HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 211 i 240 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5098

Derbyniwyd: 03/03/2026

Respondent ID: 1986

Ymatebydd: Mr Stephen B Hann

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am protesting the proposed plan to build 250 houses on land at Eastbrook. I was unable to attend the consultation events but am concerned about flooding risks, as the brook runs in front of my property and previously flooded on Christmas Eve a few years ago. Building houses on the contributory of the brook and the fields could increase the risk of flooding for our homes and main roads. I urge the council to consider these issues and take action to protect residents from potential flooding problems.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5102

Derbyniwyd: 04/03/2026

Respondent ID: 2116

Ymatebydd: Mr Peter Coleman

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed development at Eastbrook, Dinas Powys on five grounds. It would worsen congestion on the busiest road, contradicting the purpose of the New Roads and Street Works Act 1991. The development could increase air pollution and conflicts with Welsh Government’s moratorium on new roads, as it plans for new road construction. It risks flooding by disrupting natural drainage and may overload the local health centre, reducing service quality. I urge the council to address these concerns and stop this plan.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5107

Derbyniwyd: 04/03/2026

Respondent ID: 3128

Ymatebydd: Mr Josh Andrews

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

No impact

Crynodeb o'r Gynrychiolaeth:

I strongly object to the plan to build 250+ new houses on Cardiff Road in Dinas Powys. Having lived in the village for 7 years I am shocked at these proposals. My previous house on Greenfield Ave flooded in 2019 and this will only add to the flood risk. The roads are simply not fit for purpose with all the Barry traffic into Cardiff, adding more would be madness. The doctors and schools are at capacity. We simply cannot have more houses in Dinas Powys.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5109

Derbyniwyd: 04/03/2026

Respondent ID: 3130

Ymatebydd: Mr Malcolm Lane

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I was born in Eastbrook and have lived in the district either Eastbrook or Llandough for the rest of my life. As you can imagine I have witnessed tremendous changes with development, it has changed from a lovely village where people wanted to live to an almost gridlocked area where most of the time you are stuck in traffic from Llandough through Eastbrook to Dinas Powys. It has become almost impossible to get a doctors appointment and the future for the one school we have for our children looks more than desperate. I realise people have to live somewhere but Dinas Powys and district looks way past it's sell by date. To accommodate the sort of development that is currently being subjected, that is the plan to build a massive number of houses in the Eastbrook area converging on an already extremely congested road leading to the traffic lights at Llandough. If the reason is money for the council I have lots of ideas where money could be saved.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5111

Derbyniwyd: 04/03/2026

Respondent ID: 2276

Ymatebydd: Mr Stefan Passchier

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am concerned about the development's impact on local services, infrastructure, and the environment. The NHS faces capacity issues, with difficulties securing GP appointments and hospital limits. Do the council intend to increase capacity for health services in the area, for example more GP surgeries, staffed with GPs, nurses and support staff? Schools are already full, and more will be needed. Do the council intend to build and staff more schools for the increase in demand that a new development would result in? Traffic congestion, pollution, and stretched train services will worsen with increased development. The greenbelt and wildlife habitats will be harmed, and flooding risks will rise due to additional building and pressure on water infrastructure. I question whether the council plans to address these issues proactively.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5119

Derbyniwyd: 03/03/2026

Respondent ID: 3132

Ymatebydd: Mr Yu Sing Leung

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I strongly oppose the proposed HG1 KS2 Eastbrook allocation in Dinas Powys, citing concerns about community safety, environmental damage, and inadequate planning. The development would permanently destroy a vital green space and wildlife habitat, conflicting with Welsh and UK legislation including PPW11, TAN 15, and the Wellbeing of Future Generations Act. Issues include traffic congestion, flood risk, lack of ecological evidence, and inadequate infrastructure for new residents. This development undermines policies on green infrastructure, biodiversity, and sustainable transport, and would irreversibly harm the village’s character and wellbeing.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5136

Derbyniwyd: 04/03/2026

Respondent ID: 3139

Ymatebydd: Dr Sara Collins

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The road infrastructure cannot support the proposed level of housing, the result will be more pressure on facilities and poor air quality as traffic queues build throughout the day, particularly around Dinas Powys Primary school.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5137

Derbyniwyd: 04/03/2026

Respondent ID: 1551

Ymatebydd: Mrs Bethany Barnham

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

The scale of development proposed at HG1 KS2 could affect the Welsh language indirectly through demographic change. Large housing developments can attract new residents from outside the local area, which may reduce the proportion of Welsh speakers within the community. Without appropriate planning for Welsh-medium education and community integration, this could reduce opportunities to use Welsh locally. Ensuring that Welsh-medium school provision and community facilities are supported alongside new housing would therefore be important to maintain opportunities for the Welsh language to be used and promoted within the area.

Crynodeb o'r Gynrychiolaeth:

I object to HG1 KS2 as it conflicts with the purpose of the Green Wedge separating Dinas Powys and Llandough and is inconsistently assessed against nearby rejected sites. The village already faces documented surface water flooding, with the Section 19 report confirming drainage failure from land north of the settlement. Traffic congestion on Cardiff Road is severe, public transport is inaccessible and unreliable, and additional housing would increase car dependency. Air quality is monitored locally and further congestion would raise pollution near schools, affecting residents. Schools, healthcare and drainage infrastructure lack demonstrable capacity, making the allocation unsustainable and unjustified.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5138

Derbyniwyd: 04/03/2026

Respondent ID: 3141

Ymatebydd: Mrs Lauren Barnham

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

The proposed scale of development at HG1 KS2 could affect the Welsh language through changes to the local population and community structure. Large housing allocations can introduce significant numbers of residents from outside the area, which may reduce the proportion of Welsh speakers within the community. If population growth occurs without sufficient support for Welsh-medium education, cultural activities and community integration, opportunities to use Welsh in everyday settings may decline. Careful consideration should therefore be given to how new development supports the continued visibility and use of the Welsh language within Dinas Powys and the wider Vale of Glamorgan.

Crynodeb o'r Gynrychiolaeth:

I object to HG1 KS2 as someone with health and mobility issues who already finds transport and access in Dinas Powys difficult. Cardiff Road regularly suffers severe congestion and the village can become gridlocked when incidents occur on Pen-y-Turnpike Road, making it harder to reach medical appointments. Rail stations are not fully accessible and services are unreliable during flooding, while buses have limited wheelchair space. The Section 19 flood report confirms runoff from land north of the village has already overwhelmed drainage systems. Additional development would worsen flooding risk, traffic and pollution, strain schools and healthcare making the proposal unsustainable.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5139

Derbyniwyd: 04/03/2026

Respondent ID: 3142

Ymatebydd: Mrs Charlotte Wise

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The roads, schools, trains, doctors, pharmacy’s, plumbing and drainage will not be able to cope with this number of additional homes. Cardiff road is already a stand still most of the time, trains are too full to use at peak times and the roads are full of pot holes.
Further more, Dinas could risk losing its community village feel which we all love.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5140

Derbyniwyd: 04/03/2026

Respondent ID: 1916

Ymatebydd: Miss maxine hadley

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

Cardiff Road is already heavily congested and widely used as a rat run. Adding around 250 homes would significantly worsen traffic, and the road network does not appear capable of accommodating this safely.
Local GP services are already under considerable strain, with residents often struggling to obtain routine appointments. Additional population growth would place further unsustainable pressure on already overstretched provision.
Schools are at or near capacity. This development would place further unsustainable pressure on both.
Dinas Powys receives less infrastructure investment and maintenance than nearby Barry and Penarth. Existing deficiencies should be addressed before further growth is allocated.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5141

Derbyniwyd: 04/03/2026

Respondent ID: 3143

Ymatebydd: Mrs Caroline Hadley

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

Ks2 - Cardiff Road already suffers heavy congestion and is widely used as a rat run. An additional 250 homes would significantly worsen traffic and road safety.
Local GP surgeries are already overstretched, and local schools are at or near capacity. There is no clear evidence that infrastructure will be expanded in time to support this growth.
Dinas Powys already experiences infrastructure pressures compared with nearby Barry and Penarth. Further large-scale development should not proceed without guaranteed, funded improvements.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5153

Derbyniwyd: 02/03/2026

Respondent ID: 1636

Ymatebydd: Mr Kenneth Lim

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I note that the proposed site has poor access, increasing congestion and flood risk in a vulnerable area. Non-road travel options are limited, putting further pressure on existing transport systems. The single GP surgery will face increased demand, affecting NHS services at Llandough hospital. Additionally, development will reduce green spaces and wildlife, and threaten the village's identity, leading to a loss of its character and community cohesion.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5161

Derbyniwyd: 02/03/2026

Respondent ID: 1634

Ymatebydd: Mrs Karen Lim

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I note that the site has poor access to an already congested road, increasing local traffic and flooding risk. Non-road travel options are limited, adding pressure to existing services. The village's only GP surgery will face greater strain, impacting NHS services at Llandough hospital. Green spaces will be reduced, affecting local wildlife, and the village's identity of Dinas Powys will become increasingly diluted and lost.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5163

Derbyniwyd: 05/03/2026

Respondent ID: 3151

Ymatebydd: Mr Peter Lynch

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

Will over subscribe local Welsh schools. Teachers having classes more than 30 - not good for the children to be overcrowded.

Crynodeb o'r Gynrychiolaeth:

Myself and my wife have medical needs that means being seen by a doctor regularly. To get an appointment is already impossible. More houses mean more people registered at the doctors, which means even less appointments available.
Traffic is horrendous already. More houses means more cars, more traffic congestion.
Increased flooding risk. Putting people’s houses and lives in danger. Not good enough!
NHS/Ambulance services already struggling in the area. 5 hours wait for an ambulance. This will be longer with more houses.
Don’t want to loose village identity after living here for more than 40 years!
No more houses please!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5180

Derbyniwyd: 03/03/2026

Respondent ID: 1920

Ymatebydd: Mr and Mrs Colin Sim

Nifer y bobl: 2

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I would like to raise an objection to this Planning Application on the grounds of increased traffic congestion on the Cardiff Road, loss of greenbelt and wildlife and increase in the risk of flooding in Dinas Powys.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5189

Derbyniwyd: 03/03/2026

Respondent ID: 3159

Ymatebydd: Mr Roger Bishop

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I have lived in Dinas Powys since 1977 and have seen an ever increasing problem with traffic congestion. Currently, traffic is sometimes gridlocked, particularly on Cardiff road. This makes travel within the village and out of the village very difficult and time consuming.
The additional 250 new homes envisaged in this plan would put an intolerable extra burden on the village infrastructure. Schools, GPs, etc are already stretched to the limit, and as stated traffic congestion is unacceptable.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5193

Derbyniwyd: 05/03/2026

Respondent ID: 3160

Ymatebydd: Mrs Wendy Lynch

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

The local Welsh schools will become over sub-scribed. Not great for all the teachers and the children involved as it will put them into over crowded classrooms, effecting their learning.

Crynodeb o'r Gynrychiolaeth:

Doctors are already full to capacity and you cannot get an appointment. Prescriptions also already take a week to process. This will be a lot longer with more houses and more patients.
I moved here over 40 years ago, as I wanted to live in a small village. That is being threatened by your proposal.
The local hospital will struggle as it takes an ambulance 4-5 hours to arrive as it is. More houses will be mean more pressure on them and longer waits - not acceptable!
Local schools are already pushed to their limits with not enough funding.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5199

Derbyniwyd: 04/03/2026

Respondent ID: 1767

Ymatebydd: Mrs Katie Hearn-Cross

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Road transport in this area is already at it's limits. Cardiff Road is mostly a single lane and regularly congested on weekdays and weekends now. Pen-y-turnpike is a dangerous road when busy, which is becoming more common, with accidents becoming more frequent. I regularly witness emergency services blocked along this road, unable to reach their destination in adequate time due to the congestion. This is only going to get worse. Trains are already at their limits. Often near impossible to get on the train in rush hour into Cardiff. Given there are no plans to add additional jobs to the area, assume all these residents will need to commute. Eastbrook is not accessible for those unable to cross the bridge (eg those in wheel chairs, prams etc). What plans are there for these residents?
I cannot see any plans to increase services such as doctors? This service is already at it's limits - there are not enough appointments for the residents as it stands, let alone more.
Flooding is a constant concern in the village. This open space is vital to keeping our housing flood-free. Building on this land brings risk to the existing houses.
Dinas Powys is a village. Residents have chosen to live in a village. This extension will take that identity away

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5216

Derbyniwyd: 05/03/2026

Respondent ID: 3170

Ymatebydd: Mrs Brenda James

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

This development will create in Dinas Powys the following issues:-
Increased congestion by adding another 250 housed to a main artery.
Increased flooding by Paving over the flood plain.
Doctors and schools are already over capacity.
Loss of Green field and hence wild life.
Impact on the travel arteries which are already congested.
Dinas Posis will no longer be isolated from Penarth (Llandough has already been subsumed)
Major loss of Greenbelt

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5217

Derbyniwyd: 05/03/2026

Respondent ID: 3169

Ymatebydd: Mr Michael James

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

minimal

Crynodeb o'r Gynrychiolaeth:

This development will create in Dinas Powys the following issues:-
Doctors and schools are already over capacity.
Loss of Green field and hence wild life.
Increased congestion by adding another 250 housed to a main artery.
Increased flooding by Paving over the flood plain.
Impact on the travel arteries which are already congested.
Dinas Powys will no longer be independant from Penarth (Llandough has already been subsumed)
Major loss of Greenbelt

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5218

Derbyniwyd: 05/03/2026

Respondent ID: 1851

Ymatebydd: Mr Simon James

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

minimal but due to the Proximity of Llandough hospital - I expect negatively by the arrival of the Oversea medical staff.

Crynodeb o'r Gynrychiolaeth:

This development will create in Dinas Powys the following issues:-
Increased flooding by Paving over the flood plain.
Increased congestion by adding another 250 housed to a main artery.
Doctors and schools are already over capacity.
Major loss of Green field and Greenbelt with the inherent loss of wild life.
Impact on the travel arteries which are already congested.
Dinas Powys will no longer be isolated from Penarth, Llandough is already part of Penarth.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5221

Derbyniwyd: 06/03/2026

Respondent ID: 3172

Ymatebydd: Mr Gary Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This cannot be allowed to go ahead without any consideration to the current infrastructure. Traffic through the village already surpasses capacity. Adding more cars in this area will bring the village to a standstill. DP medical centre is also oversubscribed. Getting appointments is difficult at the moment and will be nearly impossible if this goes ahead.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5225

Derbyniwyd: 05/03/2026

Respondent ID: 2209

Ymatebydd: Mrs Katherine Evans

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This area already floods. The run off will cross the road fill the River Cadoxton + overflow onto the railway line, possibly flooding just before the Cogan Tunnel. Houses flood in Dinas Powys + this means raw sewage running into the sea. All this water has to go through the pipe under the main road at sunny croft where it can flood to houses. Increased congestion slowly traveling along the road will an effect on residents health which will suffer. The medical centre + schools are stretched already. The hospitals + emergency services struggle to manage at times. Access at Eastbrook railway station could be dangerous with people crossing the road before the crossing. The road itself is at capacity. The Green Space between Dinas Powys and Llandough is important to the village, helping keeping its identity-it is also important wildlife connector. The new extension to Llandough Hospital has already increased the amount of water flowing down the hill to the proposed building area

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5227

Derbyniwyd: 03/03/2026

Respondent ID: 1893

Ymatebydd: Mrs Linda Hobbis

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Is this a serious question?! You are probably talking about 1000 people max. Unless they hold a private Eisteddfod I can't see it will make one iota of difference.

Crynodeb o'r Gynrychiolaeth:

I oppose further development in Dinas Powys due to severe traffic congestion caused by the 20mph speed limit, poor road conditions, frequent flooding, and inadequate flood defenses. Local services such as schools and medical centres are overwhelmed, with long wait times and limited capacity. Construction would increase traffic and strain infrastructure further, while environmental impact would be negative. I believe development should focus on brownfield sites on the outskirts of the village. Given high council tax and poor service, I strongly object to this proposal.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5229

Derbyniwyd: 05/03/2026

Respondent ID: 3177

Ymatebydd: Miss Carelyn Boughton

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

It depends on the ethnicity of the people who will purchase these houses. Some may come and want to enrol their children in Welsh speaking educational facilities which is wonderful. Others will come because of their jobs and some just want to move of the city If you don't have a mic of Welsh speakers then the Welsh language will eventually die. I think it is classed as endangered already.

Crynodeb o'r Gynrychiolaeth:

Before I begin my objection I would like to state that I am not a NIMBY. I recognise the need for housing especially as the UK population has increased dramatically over the years. However, without the infrastructure being put in place then all that happens is the standard of living is reduced for residents. I live in Georges Row which is usually congested due to the residents on Cardiff Road having to park in the street. George's Row is proposed as an access for all vehicles. This spills out onto Cardiff Road, which will lead to more congestion. I am worried about the water run off into the Cadaxton river the extra houses being built. This winter has had an exceptionally high rainfall and with climate change extreme weather will be the norm. Where is the infrastructure to accommodate these extra houses? Dinas Powys has one health centre, one primary school, one church primary school and two high schools in Penarth, which I am led to believe, are oversubscribed. Finally you as a council, have you got evidence that these houses will enhance Dinas Powys? If you can see that there will be more traffic congestion, probably more flooding of houses, an infrastructure that is creaking, how can you justify this proposal?

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5230

Derbyniwyd: 05/03/2026

Respondent ID: 3107

Ymatebydd: Mr Paul Mason

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The proposed development will significantly add to traffic congestion and air pollution. Long tailbacks from the Merry Harrier's junction are a daily occurrence and any additional roads joining the junction directly or indirectly will inevitably increase the congestion. In addition, the volume of traffic entering Dinas Powys from recent Barry developments has been considerable.
Consideration must also be given to pedestrians who also have to safely navigate any new road layout.
The development will put further pressure on the local infrastructure, in particular medical care which is already functioning at capacity.
There is an increased risk of flooding in low lying areas as drainage improves from the run-off of the new houses.
This is a green-field development which will reduce the boundary between Dinas Powys and Llandough and will no doubt set a precedent for similar development applications in future.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5231

Derbyniwyd: 01/03/2026

Respondent ID: 1106

Ymatebydd: Mr Ian Symonds

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Both our objections relate to 7. Key Site Supporting Information, Green Infrastructure Strategy, October 2024, Version 2 prepared by tir collective, landscape architects, on behalf of Persimmon Homes.

OBJECTION 1
The document refers to two area of woodland adjacent to but outside the boundary of the proposed development:

1. Restored ancient woodland to the NW of the site, this woodland is owned by us in its entirety.
2. Ancient Semi Natural Woodland to the SW of the site. We own the western part, being the original woodland, representing about 40% of the total area, the balance being the more recently planted part forming part of Seel Park.

The document refers to enhancing the planting and carrying out alterations to enable access to the woodlands by residents of the development and others as an amenity use.

We object to land outside the boundary of the development and not in the ownership or control of the developer being put forward for amenity use. There have been no discussions with us about this and we would have made our views quite clear. There can be no amenity use for these woods and there cannot be any public access. Both woodlands are worked by us for selective timber extraction. Both have been affected by ash die-back and there is a risk of falling branches and/or trees. Woodland 1 is open to the fields on both sides and our cattle use it for shade and cooling during hot weather. Cattle in woods and public, possibly with dogs, do not mix.

The proposals affecting land in our ownership have been put forward without our approval or knowledge and we cannot agree to them.

OBJECTION 2
The Green Infrastructure document shows in the Framework Masterplan in the field that it calls 'Central Valley' a yellow-coloured footpath, possibly incorporating a cycle path also, running the length of the field and terminating on the western boundary with an arrow pointing into our farmyard. The implication of the arrow being that access will be made into our farmyard at this point.

We cannot allow access into our farmyard. It is private property, there is no right of way. It is a working farmyard with penned and free-roaming livestock and heavy machinery and tractors being used. There would be massive safety and security issues with this and it is unfortunate that this was not discussed with us beforehand.

Once our tenancy is terminated it will be our intention to close that access point, close off the gateway, erect new fencing and plant new hedging plants so that there can be no access from the field termed 'Central Valley' into our farmyard.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5232

Derbyniwyd: 01/03/2026

Respondent ID: 3181

Ymatebydd: Carole Sian Robertson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Both our objections relate to 7. Key Site Supporting Information, Green Infrastructure Strategy, October 2024, Version 2 prepared by tir collective, landscape architects, on behalf of Persimmon Homes.

OBJECTION 1
The document refers to two area of woodland adjacent to but outside the boundary of the proposed development:

1. Restored ancient woodland to the NW of the site, this woodland is owned by us in its entirety.
2. Ancient Semi Natural Woodland to the SW of the site. We own the western part, being the original woodland, representing about 40% of the total area, the balance being the more recently planted part forming part of Seel Park.

The document refers to enhancing the planting and carrying out alterations to enable access to the woodlands by residents of the development and others as an amenity use.

We object to land outside the boundary of the development and not in the ownership or control of the developer being put forward for amenity use. There have been no discussions with us about this and we would have made our views quite clear. There can be no amenity use for these woods and there cannot be any public access. Both woodlands are worked by us for selective timber extraction. Both have been affected by ash die-back and there is a risk of falling branches and/or trees. Woodland 1 is open to the fields on both sides and our cattle use it for shade and cooling during hot weather. Cattle in woods and public, possibly with dogs, do not mix.

The proposals affecting land in our ownership have been put forward without our approval or knowledge and we cannot agree to them.

OBJECTION 2
The Green Infrastructure document shows in the Framework Masterplan in the field that it calls 'Central Valley' a yellow-coloured footpath, possibly incorporating a cycle path also, running the length of the field and terminating on the western boundary with an arrow pointing into our farmyard. The implication of the arrow being that access will be made into our farmyard at this point.

We cannot allow access into our farmyard. It is private property, there is no right of way. It is a working farmyard with penned and free-roaming livestock and heavy machinery and tractors being used. There would be massive safety and security issues with this and it is unfortunate that this was not discussed with us beforehand.

Once our tenancy is terminated it will be our intention to close that access point, close off the gateway, erect new fencing and plant new hedging plants so that there can be no access from the field termed 'Central Valley' into our farmyard.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5233

Derbyniwyd: 03/03/2026

Respondent ID: 3180

Ymatebydd: Dr Mohammed Mirza

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the allocation of 250 dwellings at Cardiff Road, Dinas Powys, due to incomplete and outdated evidence on transport, air quality, flood risk, healthcare capacity, and sustainable travel. The plan lacks detailed modelling, enforceable mitigation measures, and funding details, risking increased congestion and poor health outcomes. The flood risk evidence is obsolete, neglecting recent major floods. Without updated assessments, deliverable mitigation, and infrastructure plans, the development cannot be considered safe or sustainable, and the plan fails to meet statutory soundness tests.

Atodiadau: