young people now learn this in school it will, hopefully, never be lost. It is important to our children future that they grow up to be proud of their Welsh language and culture. We are Welsh, but British and we should be proud of this and preserve all aspects of our culture for future generations and not lose it for ever. Also, we are a truly village community and this should not be discarded as it has been in many parts of the United Kingdom - lose the sense of belonging as in large towns and you lose your culture. We want to preserve our village and our Welsh culture.

Crynodeb o'r Gynrychiolaeth:

Cardiff Road is already severely congested, particularly when people are going to and from work and taking children to school. These extra houses can only add to this, causing more delays. This will be a particular problem for emergency vehicles, patients requiring emergency admission to hospital will be delayed with the risk of serious consequences caused by this building plan. There are already an unacceptable delays for GP appointments, 250 more households can only make this worse. Schools are already full. There will be no shops within easy walking distance for elderly or disabled people. Is the existing gas, water, sewerage and electricity infrastructure adequate for these houses?

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6089

Derbyniwyd: 09/03/2026

Respondent ID: 3123

Ymatebydd: Dr Malcolm Puntis

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Roads - Cardiff Road is already inadequate for the existing volume of traffic, there are frequent delays. This building project can only make it worse. The increased congestion will make it impossible for emergency vehicles to travel efficiently. The state of repair of Dinas Powys roads is currently appalling, extra traffic will cause further deterioration.
GP Practice - There are delays now when making a GP appointment, all these extra residents will make it worse. Is there a plan for extra GP's or another GP practice?
Schools - Where is the school that all the 100 or more children living in these 250 new houses will attend? The existing schools are full.
Shops - There are no shops within easy walking distance, especially for elderly or disabled people.
Construction - Will the quality of building for the proposed houses be of an appropriate standard? There are several developments in the Cardiff and Penarth area where the building quality, by some contractors, has been so poor that residents have had to move to temporary accommodation for essential repairs to be undertaken.
Public Transport - There will be an increased demand for public transport. Will a lift be installed on Eastbrook Station so that passengers who cannot manage stairs can travel easily to and from these houses?

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6107

Derbyniwyd: 11/03/2026

Respondent ID: 3477

Ymatebydd: Mr Julian Baines MBE

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

There is no provision for the traffic issues which already heavily congested on Sully Road, Cardiff Rd and Redlands Rd. No provision for doctors surgery as still awaiting the long promised Cogan hub at the Leisure Centre. No additional school places. Basically totally unworkable

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6116

Derbyniwyd: 11/03/2026

Respondent ID: 2031

Ymatebydd: Mr leonard Hughes

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

traffic
loss of wildlife and habitat
pollution
no added facilities it took me 161 times to access doctors