HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 1 i 30 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4393

Derbyniwyd: 28/01/2026

Respondent ID: 2102

Ymatebydd: Mr Martin Clements

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A accident waiting to happen, the junction adjacent to the merry harriers pub is an accident waiting to happen due to lay out and construction of this junction, the volume of traffic using this junction is beyond acceptance, a small junction with access to Penarth , Dinas Powys , Llandough Hospital and surrounding areas is badly designed and especially with traffic & pedestrians coming from both ways, with the extra housing and no additional infrastructure this is in my opinion a dangerous situation, I would like it recorded that a major incident will happen to the extent that someone killed.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4396

Derbyniwyd: 28/01/2026

Respondent ID: 2751

Ymatebydd: Mr Tim Hackett

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

Cardiff Road from Dinas Powys is already a bottleneck with near constant heavy traffic and queues through Dinas Powys. To have a new development of this number of houses using one exit in and out is madness. I note that lights at the junction will be installed as well. This will just produce huge traffic congestion with the cars and Lorrie’s and vans idling away pumping more fumes into the atmosphere. Madness!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4414

Derbyniwyd: 29/01/2026

Respondent ID: 1472

Ymatebydd: Dinas Powys Community Council

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Dinas Powys Community Council submits this formal objection to the proposed allocation of the Eastbrook site (SP4 KS2) within the Vale of Glamorgan Replacement Local Development Plan (RLDP). The Eastbrook allocation remains fundamentally flawed due to unresolved constraints relating to:

• Flood risk and hydrology
• Highways and transport capacity
• Environmental and landscape impact
• Infrastructure limitations
• Deliverability and viability

The site lies within a hydrologically sensitive catchment characterised by groundwater emergence, overland flow routes, low permeability soils, and a history of significant flood events, including the 2020 incident. Natural Resources Wales (NRW) has repeatedly raised concerns about flood risk at this location, and the Council’s own evidence base acknowledges the need for catchment wide modelling before any development can be considered.

The RLDP does not currently include:

• Mandatory policy wording to secure pre delivery of mitigation
• Requirements for catchment wide modelling
• Guarantees that development will not increase flood risk elsewhere
• Evidence that mitigation is viable, deliverable, and enforceable

Without these safeguards, the allocation fails several tests of soundness, including CE2, CE3, and CE4.

Eastbrook in Dinas Powys is considered to be in a high-risk flood area. It is located within the catchment of the Cadoxton River and its tributary, the East Brook, which have a history of overflowing, causing significant, frequent flooding to homes and roads.

River and Surface Water Flooding: The area experiences flooding from the East Brook and the River Cadoxton. Intense rainfall can also overwhelm the surface water and sewerage systems, causing additional property flooding.

High Water Levels: The ground in the area, particularly in fields adjacent to existing properties, is often described as "totally waterlogged" for significant portions of the year, indicating a high-water table.

Key details regarding flood risk in this area include:
High Risk Area: Natural Resources Wales (NRW) has identified a significant risk of flooding from the Cadoxton River and East Brook, affecting areas like St Cadocs Avenue, Greenfield Avenue, Elm Grove Place, and Cardiff Road.

Significant History: The area has experienced multiple flooding events, including major incidents in 1948, 1986, 1998, 1999, 2008, 2012, 2013, and a severe event in December 2020 where approximately 40-100+ properties were affected.

Future Risk: Due to climate change, the number of properties at risk of flooding in the area is expected to increase from nearly 200 to over 350 by 2117.

Causes: The area suffers from rapid runoff from the surrounding hillsides, which overwhelms the capacity of the river channels and drains.
NRW has been exploring options for a flood management scheme, including natural flood management and potential engineering solutions, to reduce the risk to the community. It is recommended to check the specific, up-to-date flood map for any particular property on the NRW website.

The Dinas Powys Community Council formally requests written confirmation from the Vale of Glamorgan Council addressing the following matters:

1. Has a catchment wide hydraulic model has been commissioned, completed, and agreed with NRW? If so, does the model demonstrate no increase in flood risk to existing properties?
2. Have groundwater emergence, overland flow routes, and the 2020 flood event have been assessed?
3. Are SuDS viable given soil and groundwater constraints?
4. Has downstream drainage capacity been assessed and, if necessary, upgraded?
5. Will education, healthcare, utilities, and highways infrastructure be expanded to support the allocation?
a) Has consultation taken place with the GP surgery/Local schools?
b) What additional services will be provided?
6. Have deliverable and funded mitigation for transport and highways impacts been identified?
a) Please provide figures of air pollution and traffic flow surveys along Cardiff Road. What is the capacity along Cardiff Road?
b) Department of transport will not be investing in Eastbrook station. Therefore, no lift/ramp to address the needs of the community. Yet it is being used to form a decision about the housing. Please explain the reason behind this?
7. Have landscape, biodiversity, and green infrastructure assessments been completed?
a) Apparently the placemaking workshop has helped refine proposals. What are the refinements and when can we see the results from the surveys people completed at the Murchfield consultation?

In the opinion of Dinas Powys Community Council these confirmations are essential to demonstrate that the allocation is sound and that development will not increase flood risk or place unacceptable pressure on local infrastructure.

The Vale Council state that millions of pounds of Dinas Powys S106 funding could be moved to Myrtle Close in Penarth as ‘there are no developments’ in Dinas Powys. If this is the case Eastbrook needs to be removed from the RLDP or the money should stay allocated to Dinas Powys.

The Vale Council allocated 900-1500 houses for Argae lane. But once the site was considered not viable the figures were reviewed and they were reduced in number and moved to another site.

• Where is the evidence that 250 houses are needed in Eastbrook?
• The Eastbrook site was turned down before. Why? What has changed to make it viable now?
• Have the Vale Council exhausted all the key sites outlined in the previous LDP and if not why?
• Have the Vale Council used all of their rolled forward housing sites?
• Have the Vale Council carried out a Sequential Test? Proving there are no lower risk sites available?
• Has the Exception test been carried out? Ensuring the development will be made safe throughout its lifetime without increasing floor risks elsewhere?
• Out of the 250 houses 40% will be affordable housing. Managed by housing associations according to Persimmon glossy proposal. What is classed as affordable housing?
• Birth rate has fallen for a number of years, and the elderly population is increasing. How do you justify these figures? What proportion of the proposed 250 houses will be age friendly?

In the appendix to the Homes and Safe Communities Scrutiny Committee report (6th January 2024), there is a comment regarding the need for bungalows. Residents and councillors enquired about bungalows enabling people to downsize and free up family homes. We were told they are providing what the Vale has requested. We met with housing and they said, ‘it won’t happen’. So knowing there is a need for elderly accommodation what is the plan to address this need?

By 2034, 1 in 4 will be over the age of 65. This is an increase of 75% from 9.3% in 2018 to 13.7% in 2038.

The Vale indicates 70% of the housing need is in Barry/Penarth and Llandough. Of the remaining 30% what percentage is allocated to Dinas Powys? You state greatest areas of demand are Penarth/Barry and Llandough but there is no mention of Dinas Powys.

In conclusion, in the absence of the required evidence and mandatory policy safeguards, the Eastbrook allocation remains unsound. The Dinas Powys Community Council therefore requests that the Vale of Glamorgan Council:

• Removes the Eastbrook allocation from the RLDP, or
• Incorporates the mandatory policy wording and evidence requirements set out above.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4417

Derbyniwyd: 29/01/2026

Respondent ID: 2761

Ymatebydd: Helen Kennedy

Crynodeb o'r Gynrychiolaeth:

I am writing in support of the proposals being consulted on for the land to the north of Dinas Powys. I have lived in Dinas Powys for 10 years, I have a young family and would love for the development to go ahead, as Dinas Powys desperately needs larger houses for growing families.

In my view, the promotion of this site represents a constructive response to those needs and has the potential to contribute positively to the long-term development of Dinas Powys.

I am unable to attend on the 6th February, at Murchfield community centre to voice my support, and so would very much appreciate this responses be included within your consultation summary report, in favour of this desperately needed development for Dinas Powys.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4438

Derbyniwyd: 30/01/2026

Respondent ID: 2202

Ymatebydd: Mr Andrew Bowdler

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

As I nor my family are Welsh speakers it is hard to know. However, i would anticipate that, with the current Welsh Language provision as it is, the proportion of the population would either stay the same as it is, or become even smaller

Crynodeb o'r Gynrychiolaeth:

1. Vehicular access: both are onto an already extremely busy road. We have recently seen even higher than normal car numbers as a result of the closure of Pen-y-Turnpike following the collapse of a tree.
2. Regardless of the SUDS options, the water-retention at Llandough Hospital only works for about 30 minutes, and the proposed area is already very prone to flooding.
3. Schools, medical facilities and other social facilities are already heavily oversubscribed. Are there plans to build new ones before any houses are built here? If there are none - the plans are completely unworkable.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4478

Derbyniwyd: 02/02/2026

Respondent ID: 2807

Ymatebydd: Peter Kennedy

Crynodeb o'r Gynrychiolaeth:

I’m writing in support of the proposed development near Seel Park - Land North of Dinas Powys

I’ve lived in Dinas Powys all my life. Almost 40 years. I have a family of my own now, and we are desperately looking for a larger property, 4 bedrooms, with space for the kids, which would suit us with our family of two adults two children two cats and a dog.

I have contacted persimmon homes to express my interest, as I want to move there ASAP.

As a footnote, whilst there appears to be a very vocal group of Dinas Powys residents protesting this development, I find it really frustrating that they are exclusionary and dismissive or insulting to the views of someone who thinks differently to them.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4480

Derbyniwyd: 01/02/2026

Respondent ID: 2809

Ymatebydd: Audrey Jenkins

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The first issue is the already obvious traffic problems along Cardiff road. The traffic here is a constant concern, with peak times often bringing the road to a total standstill. It is reasonable to presume that the addition of 250 houses will further compound this issue with the additional vehicles.
This is likely to compound the issue further by also increasing traffic to side roads and other entry and exit routes from the village. How do you propose to combat this fundamental problem?

Local facilities and services will undoubtedly be impacted with demand substantially increasing on schools, doctors, dentists, etc. The wait times for these services is already unrealistic for existing residents. How do you propose to remedy the increase in demand?

There are countless other impacts on the environment to consider both during construction and into the future.

Please consider the views of the residents opposing these proposals.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4515

Derbyniwyd: 06/02/2026

Respondent ID: 1547

Ymatebydd: Mrs Debbie Totterdell

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I live in Georges row and the back of our garage floods due to all the water from the proposed fields once there are houses in them it is going to flood my garden too you can't say the flooding won't happen as I have lived here for 18 years and you can not walk the fields in the winter due to so much water there are loads of dips in the field connecting the stream which rise during the winter where is all that water going to go with concrete in the ground traffic is a major concern

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4518

Derbyniwyd: 07/02/2026

Respondent ID: 2830

Ymatebydd: Mr Karl Watkins

Crynodeb o'r Gynrychiolaeth:

The proposed site off Cardiff road, Dinas Powys is the obvious location. Transport links are already in place

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4519

Derbyniwyd: 07/02/2026

Respondent ID: 2830

Ymatebydd: Mr Karl Watkins

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Affordable housing is clearly essential, although I’m very concerned that the information provided for the Dinas Powys development is misleading. In the Persimmon and Boyer information it states ‘up to 40% affordable housing.’ Yet on the large posters at the Murch Community display it said ‘a minimum of 40% affordable housing. Considering the amount of detailed planning that has clearly already been done, this misleading information is very disappointing

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4522

Derbyniwyd: 07/02/2026

Respondent ID: 2833

Ymatebydd: Mrs Christine Gupwell

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Mains water pipeline running through land, this is old and in poor condition, will need replacement. Exit for cars onto Cardiff Road is not acceptable, as there is already bad congestion. Has the extra stress on doctors surgery been addressed as it is now very very difficult to get appointments. Primary school places will increase and there is chaos for parking. now at collection times for pupils. Parking in station is full on weekdays, no space to enlarge, people will more than likely not walk to the train. Why are we using green belt land.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4527

Derbyniwyd: 08/02/2026

Respondent ID: 2837

Ymatebydd: Miss Diana Collins

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

I don't know

Crynodeb o'r Gynrychiolaeth:

EASTBROOK HOUSING PROPOSAL - no substantive improvements have been made to help cope with the current situation with the rivers Cadoxton and Eastbrook after the 2020 flooding - which will be worsened by this plan as they'll be no green space for run off from this development. There appears to be no proposals to improve either cardiff road or the merrier harriers junction to reduce traffic congestion , and as the development is not near any facilities the traffic will worsen. Since moving here just over 2 years ago the traffic congestion has definitely worsened

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4528

Derbyniwyd: 08/02/2026

Respondent ID: 2345

Ymatebydd: Mr Alan Stamp

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Adding yet move traffic on to an already congested road
Adding move demand on a Medical Centre that has already had to absorb Penarth residents and where you cannot get to see a doctor due to the demand
Increasing the demand on local schools that already have children from Barry and Cardiff

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4529

Derbyniwyd: 08/02/2026

Respondent ID: 1536

Ymatebydd: Mrs Elizabeth Stamp

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am concerned about the current traffic congestion in Dinas Powys, which affects residents' health and wellbeing. Additional house building will worsen traffic, especially on roads from Barry to Cardiff, already clogged during peak hours. The proposed entrance near a dangerous bend and potential traffic lights pose safety issues. Increased traffic would lead to more fumes and make cycling difficult. I urge a reconsideration of turning green fields into unsuitable development, as it would negatively impact the community and environment.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4530

Derbyniwyd: 09/02/2026

Respondent ID: 2840

Ymatebydd: Jennifer Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Building more houses in Dinas Powys would worsen already serious flooding risks, with the community still recovering from past severe incidents. It would also intensify traffic pressures on roads that residents say are already unsafe and virtually unusable, increasing danger for drivers and pedestrians alike. Added strain on sewage systems and local services further shows the area cannot absorb large-scale development without significant harm to the community. As a parent of children at Dinas Powys Infants I already hate the levels of pollution from idling cars and this will only intensify.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4536

Derbyniwyd: 09/02/2026

Respondent ID: 1818

Ymatebydd: Mrs Cathy Farr

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I do not think the flooding risk implications for Dinas Powys have been properly investigated. There are two water courses running through Dinas Powys, one directly from this site, and Dinas Powys has been flooding in the last five years when these water courses have been inundated in heavy rain. I was told the water from the proposed site will be kept 'on-site' How? When a bath is full, it overflows - as happens to the attenuation tanks below Llandough hospital, which then feed into the Eastbrook water course, where the overflow for this site will also go.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4537

Derbyniwyd: 09/02/2026

Respondent ID: 2843

Ymatebydd: Ms Andrea Holloway

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

My objection is against the Vale of Glamorgan Replacement Plan 2021-2036 due to the fact that there would be irreversible damage to acres of land with regard to wildlife, absorbed floodwater and carbon. Dinas Powys is a village which has expanded over the years and there has been no additional capacity made at existing health centres and local schools to support this. The transport infrastructure is dire and this proposal will only make getting in and out of Dinas Powys problematic.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4550

Derbyniwyd: 10/02/2026

Respondent ID: 2850

Ymatebydd: Mrs Helen Cook

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

- building on green belt should be avoided, natural environment should be protected for wildlife, flora and fauna
- this area often floods, drainage will be affected by proposed development causing increased flooding on Cardiff road
- increased emissions and pollution from increased traffic which is a health issue for residents, pedestrians, cyclists and the local school children
- increased population will put pressure on GP surgery and local schools
- local roads will be overwhelmed. E.g. junction at Merry Harriers

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4559

Derbyniwyd: 04/02/2026

Respondent ID: 2863

Ymatebydd: Mrs Alison Hubbard

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Is there provision for children requiring for children requiring Welsh School places? Children living in these houses will have to be driven to school, as parents will be too nervous to allow them to walk along what is an incredibly busy road. This is not good for the environment.

Crynodeb o'r Gynrychiolaeth:

I am concerned about the environmental impact of building houses in Dinas Powys, a village with more inhabitants than Cowbridge. There is no space to add facilities, and construction will erode vital green areas affecting mental well-being. Flooding risk will increase as rainwater has limited drainage options, especially given the poor condition of water mains. Traffic congestion will worsen, causing pollution and harm to wildlife. Local services like schools and health facilities are already overstretched, and there are concerns about flood protection and the impact on children's access to Welsh schools.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4561

Derbyniwyd: 08/02/2026

Respondent ID: 2865

Ymatebydd: Mrs Anne Hill

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

No comment

Crynodeb o'r Gynrychiolaeth:

We live in Eastbrook of the traffic going through now is an absolute nightmare and where do you think all this extra traffic will go ? Also the schools & dr's surgeries Can't cope with the number of residents now and don't tell me to use the train station as there isn't enough room to park there of people still use their own transport coming from Barry and Penarth! It's absolutely ridiculous to build all these proposed houses as Dinas is absolutely gridlocked!!
Where's the bypass we were promised years ago!!

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4589

Derbyniwyd: 11/02/2026

Respondent ID: 2683

Ymatebydd: Mr David Barton

Effeithiau ar y Gymraeg:

-

Crynodeb o'r Gynrychiolaeth:

Utilise Traditional Architecture Design Codes for all new construction.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4646

Derbyniwyd: 06/02/2026

Respondent ID: 1503

Ymatebydd: Mr David Davies

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

I AM WELSH, BUT HAVE No INTEREST IN A LANGUAGE of LTTLE USE TO ANYONE IN WALES OTHER THAN IN SMALL AREAS AWAY from THE MAIN WORKING CENTRES

Crynodeb o'r Gynrychiolaeth:

Since 2016, the Welsh Government aimed to build 8,525 houses in The Vale of Glamorgan; about 7,000 have been built, leaving 1,525 short. These developments have added approximately 14,000 adults and an estimated 3,500 children, increasing demand for schools and healthcare. Concerns include insufficient infrastructure, traffic congestion, flooding risks from a proposed water feature, and inadequate road access. Questions remain about the availability of affordable housing for locals and the sustainability of current government policies, with skepticism about the future political landscape.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4648

Derbyniwyd: 07/02/2026

Respondent ID: 2873

Ymatebydd: Mr James Hill

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Somebody please tell people where all the traffic will be able to get in and out of Dinas Powys. We live in Eastbrook and traffic is bumper to bumper moving along Cardiff road in and out of Dinas Powys. The thought of another 250 houses being built is absolute disgusting and stupid. Doctors surgery & schools can't cope as it is at the moment. More people and cars in the area will be absolutely ridiculous. Dinas Powis urgently needs a by-pass road as promised years ago. Looking back the build-up of traffic years ago in Dinas Powis is caused by all the houses being built on Barry docks. With another 700 houses being built in Lavernock and Sully. The congestion in Dinas Powis and Merrie Harrier traffic lights is only going to get very worse. Get your act together.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4649

Derbyniwyd: 06/02/2026

Respondent ID: 2874

Ymatebydd: Mrs Se Fitt

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

There is no space at the local schools. Where are the extra children going to go. Traffic on the single road is heavy. You are likely to miss appointments. A minimum of 300 new cars all driving. It is a single lane road (Cardiff). There is no room for doctors surgeries. They are part time at it is and getting appointment becomes impossible. What happens when you put houses on greenfield. The land floods as it is. This will only happen again as the fields can't soak it up. We will get cut off again in Dinas Powys. New drainage won't do anything. You can't prejudice rainfall or flooding. We were told that the land would never be built on and the green wedge/green belt will be reduced. Consultation method is not very disability friendly.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4650

Derbyniwyd: 30/01/2026

Respondent ID: 2875

Ymatebydd: Mr, Mr and Mrs A,N and R Sweetman

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Detrimental Impact to Existing Residential Amenity

Dinas Powys has already reached its peak in terms of housing development. Further housing development will result in a negative impact to the current residential amenity and local character of Dinas Powys and adversely affect the existing quality of life which makes it attractive and enjoyable for residents and visitors.

Traffic Generation and Highway Safety

The road through Dinas Powys is often gridlocked for long periods on weekdays in particular. The proposed housing development will result in increased vehicle movement on a road already totally inadequate to accommodate existing vehicular volume. The existing road congestion (in Dinas Powys) results from failure to construct the long-debated bypass and recent housing developments in Dinas Powys (Scholars Park) and adjacent areas. Increased vehicle movements, in and through Dinas Powys, will adversely affect road safety, for both pedestrians and cyclists. Furthermore, we already have a situation where long rows of traffic (including many HGVs) are motionless in Cardiff Road, pumping out exhaust fumes, directly adjacent to Dinas Primary School whilst children are arriving and leaving the school or indeed whilst they are playing in the courtyard outside during the day.

Noise and Disturbance
Clearly 250 proposed new houses will result in noise and general disturbance and further congestion, not only in the construction phase but also from the proposed change of use of the land, from pasture and open space to housing. Daily, the proposed development will result increased noise and disturbance from additional traffic movement, not only by residents' and visitors' vehicles but from delivery vehicles and various service providers' vehicles attending properties at the development.

Public Service Capacity and Infrastructure

The proposed development will put additional pressure on local services in Dinas Powys such as Healthcare Provision, GP Services and Schools. An additional 250 houses will put pressure on public sewer and surface water infrastructure with a possible risk of flooding as open land is replaced by hard concrete, footpath and roadway surfaces. It is noted that the proposed development includes a natural 'Drainage Feature'. Does this suggest that the area of land, intended for the proposed development, has suffered with flooding in the past?

Loss of Green Space and Environmental Concerns

The proposed development will result in a loss of critical open green space and a loss of local habitat for wildlife. The area designated for housing development should be safeguarded as valuable open space, farmland and countryside to prevent urban sprawl and the totally unnecessary merging of adjacent areas (in this instance Dinas Powys and Llandough). There are surely other areas, in the VOG, where this development could be located without creating the host of problems and loss of the valuable open green space amenity outlined above.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4676

Derbyniwyd: 13/02/2026

Respondent ID: 2578

Ymatebydd: Mr Tim Griffiths

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

crazy proposal for this area

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4684

Derbyniwyd: 14/02/2026

Respondent ID: 2460

Ymatebydd: Mrs E Kemp

Crynodeb o'r Gynrychiolaeth:

The older estates like the southra have an older population now, the children of those from the area who want to stay local don’t have options of housing. The development is retaining some of the green space and the additional housing is needed.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4693

Derbyniwyd: 16/02/2026

Respondent ID: 1548

Ymatebydd: Ms Melanie Daniel

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed development of approximately 500 homes off Cardiff Road, citing concerns over strained local infrastructure. Schools, healthcare, and GP services are already at capacity, with no clear plans for expansion. The development would worsen traffic congestion, increase journey times, and impact safety and air quality. It would also harm the area's character by creating urban sprawl and diminishing the semi-rural feel. I believe approval should be withheld unless firm, funded plans are in place to address these issues.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4702

Derbyniwyd: 16/02/2026

Respondent ID: 1982

Ymatebydd: Miss Mari-Wyn Elias-Jones

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Strong objection to the new housing development proposed on a site leading off Cardiff Road which will cause more traffic, more congestion and more pressure on a village that's already at capacity.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4716

Derbyniwyd: 06/02/2026

Respondent ID: 2116

Ymatebydd: Mr Peter Coleman

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Cardiff Road is clearly not "traffic sensitive" under the terms and criteria laid out in "New roads and street works act 1991 part 2" This development will clearly exasperate the situation!! Which is already appalling.
What is being done to avoid any further deteriorate the situation??