HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 271 i 300 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5515

Derbyniwyd: 03/03/2026

Respondent ID: 1566

Ymatebydd: Mrs Janet Black

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

1. Current infrastructure - Until the whole network of utilities has been upgraded and flood defences have been implemented, anymore additional strain will result in catastrophic failures and more flooding.
2. Flood Risk - Despite proposed flood alleviating systems, there will be many issues with flood risk to the rest of the village.
3. Travel - Increased traffic in an area that is already gridlocked, impact on emergency services, generally inefficient public transport with stations that are inaccessible to all in the surrounding area.
4. Junction - The junction at the Merrie Harriers is already jammed and adding an additional junction for cars entering and exiting the development will only exacerbate the traffic issue.
5. Impact on local doctors and schools - will create more pressure on services that are only strained.
6. Green space - the natural environment is important to well-being. We can no longer destroy wildlife natural habitats, without local and global consequences.
7. Over development will risk loosing the important village community and identity.

There are many more implications if new homes are built anywhere without a sustainable infrastructure in place first.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5526

Derbyniwyd: 09/03/2026

Respondent ID: 2309

Ymatebydd: Mrs Hilary May

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

if safe active travel route to Pen y Garth school would benefit the Welsh language as would be closest primary school to this site.

Crynodeb o'r Gynrychiolaeth:

My main concern is the potential increase in traffic, however this could be mitigated and other Dinas Powys residents could be enabled to reduce their car use if links to public transport and active travel routes are put in place before anyone moves into this site. Extend bus lane/shared use path to last house currently on Cardiff Road. Provide a safe coherent cycle route to Baron's Court and links to Pont y Werin and along Penarth Rd. Eastbrook station to have lift/ramp and safe walking route there. All houses to have secure cycle parking.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5533

Derbyniwyd: 09/03/2026

Respondent ID: 3286

Ymatebydd: Mrs Angela Jones

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am writing to formally object to the proposed development of 250 new houses in Eastbrook. While I recognise the need for additional housing, this particular location is wholly unsuitable and poses significant risks and burdens to the local community.

Traffic Congestion and Infrastructure Strain- The Eastbrook and Dinas Powys area is already heavily congested, with Cardiff Road frequently experiencing long tailbacks at peak times. Dinas Powys has become a bottleneck for traffic travelling to Barry and surrounding areas, and the existing road network is simply not capable of absorbing the impact of hundreds of additional vehicles. With 250 new homes, the development would inevitably introduce 250 or more extra cars onto an already overstretched route, worsening congestion and increasing journey times for residents, commuters, and emergency services.

Flooding Concerns- The fields earmarked for this development are known to be waterlogged and prone to flooding. These natural floodplains currently play a vital role in absorbing excess water. Building on them would not only remove this natural buffer but also heighten the risk of flood damage to existing homes and infrastructure. The community has already experienced continual flooding issues, and this proposal would exacerbate an already serious problem.

Unsuitable Location for Large-Scale Development- Given the traffic pressures, the flood risk, and the limited capacity of local infrastructure, Eastbrook is not an appropriate location for a development of this scale. More suitable areas must be considered-locations that do not compromise road safety, increase flood risk, or place additional strain on a community already struggling with congestion. I strongly urge the planning authority to reconsider this proposal and explore alternative sites that can accommodate new housing without causing significant harm to the environment or the wellbeing of local residents.

Thank you for considering my objection.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5535

Derbyniwyd: 06/03/2026

Respondent ID: 1745

Ymatebydd: Mr & Mrs Andrew Locker

Nifer y bobl: 2

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I oppose the proposed construction of 250 houses in Eastbrook Dinas Powys due to several reasons. The need for new houses is questionable given the falling birth rate. Flooding risks will increase as development encroaches on flood plains, despite the proposed SuDS. Active travel is impractical for new residents, and existing services are at capacity. The village's identity may be compromised by merging with nearby communities, and wildlife habitats will be destroyed. Access issues caused by bus lane. The Eastbrook site was proposed a few years ago but was turned down, nothing has changed since.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5536

Derbyniwyd: 09/03/2026

Respondent ID: 2011

Ymatebydd: Mrs Clare Tomlinson

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Little. If this is your main concern you are delusional. It's a shame there is no local election this year as Labour have no chance of being re elected locally

Crynodeb o'r Gynrychiolaeth:

I am concerned about flooding on Cardiff Road and Dinas Powys properties, worsened by building on fields that increase surface runoff. The local infrastructure, especially roads, is already at capacity, and new housing sites will cause further gridlock and safety issues. There is a lack of sustainable travel options, with narrow pavements and no cycle lanes. The development threatens green belt and woodland areas, harming local ecology. The cumulative impact of multiple sites amounts to over-development, placing an unsustainable burden on the community. GP already over capacity since taking on Penarth and Grange town patients.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5538

Derbyniwyd: 09/03/2026

Respondent ID: 3287

Ymatebydd: Mr Simon Groves

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am writing to formally object to the proposed housing development in Dinas Powys, particularly the plan to construct approximately 250 new homes on the fields adjacent to Cardiff Road (Eastbrook). While I fully recognise the need for additional housing, the chosen location is wholly unsuitable for a development of this scale. There are several significant concerns that I believe have not been adequately addressed including severe existing traffic congestion, flooding, overstretched local services and the availability of alternative sites.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5539

Derbyniwyd: 09/03/2026

Respondent ID: 2011

Ymatebydd: Mrs Clare Tomlinson

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

None, get your priorities right

Crynodeb o'r Gynrychiolaeth:

HG1 KS2-You want to expand the village -now it is the size of a small town, but without the facilities of a small town. Cowbridge has a far smaller population but a far greater range of facilities. GP surgery is at overcapacity already after taking Penarth and Grangetown patients, flooding on the roads, especially Cardiff road and Millbrook road is a frequent occurrence which will only worsen.
Pavements along Cardiff road near the proposed development are narrow- no good for pushchairs/wheelchairs. Platform leading to Barry at Eastbrook is only easily accessible by footbridge, trains are often full.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5556

Derbyniwyd: 09/03/2026

Respondent ID: 2774

Ymatebydd: Mr Corrado Ruta

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I strongly object to development of this site for housing as it goes against some key objectives of the RLDP. I object because it goes against "Objective 1 - Mitigating and Adapting to Climate Change" and "Objective 2 - Improving Mental and Physical Health and Well-being" and "Objective 8 - Promoting Active and Sustainable Travel Choices" because the area hasn't got adequate public transport nor active travel infrastructure, so all new residents will be forced to move by car for virtually any needs. The recent housing developments in Dinas, Barry and Sully have already created enormous traffic pressure on the poor road network and were not accompanied by any improvement in public transport nor active travel infrastructure. Significant improvements in public transport and active travel infrastructure should be planned and undertaken prior to any further housing development. I object as the proposed use goes against the RLDP Objective 5 – Protecting and Enhancing the Natural Environment, Objective 4 – Placemaking and Objective 2 - Improving Mental and Physical Health and Well-being. The site is located in an area of natural beauty and tranquillity, heritage rural setting and crossed by a public right of way for local walkers.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5617

Derbyniwyd: 09/03/2026

Respondent ID: 3309

Ymatebydd: Mrs Maria Howland

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Dilution of Welsh speakers, negative impact forcing locals out of the area, and reduced everyday use of Welsh in community life

Crynodeb o'r Gynrychiolaeth:

I object to the proposed Dinas Powys development ref hg1ks2.
As a full time worker who commutes into Cardiff on a regular basis by train, there simply isn’t capacity on the line for additional commuters. On several occasions I have been unable to board the train as carriages have been too full to allow more passengers on already by the Eastbrook stop. A key reason this site appears to have been chosen for the development is its proximity to the train station however there is no capacity to support more commuters on the line, how can this rationale be supported?

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5618

Derbyniwyd: 09/03/2026

Respondent ID: 3310

Ymatebydd: Mr Liam Roche-Lamerton

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Demographic dilution of Welsh speakers, negative impact in forcing existing locals away from the village. These people are more likely to be Welsh speaking than people moving in.

Crynodeb o'r Gynrychiolaeth:

I would like to object to the planning reference HG1 KS2 in Dinas Powys.
I don’t believe the land is suitable for development. The green land is an important flood defence for the village. The road out of the village is already congested, 250 extra houses will make this worse. I also worry the addition of houses will lead to the village loosing its identity. I would be interested to know if the motivation for this planning is driven by the councils opinion this is a good idea or if it is just looking to blindly achieve central government targets.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5628

Derbyniwyd: 09/03/2026

Respondent ID: 3319

Ymatebydd: Mrs Hanna Rouse

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

I dont know

Crynodeb o'r Gynrychiolaeth:

I wish to object to the proposed development due to the significant impact it would have on the local area. The development would increase traffic on roads that are already congested and not designed to accommodate additional vehicle movements, creating potential safety risks for residents, pedestrians, and cyclists. Local schools are already oversubscribed and lack capacity for additional pupils, yet the proposal provides no clear solution to this issue. Furthermore, the development would place additional strain on already stretched local infrastructure and services, including healthcare and public amenities.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5650

Derbyniwyd: 10/03/2026

Respondent ID: 3264

Ymatebydd: Mr David Entwistle

Crynodeb o'r Gynrychiolaeth:

This is one of the better proposed locations for housing development in the LDP. The site is situated in close proximity to existing healthcare, education and public transport networks. Its is easier to access Cardiff for employments purposes and much closer to centres of employment and retail than many of the other sites proposed.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5682

Derbyniwyd: 10/03/2026

Respondent ID: 3333

Ymatebydd: Mr John McManus

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Not known

Crynodeb o'r Gynrychiolaeth:

The development will lead to increased congestion,Cardiff Road already congested, increased flooding risk, strain on doctors and schools services

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5687

Derbyniwyd: 07/03/2026

Respondent ID: 3335

Ymatebydd: Antoinette Dowdall

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Increase in congestion on Cardiff Road which is already at capacity,
Increased risk of flooding in an area that has seen catastrophic flooding in 2020 followed by numerous flood alerts and flood warnings since,
Loss of wildlife habitat including trees, fields and hedges which are also important for dispersing heavy rainfall,
GP surgeries and schools at capacity already.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5698

Derbyniwyd: 07/03/2026

Respondent ID: 3336

Ymatebydd: Mr David Richards

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I believe the proposal conflicts with the character and scale of growth permitted in Dinas Powys by the Local Development Plan, as 250 new homes would significantly alter the village's form. Traffic congestion on Cardiff Road cannot safely accommodate additional vehicles, and there is no credible mitigation. The development risks increasing surface-water flooding due to inadequate drainage solutions and would lead to the permanent loss of greenfield land, harming landscape quality. Furthermore, local infrastructure is already strained, and the proposal does not demonstrate sufficient capacity or mitigation, making it unsustainable and unsuitable for approval.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5721

Derbyniwyd: 10/03/2026

Respondent ID: 3341

Ymatebydd: Mr Marcello Apollonio

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The gp and schools are already at capacity and the traffic is already terrible getting out of dinas powys. The flooding problem still hasn't been addressed and I live adjacent to the fields and have struggled with mini floods hitting the back of my house causing a water table under my house and damp issues. The bottom half of the fields flood every time we have significant rain even if it hasn't rained for days prior. There is also plenty of wildlife living in these fields and my garden and this site will rob them all of their homes.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5724

Derbyniwyd: 10/03/2026

Respondent ID: 2069

Ymatebydd: Mrs Rebecca Evans

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Increased congestion, the roads through Dinas Powys are already hugely congested, whilst this development may only add 300-500 cars add tothat the increased traffic coming through from Barry from the huge developments that have been given the go ahead there.
Doctors Surgery is already at capacity a further 500 plus patients would put a massive strain on an already stretched service.
Risk of increased flooding, the area has had issues in recent years with flooding given the ongoing change in climate this is only going to get worse.
Loss of greenbelt and the effect on local wildlife.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5747

Derbyniwyd: 10/03/2026

Respondent ID: 3347

Ymatebydd: Mr Mitchell Davies

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

They have not thought of the danger and mass issues to the residents. The proposed area is on a main road between Barry and Cardiff, which is already one of the busiest and most congested roads in South Wales. The traffic will be impossible to get through at all times of the day. The schools and GP surgery is already over capacity. The morning trains are already impossible to board with current residents attempting to get to work. To top it all off, the flooding will increase and leave many residents bankrupt and potentially homeless. Please do not do this.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5763

Derbyniwyd: 07/03/2026

Respondent ID: 1751

Ymatebydd: Prof Carole Rakodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I am concerned about the limited capacity of settlements with train stations to handle large growth, especially regarding the Dinas Powys site proposed for up to 400-1,100 houses. The environmental and flood risk assessments are based on analyses funded by Persimmon, focusing mainly on the site and not downstream areas. Transport infrastructure, particularly road and rail capacity, seems underestimated, with increased traffic on Cardiff Road likely. Additionally, building north of Dinas Powys would heighten local pollution. Assessments also overstate active travel opportunities and overlook the capacity constraints of local health and education services.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5764

Derbyniwyd: 10/03/2026

Respondent ID: 3348

Ymatebydd: Mrs Elaine Davies

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

This idea is disastrous in so many ways. The planners have simply pinned a place on the map near a railway station. The road through Dinas is gridlocked at peak times & it will be impossible to get out of the proposed estate, with potentially an additional 4 or 5 hundred more cars. The additional flood risk is terrifying for many residents. The health & education problems are completely being ignored with an additional 600 people at least. There are no local dentists, heavily over subscribed schools and no plans for extra doctors. Shame on you.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5792

Derbyniwyd: 10/03/2026

Respondent ID: 2060

Ymatebydd: Miss Laura Waddilove

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

I oppose the inclusion of the Land North of Dinas Powys in the RLDP due to its role in the flood prevention of Eastbrook, the loss of biodiversity, and issues it will cause with Dinas' infrastructure. The development will increased surface water runoff, flooding, and cause habitat loss. Concerns with the proposed include a biased ecology survey, inadequate active travel routes, and an unsuitable train station facilities. There is already traffic congestion, limited healthcare and education capacities.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5795

Derbyniwyd: 10/03/2026

Respondent ID: 3375

Ymatebydd: Mrs Zoe Follon

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Naff all

Crynodeb o'r Gynrychiolaeth:

No increase in infrastructure
Roads already jammed
Traffic will increase and is already ridiculous at rush hour
No boundary to beginning of DP. Boundaries will merge
Loss of green belt area
Potential flooding

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5811

Derbyniwyd: 10/03/2026

Respondent ID: 2041

Ymatebydd: Mrs Alyson Brown

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Totally abhorrent proposal as the Dinas Powys area is already seriously challenged by the current urbanisation & over population🙉Schools,health services, roads etc are presently unable to cope as it is without adding 250 more houses to further ruin the Village & destroying vast habitats for wildlife in & around the proposed site🙈

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5818

Derbyniwyd: 08/03/2026

Respondent ID: 1797

Ymatebydd: Mr Leigh Hutchings

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

No impact.

Crynodeb o'r Gynrychiolaeth:

I strongly object to this site being used:
- The increase to congestion. Longer travel times for those sitting in bumper to bumper traffic. Public transport is not suitable for everyone.
- Increased flooding. Danger to homes and businesses. Villagers health and well being at risk with the added anxiety.
- Loss of wildlife. Wildlife habitats will be destroyed.
- Reduced greenbelt. These areas should be protected not adjusted to fit an agenda.
- Loosing village identity. Being a village means a lot to the residents. A true community. What right do you have to take that away. Do you live here?

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5819

Derbyniwyd: 10/03/2026

Respondent ID: 3384

Ymatebydd: Miss Chloe Devereux

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I wish to formally object to the development on land east of Cardiff Road, Dinas Powys.
My concern relates to flooding. This area of land is known locally to flood frequently during periods of heavy rainfall. Developing housing on this site risks exacerbating existing flooding issues, both on the land itself and in surrounding areas.
Cardiff Road already experiences significant traffic congestion and is frequently gridlocked. A development of this size would inevitably place further strain on an already overburdened road network.
There is insufficient local infrastructure to support a development of this scale.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5820

Derbyniwyd: 08/03/2026

Respondent ID: 3386

Ymatebydd: Mrs Mandy Hutchings

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

No impact.

Crynodeb o'r Gynrychiolaeth:

I strongly object to this site being used:
- The increase to congestion. Longer travel times for those sitting in bumper to bumper traffic. Public transport is not suitable for everyone.
- Increased flooding. Danger to homes and businesses. Villagers health and well being at risk with the added anxiety.
- Loss of wildlife. Wildlife habitats will be destroyed.
- Reduced greenbelt. These areas should be protected not adjusted to fit an agenda.
- Loosing village identity. Being a village means a lot to the residents. A true community. What right do you have to take that away. Do you live here?

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5822

Derbyniwyd: 10/03/2026

Respondent ID: 2105

Ymatebydd: Miss Susan foley

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

X

Crynodeb o'r Gynrychiolaeth:

Too much traffic and not enough amenities which are already overstretched

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5826

Derbyniwyd: 10/03/2026

Respondent ID: 3389

Ymatebydd: Richard Griffiths

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed housing allocation HG1 KS2 – Land North of Dinas Powys. The development would significantly increase traffic on already congested roads such as Cardiff Road, worsening safety and delays. Local infrastructure, including schools, GP services, and public transport, is already under pressure and unlikely to cope with further demand without substantial investment. The site currently forms part of the open countryside and development would result in the loss of valuable green space and wildlife habitat. There is increased flood risk given that additional hard surfaces could worsen existing drainage and surface water issues in the area.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5831

Derbyniwyd: 10/03/2026

Respondent ID: 3391

Ymatebydd: Mr Justin Joyce

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Our local infrastructure is so poorly maintained by the council the additional population this development would bring to the area would bring our roads, our schools, our medical facilities to its knees. The area simply cannot cope with the increased volume, this would cause additional severe congestion to the already gridlocked roads, make acquiring a doctor appointment an even more monumental task than it already is and place additional burden on the local schools not to mention the environmental impact a development of this nature would impose on the residents already in situ. I vehemently oppose this plan.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5833

Derbyniwyd: 10/03/2026

Respondent ID: 1531

Ymatebydd: Mr Peter Davis

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

Reference HG1 KS2
I object.
There is no evidence of how future flooding events in Dinas Powys will be mitigated by building 250 houses on land that regularly floods.
The strategic housing plan lacks a strategic infrastructure plan. A single substandard A road as a key main gateway to the Eastern Vale which is already at capacity.
There is no evidence of how air quality will be measured due to stand still traffic caused my additional traffic lights so close to the existing Harrier Junction lights.