HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 151 i 180 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4946

Derbyniwyd: 27/02/2026

Respondent ID: 3031

Ymatebydd: Mrs Paula Bugler

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Not much, as there is no nursery/primary school provision for the Welsh language

Crynodeb o'r Gynrychiolaeth:

The plan is unsustainable unless significant work is done around infrastructure. The roads around Dinas are already overwhelmed with the current traffic. The access proposed onto Cardiff Road is a hazard to traffic and pedestrians. Air quality in this area will be impacted by the levels of stationary cars. The village is liable to flooding, from excess storm water and the current levels of waste water, any further homes will overwhelm the waste management system. The provision for nursery (both private and state) and schools are already over subscribed. The medical provision is already crippled by a lack of capacity.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4954

Derbyniwyd: 27/02/2026

Respondent ID: 2923

Ymatebydd: Miss Charlotte Blake

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I oppose the proposal to build a large number of homes on land that currently acts as a flood defence for Dinas Powys and Michaelston-le-Pit, as this would increase flooding risk and cause structural issues. The development would result in significant loss of green space, wildlife, and ancient woodland, causing irreversible environmental damage. Existing infrastructure is already strained, with overcrowded healthcare, poor public transport, and deteriorating roads, which would worsen with increased population. I believe alternative brownfield sites should be considered to avoid damaging the community and environment.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4956

Derbyniwyd: 27/02/2026

Respondent ID: 3039

Ymatebydd: Miss Laura Morris

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Concern of over whelming health services and traffic congestion

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4957

Derbyniwyd: 27/02/2026

Respondent ID: 3040

Ymatebydd: Miss Cath Thomas

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Traffic congestion and over whelming of Dinas Powys as a whole

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4961

Derbyniwyd: 27/02/2026

Respondent ID: 2099

Ymatebydd: Mr Brian Eccleshare

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the LDP candidate site BP18A off Cardiff Road, Dinas Powys, due to concerns about increased traffic congestion on a major route, pressure on local facilities, negative biodiversity impacts, flood risks, and loss of green belt. I believe there are more suitable brownfield sites elsewhere in the Vale of Glamorgan that would avoid damaging local areas, and I am concerned that current planning decisions lack adequate consideration.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4962

Derbyniwyd: 27/02/2026

Respondent ID: 3042

Ymatebydd: Mrs Charlotte Thrupp

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Referring back to the Wellbeing of Future Generations act (2015), the proposed development will contradict the act's intention to improve and encourage Welsh language use in the area.

The development is pinned on the impossible assumption that new residents will rely on public transport, walking and cycling rather than cars to travel. There are no Welsh language schools within walking or cycling distance of the proposed development site. The closest would be Ysgol Pen y Garth, which arguably could be accessed by foot or bicycle. However, you would be encouraging parents to walk very young children across a major road and along precarious, unlit country lanes where vehicles travel at speed. Putting children and families at such high risk is morally wrong. The only option to access Welsh medium education in the Vale is to drive.

Therefore, there is no incentive to live in a development that's key 'selling point' is its proximity to public transport. Welsh speaking families would then be actively discouraged from wanting to live in the development, and thus Dinas Powys would be denied the opportunity to increase its Welsh-speaking representation. This directly contradicts the Wellbeing of Future generations act (2015).

Crynodeb o'r Gynrychiolaeth:

I strongly object to the proposed development, citing inadequate site research and concerns over pedestrian safety on Georges Row, which is private land used by residents and vehicles. The plan ignores the need for additional healthcare facilities, risking overstretched GP services at Dinas Powys Medical Centre. It contradicts the Well-being of Future Generations Act by harming biodiversity, increasing flooding, and removing vital carbon sinks. The development will also lead to higher pollution and traffic, undermining residents’ health and reducing access to green spaces and countryside.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4965

Derbyniwyd: 27/02/2026

Respondent ID: 1601

Ymatebydd: Mrs Rebecca Rossiter

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Referring back to the Wellbeing of Future Generations act (2015), the proposed development will contradict the act's intention to improve and encourage Welsh language use in the area.

The development is pinned on the impossible assumption that new residents will rely on public transport, walking and cycling rather than cars to travel. There are no Welsh language schools within walking or cycling distance of the proposed development site. The closest would be Ysgol Pen y Garth, which arguably could be accessed by foot or bicycle. However, you would be encouraging parents to walk very young children across a major road and along precarious, unlit country lanes with no dedicated pedestrian walkway where vehicles travel at speed. Putting children and families at such high risk is morally wrong. The only option to access Welsh medium education in the Vale is to drive.

Therefore, there is no incentive to live in a development that's key 'selling point' is its proximity to public transport. Welsh speaking families would then be actively discouraged from wanting to live in the development, and thus Dinas Powys would be denied the opportunity to increase its Welsh-speaking representation. This directly contradicts the Wellbeing of Future generations act (2015).

Crynodeb o'r Gynrychiolaeth:

I strongly oppose the proposed development. The plan suggests pedestrian access via a private lane at Georges Row, which will be resisted. A number of large vehicles, such as campervans and work vans, use the lane. Encouraging pedestrians to use it will put people at risk of harm from those moving vehicles. It claims the development will not impact traffic, yet encourages residents to avoid Cardiff Road, creating confusion. The proposal neglects the need for additional healthcare facilities, risking overburdening existing services. It contradicts the Well-being of Future Generations Act by harming biodiversity, increasing flood risk, and reducing green space that benefits mental and physical health. The development will increase pollution and traffic, further damaging the environment and community well-being.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4967

Derbyniwyd: 25/02/2026

Respondent ID: 3043

Ymatebydd: Mr John Fearon

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I believe the proposed development of 250 homes will cause significant traffic congestion, especially along Cardiff Road, by adding 500-750 vehicles, similar to issues seen at Southra Park. Water runoff from Eastbrook may increase flooding and sewage problems in the area. Local healthcare and education facilities are already at capacity, and the additional residents would strain them further. The development threatens wildlife habitats and the Greenbelt. Parking shortages at local stations will worsen traffic and extend rush hours. Overall, I feel this proposal would harm Dinas Powys’s community and environment.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4968

Derbyniwyd: 25/02/2026

Respondent ID: 3044

Ymatebydd: Mrs Michaela Fearon

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the HG1 KS2 proposal for 250 homes, citing concerns about increased traffic, with 500-750 additional vehicles, causing congestion along Cardiff Road and access issues to Dinas Powys, Llandough, and Penarth. Water runoff from Eastbrook may worsen flooding and sewage problems. Local healthcare and education facilities are already at capacity, risking further strain. The development threatens wildlife habitats and the Greenbelt area north-east of Dinas Powys. Under-resourced stations may see more vehicle use, increasing traffic, and the village’s character is at risk of erosion.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4969

Derbyniwyd: 27/02/2026

Respondent ID: 3045

Ymatebydd: Mr Jonathan Poley

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

It is unbelievable you wish to build more houses where there is no room and no facilities to support them. Stop thinking about the money!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4970

Derbyniwyd: 27/02/2026

Respondent ID: 3046

Ymatebydd: Mrs Kathryn Wintle

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

What a ridiculous question!

Crynodeb o'r Gynrychiolaeth:

I object as Dinas Powys does not have the infrastructure to accommodate a large number of new houses. The village is already gridlocked with traffic and local schools and GPs are over subscribed. We also have flooding issues which will be exacerbated causing misery to our friends and neighbours. As a council you already know this and it would be irresponsible of you to grant the application. Please do not continue with this until all the remediating actions are put in place to accommodate a huge increase in population

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4971

Derbyniwyd: 28/02/2026

Respondent ID: 3048

Ymatebydd: Mrs Anne Jones

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

I speak Welsh, what the heck relevance does this have?

Crynodeb o'r Gynrychiolaeth:

I cannot believe that such a huge development can be contemplated. DP is already saturated to the gunnels and has long since stopped being the “village” I moved to 40 years ago. We are not part of Penarth, Llandough or Cardiff, which this development will further. Where are the schools, surgeries and infrastructures which require this “city” to work. Try getting out of DP at 8.30 am for a hospital appointment at Llandough at 10.00 am and you’ll just about make it!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4972

Derbyniwyd: 28/02/2026

Respondent ID: 3049

Ymatebydd: Mrs Ceri Morgan

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Risk of flooding greatly increased .Traffic issues greatly increased .Lack of spaces at schools and GP ‘s will be a huge issue .

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4973

Derbyniwyd: 28/02/2026

Respondent ID: 3050

Ymatebydd: Mr Michael Hicks

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The current infrastructure in Dinas Powys cannot support the amount of additional houses proposed, inclusive of the current state of roads, Doctors surgery, schools, nurseries and access and egress through Dinas.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4974

Derbyniwyd: 28/02/2026

Respondent ID: 2048

Ymatebydd: Geraint Scott

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Although there is space in the local Welsh school there are no Welsh speaking provision within other local services.

Crynodeb o'r Gynrychiolaeth:

Insufficient thought has been given to the lack of resources available to support this new housing area. This includes basic medical provision. Adding to the already over subscribed provision poses a significant risk to all. The roads infrastructure in Dinas Powys is not fit for purpose as it is with significant delays even outside peak travel times.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4975

Derbyniwyd: 28/02/2026

Respondent ID: 3051

Ymatebydd: Mrs Stacy Scott

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Loads - although there is a small amount of room in one of the Welsh local primary schools, there is no provision for any other services.

Crynodeb o'r Gynrychiolaeth:

Way too much traffic congestion already - more homes brings more cars. Schools are already full. Already difficult to get a doctors appointment. More houses means less appointments available. Bigger stretch for the NHS and the local ambulance crews. Waiting 5 hours for an ambulance already - be longer with more housing and more people. There is an increased flooding risk. It has already caused havoc that has not been resolved yet with houses not receiving their flood proof doors. I do not want Dinas Powys to turn into a town. Affects way too much wildlife.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4979

Derbyniwyd: 28/02/2026

Respondent ID: 3052

Ymatebydd: Mr Tim James

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The infrastructure does not cater for the current volume of traffic, it would be so much worse with 250 more hoses.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4981

Derbyniwyd: 28/02/2026

Respondent ID: 3053

Ymatebydd: Mrs Jennifer James

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Can’t get an appointment with a doctor, schools are over crowded and it’s currently impossible to travel on the road through Dinas Powys at any time of day due to congestion, 250 more hoses in this location will just make matters so much worse, isn’t that obvious.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4986

Derbyniwyd: 28/02/2026

Respondent ID: 3055

Ymatebydd: Mr Alexander Whitehurst

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am very concerned about this plan and wish to strongly object. Building on green belt, lack of infrastructure, traffic congestion, lack of schools and doctors and buckling an already stretched system. Flooding will be critical. This has to stop.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4989

Derbyniwyd: 28/02/2026

Respondent ID: 3058

Ymatebydd: Ms Dianne Hayes

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Flood risk
Pollution
healthcare
Education
Traffic management
Utilities
Wildlife
Travel

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4992

Derbyniwyd: 28/02/2026

Respondent ID: 3061

Ymatebydd: Mr Peter Robinson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Dinas Powys/Llandough just does not have the infrastructure to support this many new homes. The doctors surgery already seems to be at breaking point and the roads are already way over subscribed and suffering from lack of maintenance. Without a Dinas Powys bypass this is unfeasible. Not to mention the potential issues with flooding.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4994

Derbyniwyd: 28/02/2026

Respondent ID: 3063

Ymatebydd: Mr Mark Taylor

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Objection to Site HG1 KS2 (Land North of Dinas Powys)
As a Dinas Powys resident, I strongly object to the allocation of HG1 KS2 for up to 250 homes. The site would cause unacceptable traffic congestion on already overloaded Cardiff Road and local junctions. It would erode the valued countryside gap, harm the Special Landscape Area, and strain schools, GPs, and drainage infrastructure. Brownfield options should be prioritised first. This development is unsustainable and contrary to preserving Dinas Powys' character.
Resident, Dinas Powys

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4995

Derbyniwyd: 01/03/2026

Respondent ID: 3066

Ymatebydd: Mrs Avril Terrar

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Dinas powys is congested without the need for more housing. The infrastructure won’t support and is on the verge of collapse. The roads are always congested, there aren’t enough schools, doctors and dental surgeries to support the population as is. The roads are in a dangerous state and I am sick of the council not listening to the people they serve.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4998

Derbyniwyd: 01/03/2026

Respondent ID: 3067

Ymatebydd: Miss Kate Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Every resident in Dinas opposes this plan! And the fact you make it so difficult to object. Shows you know this.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5001

Derbyniwyd: 01/03/2026

Respondent ID: 3070

Ymatebydd: Mrs Sian Board

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The road out of and into Dinas Powis is already heavily congested and adding more houses will make this intolerable. There aren’t enough school places and doctors for those of us who live in Dinas Powis already. Dinas Powis is a village and we don’t want to be joined to Llandough/Penarth.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5002

Derbyniwyd: 25/02/2026

Respondent ID: 3071

Ymatebydd: Mr Nigel Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

As Regards Plan HG1 KS2
I consider the plan and over development. The infrastructure cannot take another 250 house. Cardiff Road is extremely busy all day. The health centre, schools etc are at capacity.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5003

Derbyniwyd: 26/02/2026

Respondent ID: 1480

Ymatebydd: Mrs Valerie Leung

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the allocation of Site SP4 KS2 in Dinas Powys, considering it unsound, inconsistent, and contrary to national planning policy. The site was previously rejected for similar constraints, and its designation within a Green Wedge aims to prevent settlement coalescence and protect open countryside, which would be compromised. The assessment process shows inconsistencies, and there are significant concerns regarding highways, traffic, air quality, flood risk, sewage capacity, education infrastructure, and the loss of valuable agricultural land and natural habitats. I request that the allocation be removed.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5004

Derbyniwyd: 28/02/2026

Respondent ID: 1918

Ymatebydd: Mrs Sheila Allsop

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

HG1 KS2: Planning Reference: Whoever came up with this idea for 250 homes on the land at Eastbrook has obviously never had to access Dinas Powys at any time of day as the traffic through here at all times is utterly ridiculous. Not only do we not have the capacity for anymore traffic the doctors surgery is at capacity also dental practices, schools as well are full. As has already been demonstrated by flooding issues over the past couple of years the infrastructure e.g water and sewage system is under serious pressure as demonstrated by the burst mains at the latter part of last year. Also access to the sight onto the only road through here is farcical to say the least. I have lived in Dinas since 1975 and have watched the ruination of this VILLAGE it certainly needs some serious thought concerning this pathetic proposal.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5005

Derbyniwyd: 28/02/2026

Respondent ID: 3073

Ymatebydd: Dr Stuart Keeping

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the above plan for two main reasons: increased risk of flooding and increased traffic.
I do not object in principle to adding new houses in Dinas Powys as I recognise the need to provide more homes, however prior to building new homes it is necessary to make improvments to the managment of the Cadoxton river and the road infrastructure.

The council will be aware of flooding which occured in the village in December and February 2020. Recently in early January 2026 there was an alert to residents who live in the most flood-sensitive parts of Dinas Powys, due to anticipated heavy rainfall. Due to Global warming it's inevitable that further flooding will occur and flood avoidance measures need to be planned. I have not seen evidence of significant improvements in managing potential flooding in the village since the 2020 floods. Measures neeed to be put in place to store water in the upper reaches of the river . Furthermore it's obvious that adding more housing with tarmac and concrete replacing fields will reduce the capacity of the land to absorb rainfall and furthe rincrease the risk of flooding . The risk of flooding needs to be reduced prior to further adding more stress on the drainage system.

I have lived in Dinas Powys for about 25 years and the traffic has increased significantly over the past 2-3 years. The traffiic is heavy on Cardiff Road which is the main thoroughfare between Cardiff and Barry through the village. The addition of significant new housing at the top of Murch Crescent (former site of the Dinas Powys part of St Cyres school) has further added to the traffic. I cycle along Cardiff Road from the village to llandough Hosptial on my way to work and know that the traffic at rush hour times is extremely slow, This situation is reversed at the end of the day with traffic proceeding very slowly heading through Dinas on the way to Barry. Adding further houses will of course further increase the problem . There is a therefore a strong need to increase the infrastructure of the road system , perhaps by providing a relief road parallel to Cardiff Rd, or by other means? prior to building new houses. I look forward to hearing your arguments on this matter and am happy to discuss it further.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5006

Derbyniwyd: 01/03/2026

Respondent ID: 1861

Ymatebydd: Miss Victoria Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I would like to express my objections to the above-referenced planning proposal. Whilst I agree new houses are needed, I totally disagree with the positioning of the proposed housing development. They will be placed on a much-needed natural drainage area, resulting in an increased risk of flooding of the established houses. Along with the subsequent environmental consequences. Cardiff Road and the junction by the Merrier Harrier public house are already very congested, with no meaningful way of increasing road capacity or the possible introduction of viable "active travel" lanes, as the road is largely too narrow and surrounded by houses on both sides. How will A4055 cope with increased traffic? The infrastructure in Dinas Powys is already stretched to its limit with over-subscribed schools, GPs, dentists etc. The public transport provision is inadequate, especially for busy residents who need to get their children to school and themselves to work by the required time. Dinas Powys is a village with beautiful green spaces, walkways, and areas of natural beauty that add character and charm to the village. This development will severely impact the village greenbelt, the environment, and the quality of living environment in the village. As a council that is driven by the environment, green policies, and an anti-car agenda, are there plans to increase the bus provision? Will these houses be carbon neutral? Will they all have solar panels? Will trees be planted as an offset to the removal of a greenfield site? How will the children fit into already over-subscribed schools? Please consider the negative impact this housing estate will have on an already overpopulated area with limited infrastructure.

Atodiadau: