Dear Council
Please note the comments on Dinas Powys Chat 0.7.02.2026 post Murchfield drop in session 06.02.2026
My concerns have been expressed equally by residents who are well informed re, - flooding, infrastructure, road pollution and chaos, increase and pressure on schools and medical facilities, environment, loss of village status, wildlife!!! There are so many issues to address! As a resident of Dinas Powys for well over 70 years, I have experienced vast changes. Some very welcome. I appreciate the need for affordable homes but this site is not 100% suitable.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4723
Derbyniwyd: 17/02/2026
Respondent ID: 2298
Ymatebydd: Mr Luke Bellamy
Cadarn? Heb nodi
Thousands of homes downstream in Barry. *One single track A road from Barry to Cardiff with already constant gridlock in Dinas powys. * Road that floods regularly and is in a shocking state. *Emissions already over legal limits So...... You propose to build 250 house on land that currently soaks up water and put the entrance right on a traffic pinch point. But.... *Land owned by persimmon so will already be on council balance sheet. Therefore look forward to the whitewash. * Flood report *Traffic assesment (prob run at 2am on Sunday) *Environmental report. *Fantasy sustainable travel predictions
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4733
Derbyniwyd: 19/02/2026
Respondent ID: 2090
Ymatebydd: Mrs Belinda Morgan
Cadarn? Heb nodi
The infrastructure coming into Dinas Powys is not adequate, the potholes due to all the traffic are getting bigger being just “tidied up” instead of complete resurface.
Gliding is getting worse, this land has the river Eastbrook running through it, where will it go?
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4734
Derbyniwyd: 19/02/2026
Respondent ID: 2905
Ymatebydd: Mrs Emily Kinch
Cadarn? Heb nodi
This development is going to have an adverse effect on our village, add additional traffic to an all ready highly consgested road and add more pressure on our schools and doctors.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4735
Derbyniwyd: 19/02/2026
Respondent ID: 2906
Ymatebydd: Mrs Francesca Bell
Cadarn? Heb nodi
I am concerned about the proposed housing on Land north of Dinas Powys due to limited access routes and existing congestion. More homes could exacerbate traffic and flood risks, as increased impermeable surfaces might worsen runoff without proper drainage. Healthcare services are already stretched, and additional residents would increase pressure on GPs. The village has recently expanded with three estates, and this development would significantly alter its character and strain local infrastructure.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4736
Derbyniwyd: 19/02/2026
Respondent ID: 2906
Ymatebydd: Mrs Francesca Bell
Cadarn? Heb nodi
I’m very concerned about the proposed housing on Land north of Dinas Powys. There are limited routes in and out of Dinas, which already get heavily congested, and more homes will worsen traffic. Although train and bus services exist, many journeys still rely on cars, adding further pressure. Flooding in Dinas has been increasing, and more impermeable surfaces could worsen runoff unless drainage is properly addressed. GP services are already stretched, and additional residents will put further pressure on healthcare. Dinas Powys has grown with three recent estates, and this development would significantly change village character and infrastructure.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4737
Derbyniwyd: 19/02/2026
Respondent ID: 1967
Ymatebydd: Mr Glen Monteiro
Cadarn? Heb nodi
Infrastructure in Dp is already beyond breaking point. Gridlock on roads for most of working day not just rush hr. Roads in ooor repair. Schools full. Dr surgery too small already with Penarth practice closed and patients aligned to Dp. Water drainage with fields to be lost to housing a recipe for future flooding
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4748
Derbyniwyd: 19/02/2026
Respondent ID: 2012
Ymatebydd: Mrs Cathie Jackson
Cadarn? Nac Ydi
None
I oppose developing land north of Dinas Powys due to flooding risks, as it would increase water runoff and threaten downstream areas. The proposal would destroy wildlife habitats, mature trees, and compromise the green infrastructure valued for recreation and biodiversity. It conflicts with the Green Infrastructure Strategy and risks eroding Dinas Powys’s village identity by reducing the green wedge separating it from Llandough. The development would worsen traffic congestion, strain local infrastructure including GP services, schools, and secondary schools, and undermine community well-being. I call on the council and Welsh Government to reject this site and focus on brown
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4749
Derbyniwyd: 19/02/2026
Respondent ID: 1654
Ymatebydd: Miss Delyth Vaughan
Cadarn? Nac Ydi
I object to allocating land for approximately 250 homes in Dinas Powys, citing concerns over flood risk, drainage, infrastructure capacity, education, highway safety, environmental harm, and policy compliance. The existing drainage system is under strain, risking increased flooding. Local schools are at capacity, and additional residents would worsen congestion and safety. Loss of green space and wildlife habitat would harm biodiversity and village character. The scale of development exceeds infrastructure capacity, contradicting national policies and principles of sustainable development. I urge removal or reduction of this allocation before submission.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4750
Derbyniwyd: 20/02/2026
Respondent ID: 2913
Ymatebydd: Mrs Kim Mills
Cadarn? Heb nodi
The water run off will be lost if houses built here, as well as the destruction to the natural environment/ ecology. The main road/artery is already blocked daily with traffic not allowing a flowing thoroughfare. This congestion alone is bad for air pollution and this would be added too with the consent of this build.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4751
Derbyniwyd: 20/02/2026
Respondent ID: 2914
Ymatebydd: Mrs Ruth Clogg
Cadarn? Heb nodi
Our village ( turning into a town ) can not cope with these extra houses, the roads now are congested god only knows how it will cope with these extra cars the floods that we experience now this will only make matters worse, we are losing our picturesque village.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4752
Derbyniwyd: 20/02/2026
Respondent ID: 2915
Ymatebydd: Mr Elgan Evans
Cadarn? Heb nodi
As a resident of Dinas Powys living 800m from the proposed site, I strongly object to this development. The village lacks the infrastructure to support 250 additional homes. The scheme relies on an already congested road network that has operated at or beyond capacity for years with little/no active travel links nearby. Local schools and NHS services are overstretched, and parking at Eastbrook Station is routinely full. Development here would increase flood risk, potentially affecting nearby properties, and cause unacceptable ecological harm. It would erode Green Belt land and fundamentally alter the character and identity of the village.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4753
Derbyniwyd: 20/02/2026
Respondent ID: 2917
Ymatebydd: Mrs Rhian Evans
Cadarn? Heb nodi
As a resident of Dinas Powys living 800m from the proposed site, I strongly object to this development. The village lacks the infrastructure to support 250 additional homes. The scheme relies on an already congested road network that has operated at or beyond capacity for years with little/no active travel links. Local schools and NHS services are overstretched, and parking at Eastbrook Station is routinely full. Development here would increase flood risk, potentially affecting nearby properties, and cause unacceptable ecological harm. It would erode Green Belt land and fundamentally alter the character and identity of the village.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4754
Derbyniwyd: 20/02/2026
Respondent ID: 2352
Ymatebydd: Mrs Shelley Williams
Cadarn? Heb nodi
I thInk everyone understands the need for housing BUT flooding issues, services, infrastructure nees to be thoroughly addressed FIRST!
DOCTORS, TRAFFIC, SCHOOLS!! All are under pressure and over stretched!!
I can't see how this will work.
This land is very low lying, subject to flooding.
MAYBE YOU WILL NEED HOUSES ON STILTS???
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4755
Derbyniwyd: 20/02/2026
Respondent ID: 2947
Ymatebydd: Mr John Clogg
Cadarn? Heb nodi
I have lived in Dinas Powys for over 60 years. We already don’t have the infrastructure and amenities to accommodate the existing residents. The additional 250 houses will add more strain on traffic, schools, GP, flooding, etc and have a negative impact on our village community.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4756
Derbyniwyd: 14/02/2026
Respondent ID: 2918
Ymatebydd: Mr Michael Wilson
Cadarn? Heb nodi
I have the following concerns over this development:
Increased traffic problems, especially at rush hours, on a busy road which has been proposed for a bypass back in the 1970s.
Exit entrance to site from a road with a bus lane, cycle lane and close proximity to traffic lights.
Extra air pollution close to residential areas and a primary school from extra traffic.
Increased pressure on over stretched schools, health centre and other community facilities.
Likely problems with sewage and groundwater in an area prone to flooding already.
Increase in traffic (250 houses=400 vehicles) will push more road users to use " rat runs " like Penyturn Pike, Longmeadow and the Westra.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4758
Derbyniwyd: 20/02/2026
Respondent ID: 2920
Ymatebydd: Justine Pang
Cadarn? Heb nodi
The traffic will be horrendous on Cardiff road as well as the local services being overrun!
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4759
Derbyniwyd: 20/02/2026
Respondent ID: 2921
Ymatebydd: Mr Lewis Cook
Cadarn? Heb nodi
The local area is already struggling with traffic, road repairs, waiting lists, infrastructure, flooding. I strongly oppose any further housing before providing at least new roads to reduce risk of inconvenience or injury.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4760
Derbyniwyd: 20/02/2026
Respondent ID: 2027
Ymatebydd: Miss Samantha James
Cadarn? Heb nodi
OBJECT - The roads are not adequate for the currents amount of housing currently. Traffic is making it unpossible to leave the village for the current owners.
This is a concern for the schools on the main road. Car fumes getting breathed in by our children whilst there within school grounds. We already struggle to get doctor appointments already so how can they services be stretched for another 100 houses never alone more.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4761
Derbyniwyd: 20/02/2026
Respondent ID: 2922
Ymatebydd: Mrs Sophie Williams
Cadarn? Heb nodi
I oppose development on the land North of Dinas Powys because it would significantly harm the village. Traffic is already severe, and additional housing would worsen congestion, increase pollution, and strain local roads. The development would also put pressure on schools, healthcare, and other services, reducing quality of life. Furthermore, it would lead to the loss of valuable green space and the village’s character, which residents deeply value.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4762
Derbyniwyd: 20/02/2026
Respondent ID: 2924
Ymatebydd: Mr Jack Donnelly
Cadarn? Heb nodi
I believe the proposed plans will harm local wildlife, reduce residents' quality of life, and strain existing healthcare and services. Flooding risks will rise due to land concreting, and noise, light, and air quality will negatively affect woodland and farms. The dangerous Pen-y-Turnpike will see increased traffic and accidents, endangering both drivers and wildlife. Residents' concerns are ignored, and the village cannot support more residents without damaging its character, green spaces, and living standards for future generations.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4763
Derbyniwyd: 20/02/2026
Respondent ID: 2927
Ymatebydd: Mrs Shirley Richardson
Cadarn? Heb nodi
Very concerned about the poor road surfaces in Dinas Powys, lack ok parking and enforcement for illegal/dangerous parking. Highly congested driving routes, no safe cycle and walking lanes as alternatives to Barry and no by-pass. Amenities not in place to support additional housing. Decline in air quality, recreation grounds and well-being of current residents disregarded. Most likely increase flood risk due to lack of vegetation. I moved from Cardiff to Dinas in order to escape the traffic and enjoy village life. Urgent improvements in Dinas must be completed first before any additional housing can be integrated successfully.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4764
Derbyniwyd: 21/02/2026
Respondent ID: 2928
Ymatebydd: Mrs Hannah Williams
Cadarn? Heb nodi
The infrastructure we have in Dinas Powys is already under strain. Adding an extra 250 houses and cars will cause chaos in an area that is already struggling.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4765
Derbyniwyd: 21/02/2026
Respondent ID: 2930
Ymatebydd: Ms Nicola Meredith
Cadarn? Heb nodi
Too many cars already for Cardiff Road to cope with. Adding more cars would be a disaster, impacting on the quality of life of residents and commuters.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4766
Derbyniwyd: 21/02/2026
Respondent ID: 2103
Ymatebydd: Miss Lauren Knight
Cadarn? Heb nodi
Lack of infrastructure in surrounding areas. Cardiff road already at capacity for most parts of the day. No access to site via pen-y-turnpike which would alleviate road pressures.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4767
Derbyniwyd: 21/02/2026
Respondent ID: 1808
Ymatebydd: Mr Ian Christopher
Cadarn? Heb nodi
The road, schools, health and other services are not sufficient to support the scale of this development.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4768
Derbyniwyd: 21/02/2026
Respondent ID: 2932
Ymatebydd: Miss Rachel Brown
Cadarn? Heb nodi
Traffic, flood risks and accessing timely health care at the GP are already tedious in Dinas Powys. Adding this many houses will mean more cars (more traffic, more potholes which are already a big issue, more polution).
Losing so much green space will also impact the ability for Dinas to manage water. We need green space to help reduce the risk of flooding - not more concrete.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4769
Derbyniwyd: 21/02/2026
Respondent ID: 2931
Ymatebydd: Mrs Carla Bluett
Cadarn? Heb nodi
I do not care about the promotion of the Welsh language, with all the other problems our communities have I think Welsh language is of little importance.
Whilst I understand the need for additional housing, this development reduces the green belt which is detrimental to Dinas Powys’ identity as a community and to the wildlife on the site. There is not enough road capacity - we need a bypass around Dinas to divert Barry traffic which has also seen a massive rise in population with developments there. Doctors already at capacity and I struggle to get an appointment as it is, this will be made worse. Schools need additional investment - not just Welsh speaking!! I also worry about flooding.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4770
Derbyniwyd: 21/02/2026
Respondent ID: 1788
Ymatebydd: Mrs Amy Murphy
Cadarn? Heb nodi
The Dinas Powys area is already overly populated, added housing will put a strain on schools, doctors, dentists, the environment (extra cars on the road) and traffic will be considerably increased in an area that is already very congested.
Also the land is home to wildlife, what happens to the creatures we share the land with?
I feel this is a bad choice also due to the rivers in Dinas. Rain water runs off the area into brooks and the river which regularly floods.
Please do not use this land for more houses.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4774
Derbyniwyd: 22/02/2026
Respondent ID: 2935
Ymatebydd: Mr Nicholas Stork
Cadarn? Heb nodi
I feel it will further damage they language and place pressure on the limited education resources in the area
As a resident in Dinas Powys for 9 years plus, I seen the impact on the community from the continued building in the Vale of Glamorgan. Both the Cardiff Rd and Penyturnpike Lane are heavily congested at the best of times and gridlocked if impact by roadworks or an accident.
Drainage and flooding is an increasing issue and I’m not sure how the local infrastructure could tolerate a scheme of this size.
All local schools are heavily subscribed and again there is the infrastructure or space to provide more.