HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 91 i 120 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4826

Derbyniwyd: 23/02/2026

Respondent ID: 1552

Ymatebydd: Mrs Elizabeth Davis

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I oppose the proposed development of 250 houses in Dinas Powys due to concerns over increased traffic congestion along Cardiff Road, especially affecting Redlands Road and Merrie Harriers junction. Eastbrook Station is inadequate for wheelchair users and sometimes still run old two carriage trains, plus the bus services are unreliable. The narrowness of Cardiff Road poses accessibility issues. Local health and education facilities are already at capacity, and there are serious flood risks following past flooding and pipe collapses. More homes will generate further flooding and more sewage. I believe these factors make the development unsuitable for the area.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4828

Derbyniwyd: 23/02/2026

Respondent ID: 1586

Ymatebydd: Mrs Beata Price

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

No impact

Crynodeb o'r Gynrychiolaeth:

Dinas Powys can't cope with hundreds more houses. Increased congestion. 500 additional cars will cause standstill on Cardiff road. All roads around Dinas Powys are at full capacity, there are no upgrades.
Increased flooding. Our garden is often wet, being on slope from the fields where the proposed development is. The fields and trees hold lots of the rain water at the moment. With concrete, the rainwater will flow directly down to Millbrook Heights, St David's Av, Justin close and other streets will be affected by floods.
GP surgery and school are at full capacity already.
Trains are too full at peak hours. All services are at full capacity.
Wildlife is a huge part of Dinas Powys, people enjoy nature and a big house development will negatively impact the wildlife and the Village identity.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4829

Derbyniwyd: 23/02/2026

Respondent ID: 2972

Ymatebydd: Mrs Amanda Paines

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Why is this a consideration? I am a proud Welsh born and bred woman, but cannot speak the language, I am more worried about the village in which I have lived in for over 60 years, and now my children and grandchildren live in, just cannot cope with any extra burdens on our very stretched resources, sorry but not sure what the Welsh language has to do with this matter at all!

Crynodeb o'r Gynrychiolaeth:

Dinas Powys is a lovely village to live in, however, we are bursting at the seams and the infrastructure just is not in place for more houses to be built or accommodated. Our schools are over subscribed, our doctors cannot cope with the demands they already have in them and more traffic would cause more congestion, and damage the already pothole ridden roads. There are only 2 roads in and out of the village, the main Cardiff Road, up and along Penyturnpike to Leckwith, or if you want to take your life into your own hands, along the Sully Road!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4830

Derbyniwyd: 23/02/2026

Respondent ID: 2974

Ymatebydd: Mr Alun Pincombe

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The current state of utility infrastructure—specifically water and electricity—shows evidence of deferred maintenance, resulting in an increased frequency of service failures in recent years. Compounding this, the area is inherently prone to flooding; developing on land with poor natural drainage will likely exacerbate this risk. This is particularly concerning given the absence of proactive maintenance programs to ensure drains and waterways remain clear of debris, which collectively places additional strain on community resilience. Furthermore, introducing over 250 additional vehicles to the local road network will do little to alleviate existing traffic volumes within the village.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4831

Derbyniwyd: 23/02/2026

Respondent ID: 2976

Ymatebydd: Mr Philip Hayes

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

What a ridiculous question.

Crynodeb o'r Gynrychiolaeth:

I object to HG1 KS2. We do not have the infrastructure to cope with the houses we have currently. More houses will compound the problem. Active travel does not work, all of these new houses will have driveways, which will fill up with cars!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4832

Derbyniwyd: 23/02/2026

Respondent ID: 2977

Ymatebydd: Mrs Amy Harding

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Increased traffic,
Increased demands on healthcare services locally
influx of need for school places.

Damage to the environment and local wildlife.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4833

Derbyniwyd: 23/02/2026

Respondent ID: 2977

Ymatebydd: Mrs Amy Harding

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Increased traffic
Increased demands on local healthcare
Damage to environment/wildlife

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4835

Derbyniwyd: 23/02/2026

Respondent ID: 2978

Ymatebydd: David Pain

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the planning application for 250 new dwellings in Dinas Powys, citing concerns about highway safety, traffic congestion, flood risk, and infrastructure capacity. Cardiff Road is already congested; additional vehicles would worsen this, increasing air pollution and safety risks. Flooding issues could be intensified without proper drainage. Healthcare and school services are already overstretched and cannot support new residents without improvements. Relying on rail use to reduce traffic is unrealistic. I request refusal due to these cumulative infrastructure pressures and sustainability concerns.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4836

Derbyniwyd: 23/02/2026

Respondent ID: 2944

Ymatebydd: Mrs Christine Boston

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the housing development on Cardiff Road, Dinas Powys, due to concerns about infrastructure, flooding, pollution, and community impact. The existing transport links are inadequate and congested, and active travel routes are unsafe. Building on green space would damage habitats and strain local services like schools and healthcare. Dinas Powys is already vulnerable to flooding, and additional sewage discharge could worsen pollution in nearby waters. Finally, the development threatens the village’s identity and community cohesion.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4837

Derbyniwyd: 23/02/2026

Respondent ID: 2973

Ymatebydd: Mrs Sarah Miller

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed development of 250 houses in Dinas Powys, citing increased congestion on Cardiff Road, limited parking, and poor pedestrian access to Eastbrook train station. I am concerned about the loss of green belt, mature hedgerows, and local wildlife, as well as the erosion of Dinas Powys’s identity. The development risks worsening flooding issues and overburdening existing services like schools and healthcare. I believe there are alternative brownfield sites elsewhere in the Vale that would cause less harm to residents, the environment, and local infrastructure.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4838

Derbyniwyd: 23/02/2026

Respondent ID: 2980

Ymatebydd: Alan Blakoe

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I am extremely concerned about the proposed development of 250 houses along Cardiff Road. It would significantly increase pressure on our already overburdened healthcare services and worsen traffic congestion, which has been a longstanding issue. The additional 500 to 1000 residents would likely cause further flooding, pollution, and traffic queues, and reduce water absorption by the land, increasing flood risks. Our village has already absorbed many new residents, and I believe infrastructure improvements are necessary before approving such development. I urge the scheme to be abandoned.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4839

Derbyniwyd: 24/02/2026

Respondent ID: 2981

Ymatebydd: Mrs Christine Begg

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Difficult to tell without additional information.

Crynodeb o'r Gynrychiolaeth:

With reference to planning reference HG1 KS2, I object to more housing as the infrastructure is not in place for the current population. The traffic trying to get through the village is ridiculous at all times of day and not just peak times, the roads are in a poor condition and active travel along Cardiff Road is unsuitable. The village has lost its identity.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4840

Derbyniwyd: 24/02/2026

Respondent ID: 2982

Ymatebydd: Ms Dionne Shillabeer

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

No one speaks welsh. It's a complete waste of time, money and effort to keep pushing the welsh language.

Crynodeb o'r Gynrychiolaeth:

I am concerned that building houses on this site will worsen existing traffic congestion on Cardiff Road, which already suffers from heavy use, impacting air quality and road condition. The loss of green space will harm local wildlife and increase flood risk by reducing natural drainage. Additionally, local healthcare and educational facilities are already at capacity and cannot accommodate a significant increase in population. These issues raise serious concerns about the environmental and social sustainability of the proposed development.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4841

Derbyniwyd: 24/02/2026

Respondent ID: 2186

Ymatebydd: Mrs Rachel Whitehurst

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Strongly object to building on this proposed site 444 in Dinas Powys. Cardiff Rd can not take any more traffic, schools are already over subscribed. Already impossible to get a doctors appointment. In addition to all these points, the loss of green space, nature and wildlife is devastating for the local environment and community.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4842

Derbyniwyd: 24/02/2026

Respondent ID: 1496

Ymatebydd: Mr FRANK COLEMAN

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

I object to the housing development north of Dinas Powys due to concerns over worsening traffic congestion and drainage problems. The proposal relies heavily on public transport and active travel, which is unrealistic given current congestion and hazardous cycling conditions. Statements claiming sufficient capacity and minimal delays are contradicted by existing traffic issues. Additionally, drainage plans appear to ignore downstream effects, particularly in vulnerable areas like Sunnycroft estate. Overall, I believe the proposal underestimates the severity of existing problems and the impact of the development.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4843

Derbyniwyd: 24/02/2026

Respondent ID: 1673

Ymatebydd: Miss Hannah Lloyd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Not viable. Increase of traffic and not the public transport to help this

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4844

Derbyniwyd: 24/02/2026

Respondent ID: 2984

Ymatebydd: Mrs Zelda Smith

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed HG1 KS2 development in Dinas Powys, citing overdevelopment that threatens the village’s character, infrastructure, environment, and services. The development could add 500 vehicles, worsening traffic congestion without upgrades. It risks overburdening schools, GP services, and increases flood risk. Public transport is already overcrowded, and the village’s historic landscape and rural setting would be harmed. I urge that these concerns be seriously considered to prevent unacceptable impacts on the community and environment.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4846

Derbyniwyd: 24/02/2026

Respondent ID: 2986

Ymatebydd: Mrs Vivyenne Pritchard

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Land is waterlogged if built on water will only flow into eastbrook and down through Dinas Powis creating more flooding. Cardiff Rd is already gridlocked .not capable of taking more traffic.more pollution. site entrances will cross the ONLY footpath/cycle path out of Dinas also crossing bus/taxi lane that was deemed necessary. Destruction of natural habitat for wildlife. Train service already overstretched

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4849

Derbyniwyd: 23/02/2026

Respondent ID: 2988

Ymatebydd: Miss Candice Boyes

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

No impact.

Crynodeb o'r Gynrychiolaeth:

Congestion is already at its limit for this area surrounding the proposed plans, particularly the road itself adjacent (Cardiff Road), this would cause untenable congestion issues as well as parking and increased road damage issues.
The road also leads directly to the hospital, so the increased congestion would inevitably impact and cause serious risks for the ambulance service in reaching destinations, including getting patients to emergency services in time.
The village is small and services are at capacity, including schools, dentists, gp surgeries etc., so this proposal going ahead would cause multiple issues for both local council and residents.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4850

Derbyniwyd: 23/02/2026

Respondent ID: 1947

Ymatebydd: Mr Kevin Davis

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I oppose the plan for 250 new houses north of Cardiff Road, Dinas Powys. I am concerned about increased traffic congestion, hazardous cycling conditions, and pollution affecting local schools and nurseries. Public transport options are inadequate, especially for those with limited mobility. The narrow pavements along Cardiff Road and capacity issues at health centres and schools raise further worries. Flooding history suggests additional building risks increasing flood danger. What plans are there in place to ensure the existing wildlife habitat is not adversely affected? Past promises of infrastructure improvements have not been fulfilled, casting doubt on future enhancements.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4851

Derbyniwyd: 24/02/2026

Respondent ID: 2045

Ymatebydd: Mr Andy Paterson

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

No impact.

Crynodeb o'r Gynrychiolaeth:

I object to the proposed development of 250 homes on Cardiff Road, Dinas Powys. I am concerned about increased flood risk and drainage issues due to the loss of permeable agricultural land. The additional homes would worsen surface water runoff and flooding without clear and proven mitigation. Traffic congestion on Cardiff Road would increase, raising safety and pollution concerns. The site supports local wildlife, including bats and birds, and development would harm biodiversity which would be contrary to environmental and sustainability priorities. Local services are already stretched; additional demand could overwhelm healthcare and educational facilities. It is unclear how these services would be expanded to accommodate the increase in population. I urge rejection of this proposal.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4852

Derbyniwyd: 24/02/2026

Respondent ID: 2989

Ymatebydd: Mr and Mrs M A Hayley

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

With regard to the proposed new homes in Dinas Powys, we strongly object as this project would cause chaos to an already over burdened infrastructure, which would have a detrimental affect to schools, health, traffic etc.
More detailed outlined proposals would be appreciated. The current plan would appear to disregard the above details.
I would be grateful for your reply on this matter.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4853

Derbyniwyd: 24/02/2026

Respondent ID: 1850

Ymatebydd: Mr Mark Somers

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Too much existing congestion. Schools and GP's already at capacity, Increased flooding, Reduced greenbelt, Dinas Powys loosing its identity as a village.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4854

Derbyniwyd: 24/02/2026

Respondent ID: 2946

Ymatebydd: Mr Mike Burden

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This development is not welcome. It’s overloading the village, and will result in a loss of identity on top of all the other infrastructure issues. On top of that, the site floods.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4855

Derbyniwyd: 24/02/2026

Respondent ID: 2990

Ymatebydd: Mr Chris Lewis

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The village of Dinas Powys is already at capacity in terms of schools, doctors, and traffic on
Cardiff Road. The development of 250 new houses near to the village would create an unsustainable situation for people living here and Dinas Powys would lose its identity as a village. There would also be concern around increased flooding risk to Cadoxton River.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4856

Derbyniwyd: 25/02/2026

Respondent ID: 1562

Ymatebydd: Miss Claire Warner

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

The local welsh school has already been under scrutiny due to the lack of welsh spoken outside or school and in social environments; people will just move here for housing with no regard to the village community, it’s welsh speakers or the village heritage

Crynodeb o'r Gynrychiolaeth:

I moved to Dinas because it is a village with a good local school. The proposed 250 additional homes threaten the village’s status and strain the existing infrastructure, which cannot cope even after adaptations. Traffic congestion already occurs on Cardiff Road, and further expansion is impossible, risking chaos. Flooding and drainage issues will worsen with more homes. Crime and drug problems have increased due to more social housing, compromising the village’s safety. I believe Dinas cannot support this development.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4861

Derbyniwyd: 25/02/2026

Respondent ID: 2991

Ymatebydd: Mrs Ailsa Enos

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Erosion of green belt

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4866

Derbyniwyd: 25/02/2026

Respondent ID: 1782

Ymatebydd: Mrs Michelle Doran

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Local infrastructure is already at breaking point. I’ve lived here for nearly 30 years and it’s not getting any better; our standard of living is falling. What are we doing!!!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4867

Derbyniwyd: 24/02/2026

Respondent ID: 2992

Ymatebydd: Mr Mathew Hobbis

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

I do not believe this development will have any real effect on the Welsh language.

Crynodeb o'r Gynrychiolaeth:

I object to the plan for 250 new homes behind Georges Row in Dinas Powys. Recent developments have already strained local infrastructure, causing severe congestion, delayed emergency responses, increased road pollution, and heightened flood risks due to more concrete covering greenbelt areas. Local services like healthcare and schools are overcrowded, and wildlife habitats are being lost. I believe these issues will worsen with the proposed development, and I urge reconsideration to protect the community and environment.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4868

Derbyniwyd: 24/02/2026

Respondent ID: 2993

Ymatebydd: Mr Charlie Laundon

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I oppose the proposed development in Dinas Powys due to concerns about traffic congestion and pollution, which could affect my chronic asthma. Having moved here for a healthier lifestyle, I believe the current infrastructure is strained and that adding 250 new houses next to an already congested road is unwise. I support more housing in the Vale but feel this plan is poorly considered. I urge supporters to visit Dinas Powys during the day to see the severe congestion firsthand.

Atodiadau: