Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5833

Derbyniwyd: 10/03/2026

Respondent ID: 1531

Ymatebydd: Mr Peter Davis

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

Reference HG1 KS2
I object.
There is no evidence of how future flooding events in Dinas Powys will be mitigated by building 250 houses on land that regularly floods.
The strategic housing plan lacks a strategic infrastructure plan. A single substandard A road as a key main gateway to the Eastern Vale which is already at capacity.
There is no evidence of how air quality will be measured due to stand still traffic caused my additional traffic lights so close to the existing Harrier Junction lights.

Testun llawn:

Reference HG1 KS2
I object.
There is no evidence of how future flooding events in Dinas Powys will be mitigated by building 250 houses on land that regularly floods.
The strategic housing plan lacks a strategic infrastructure plan. A single substandard A road as a key main gateway to the Eastern Vale which is already at capacity.
There is no evidence of how air quality will be measured due to stand still traffic caused my additional traffic lights so close to the existing Harrier Junction lights.