HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 31 i 60 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4717

Derbyniwyd: 16/02/2026

Respondent ID: 1644

Ymatebydd: Mrs Teresa Britton

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Dear Council
Please note the comments on Dinas Powys Chat 0.7.02.2026 post Murchfield drop in session 06.02.2026
My concerns have been expressed equally by residents who are well informed re, - flooding, infrastructure, road pollution and chaos, increase and pressure on schools and medical facilities, environment, loss of village status, wildlife!!! There are so many issues to address! As a resident of Dinas Powys for well over 70 years, I have experienced vast changes. Some very welcome. I appreciate the need for affordable homes but this site is not 100% suitable.

Testun llawn:

Dear Council
Please note the comments on Dinas Powys Chat 0.7.02.2026 post Murchfield drop in session 06.02.2026
My concerns have been expressed equally by residents who are well informed re, - flooding, infrastructure, road pollution and chaos, increase and pressure on schools and medical facilities, environment, loss of village status, wildlife!!! There are so many issues to address! As a resident of Dinas Powys for well over 70 years, I have experienced vast changes. Some very welcome. I appreciate the need for affordable homes but this site is not 100% suitable.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4723

Derbyniwyd: 17/02/2026

Respondent ID: 2298

Ymatebydd: Mr Luke Bellamy

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Thousands of homes downstream in Barry. *One single track A road from Barry to Cardiff with already constant gridlock in Dinas powys. * Road that floods regularly and is in a shocking state. *Emissions already over legal limits So...... You propose to build 250 house on land that currently soaks up water and put the entrance right on a traffic pinch point. But.... *Land owned by persimmon so will already be on council balance sheet. Therefore look forward to the whitewash. * Flood report *Traffic assesment (prob run at 2am on Sunday) *Environmental report. *Fantasy sustainable travel predictions

Testun llawn:

Thousands of homes downstream in Barry. *One single track A road from Barry to Cardiff with already constant gridlock in Dinas powys. * Road that floods regularly and is in a shocking state. *Emissions already over legal limits So...... You propose to build 250 house on land that currently soaks up water and put the entrance right on a traffic pinch point. But.... *Land owned by persimmon so will already be on council balance sheet. Therefore look forward to the whitewash. * Flood report *Traffic assesment (prob run at 2am on Sunday) *Environmental report. *Fantasy sustainable travel predictions

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4733

Derbyniwyd: 19/02/2026

Respondent ID: 2090

Ymatebydd: Mrs Belinda Morgan

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The infrastructure coming into Dinas Powys is not adequate, the potholes due to all the traffic are getting bigger being just “tidied up” instead of complete resurface.
Gliding is getting worse, this land has the river Eastbrook running through it, where will it go?

Testun llawn:

The infrastructure coming into Dinas Powys is not adequate, the potholes due to all the traffic are getting bigger being just “tidied up” instead of complete resurface.
Gliding is getting worse, this land has the river Eastbrook running through it, where will it go?

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4734

Derbyniwyd: 19/02/2026

Respondent ID: 2905

Ymatebydd: Mrs Emily Kinch

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This development is going to have an adverse effect on our village, add additional traffic to an all ready highly consgested road and add more pressure on our schools and doctors.

Testun llawn:

This development is going to have an adverse effect on our village, add additional traffic to an all ready highly consgested road and add more pressure on our schools and doctors.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4735

Derbyniwyd: 19/02/2026

Respondent ID: 2906

Ymatebydd: Mrs Francesca Bell

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am concerned about the proposed housing on Land north of Dinas Powys due to limited access routes and existing congestion. More homes could exacerbate traffic and flood risks, as increased impermeable surfaces might worsen runoff without proper drainage. Healthcare services are already stretched, and additional residents would increase pressure on GPs. The village has recently expanded with three estates, and this development would significantly alter its character and strain local infrastructure.

Testun llawn:

I’m very concerned about the proposed housing on Land north of Dinas Powys. There are limited routes in and out of Dinas, which already get heavily congested, and more homes will make traffic worse. Although there are train and bus services, many journeys still rely on cars, which would add further pressure to the roads. Flooding in Dinas has been increasing, and adding more impermeable surfaces could worsen runoff unless drainage is properly addressed. GP services are already stretched, and additional residents will put further pressure on healthcare. Dinas Powys has grown with three recent estates, and this development would significantly change the village character and local infrastructure.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4736

Derbyniwyd: 19/02/2026

Respondent ID: 2906

Ymatebydd: Mrs Francesca Bell

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I’m very concerned about the proposed housing on Land north of Dinas Powys. There are limited routes in and out of Dinas, which already get heavily congested, and more homes will worsen traffic. Although train and bus services exist, many journeys still rely on cars, adding further pressure. Flooding in Dinas has been increasing, and more impermeable surfaces could worsen runoff unless drainage is properly addressed. GP services are already stretched, and additional residents will put further pressure on healthcare. Dinas Powys has grown with three recent estates, and this development would significantly change village character and infrastructure.

Testun llawn:

I’m very concerned about the proposed housing on Land north of Dinas Powys. There are limited routes in and out of Dinas, which already get heavily congested, and more homes will worsen traffic. Although train and bus services exist, many journeys still rely on cars, adding further pressure. Flooding in Dinas has been increasing, and more impermeable surfaces could worsen runoff unless drainage is properly addressed. GP services are already stretched, and additional residents will put further pressure on healthcare. Dinas Powys has grown with three recent estates, and this development would significantly change village character and infrastructure.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4737

Derbyniwyd: 19/02/2026

Respondent ID: 1967

Ymatebydd: Mr Glen Monteiro

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Infrastructure in Dp is already beyond breaking point. Gridlock on roads for most of working day not just rush hr. Roads in ooor repair. Schools full. Dr surgery too small already with Penarth practice closed and patients aligned to Dp. Water drainage with fields to be lost to housing a recipe for future flooding

Testun llawn:

Infrastructure in Dp is already beyond breaking point. Gridlock on roads for most of working day not just rush hr. Roads in ooor repair. Schools full. Dr surgery too small already with Penarth practice closed and patients aligned to Dp. Water drainage with fields to be lost to housing a recipe for future flooding

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4748

Derbyniwyd: 19/02/2026

Respondent ID: 2012

Ymatebydd: Mrs Cathie Jackson

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

I oppose developing land north of Dinas Powys due to flooding risks, as it would increase water runoff and threaten downstream areas. The proposal would destroy wildlife habitats, mature trees, and compromise the green infrastructure valued for recreation and biodiversity. It conflicts with the Green Infrastructure Strategy and risks eroding Dinas Powys’s village identity by reducing the green wedge separating it from Llandough. The development would worsen traffic congestion, strain local infrastructure including GP services, schools, and secondary schools, and undermine community well-being. I call on the council and Welsh Government to reject this site and focus on brown

Newid wedi’i awgrymu gan ymatebydd:

Ideally I would like the council to withdraw this site from the LDP and instead consider how it might be used to further the implementation of its Tree Strategy and Green Infrastructure plan.

Testun llawn:

I oppose the development of land to the north of Dinas Powys for the following reasons:
Flooding: Dinas Powys is already at risk of flooding and many houses were flooded in December 2020. Developing the land north of Dinas Powys will result in further run-off of water into the Eastbrook river, which can only exacerbate the risk of flooding downstream. I am also concerned that the development, increasing the flooding risk, will then encourage NRW to return to the proposed storage reservoir mooted a few years ago for the Mill Fields – a proposal to which the whole village and those beyond were adamantly opposed.
Loss of wildlife and trees: The development would destroy key areas of countryside with loss of habitat for wildlife. I live adjacent to the land north of Dinas Powys and frequently see bats and hear owls. The Vale of Glamorgan Tree Strategy 2024-2039 discusses the need for tree canopy and the development would be contrary to the principles in the Tree Strategy. There are mature trees throughout the area. Of most knowledge to me is the mature field border behind Georges Row, which is on the edge the proposed development. This border is lined with oak trees, which sustain nesting birds and much other wildlife. There is a particularly huge oak tree neighbouring 40 Georges Row. If this tree is to remain, the area nearby must be left undisturbed so as to protect its roots. Equally its extensive branches could be of danger to any houses built underneath it. It is not easy to understand how this site can be said to have biodiversity benefits when it will be so detrimental to the environment and wildlife.
The development appears to be in direct contradiction to the Green Infrastructure Strategy. The trees and fields on the site of the proposed development are used to enhance wellbeing and good health, as popular areas for dog walking , rambling and enjoying the countryside. There is biodiversity and a range of habitats for birds and mammals on the area due for development, and the fields help create a sense of space as a border to the urban environment of Dinas Powys. Building on these fields will reduce the green infrastructure in these ways, result in biodiversity losses rather than gains and exacerbate the local effects of climate change through missing the chance to use the environment there to reduce the risks of flooding downstream.
Village identity: The proposed reduction in the green wedge between Dinas Powys and Llandough with the proposed development to the north of Dinas Powys will have a significant impact on the perception of Dinas Powys as a distinct village. The doubling in size of Llandough hospital has already reduced the separation of the village. Dinas Powys will lose its wonderful village identity, with the risk that the eastern Vale will be viewed as a single urban settlement of Cardiff/Penarth/Llandough/Dinas Powys. A green wedge needs to be more than just a field or two to properly separate our villages and towns.
Traffic congestion: Cardiff Road in Dinas Powys is already notoriously congested and the stretch by the bus lane is almost always queuing, due to the bottleneck of the junction with Redlands Road. The development north of Dinas Powys will create a key junction onto this busy section of road. Any traffic management system, such as traffic lights, will create further congestion through Dinas Powys travelling northward, and exacerbate the occurrences of southbound traffic backing up to the Redlands Road junction.
Infrastructure: The local GP services are at capacity. The local primary schools in Dinas Powys are oversubscribed. St Cyres secondary school was rebuilt with a lower capacity than previously available and is also full. It is difficult to understand how the village can absorb these new homes without detriment to all its residents.
I urge the council and Welsh Government to reject this site from the RLDP and reprioritise brown field sites where you are not destroying nature and local communities.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4749

Derbyniwyd: 19/02/2026

Respondent ID: 1654

Ymatebydd: Miss Delyth Vaughan

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to allocating land for approximately 250 homes in Dinas Powys, citing concerns over flood risk, drainage, infrastructure capacity, education, highway safety, environmental harm, and policy compliance. The existing drainage system is under strain, risking increased flooding. Local schools are at capacity, and additional residents would worsen congestion and safety. Loss of green space and wildlife habitat would harm biodiversity and village character. The scale of development exceeds infrastructure capacity, contradicting national policies and principles of sustainable development. I urge removal or reduction of this allocation before submission.

Newid wedi’i awgrymu gan ymatebydd:

I respectfully request that this allocation be removed or substantially reduced prior to submission for independent examination.

Testun llawn:

I write to formally object to the proposed allocation of land for approximately 250 residential dwellings in Dinas Powys, as set out in the Vale of Glamorgan Local Development Plan 2021–2036 Deposit Plan.
My objection is founded on substantial concerns relating to flood risk, drainage and infrastructure capacity, education provision, highway safety and congestion, environmental harm, and non-compliance with national and local planning policy.
1. Flood Risk and Drainage Capacity
The proposed allocation raises serious and well-founded concerns regarding flood risk and surface water management. Parts of Dinas Powys have a documented history of surface water flooding and drainage exceedance during periods of heavy rainfall, demonstrating that existing drainage infrastructure is already under significant strain.
I have direct personal experience of these problems. My property was recently flooded due to a burst water main, causing damage and prolonged disruption. The issue remains unresolved, and I am still awaiting remedial works, including the replacement of my lawn and boundary fencing by Welsh Water. This has caused considerable distress, inconvenience, and ongoing uncertainty, highlighting the fragility of the existing drainage and water infrastructure.
The scale of development proposed would significantly increase impermeable surfaces, thereby intensifying surface water run-off and materially elevating flood risk both within the site and to surrounding residential areas downstream. The Deposit Plan fails to demonstrate that adequate, deliverable, and fully funded drainage and flood mitigation infrastructure can be secured to address these impacts.
This approach is contrary to the requirements of Planning Policy Wales (PPW) and TAN 15: Development, Flooding and Coastal Erosion, which require development to be directed away from areas of flood risk and to ensure that flood consequences are not increased elsewhere.
2. Education Capacity – Unsustainable Impact on Local Schools
Primary and secondary schools serving Dinas Powys are already operating at or near full capacity. The addition of approximately 250 dwellings would generate a substantial increase in pupil numbers, which existing education facilities are neither designed nor resourced to accommodate.
The Deposit Plan fails to demonstrate that sufficient school places can be delivered in a timely manner, or that appropriate land, funding, and delivery mechanisms are secured to facilitate necessary expansions. In the absence of guaranteed educational infrastructure provision, the proposal risks causing significant detriment to educational standards, accessibility, and community wellbeing, contrary to the principles of sustainable development.
3. Highway Capacity, Traffic Congestion and Safety
The local highway network within and surrounding Dinas Powys already experiences chronic congestion, particularly during peak commuting and school travel periods. Key routes routinely operate at or beyond practical capacity, resulting in frequent queuing, delays, and reduced highway safety.
As a local school employee, I do not feel safe walking to work due to traffic conditions and pedestrian safety concerns. Instead, I am compelled to travel by car, despite the short distance of just over one mile. Even this short journey routinely takes approximately 15 minutes, and significantly longer when delayed by service or refuse collection vehicles. This illustrates the severe existing pressure on the local road network.
The additional vehicular movements generated by 250 new dwellings would materially worsen congestion, air pollution, and highway safety risks. Particular concern arises regarding pedestrian and cyclist safety, especially for school children.
The Deposit Plan fails to demonstrate how these cumulative transport impacts would be acceptably mitigated or how sustainable transport measures would realistically offset increased reliance on private vehicles.
4. Loss of Green Space, Biodiversity and Wildlife Habitat
The proposed allocation would result in the irreversible loss of valuable greenfield land and wildlife habitat, which currently supports local biodiversity, ecological networks, and protected species.
These green spaces deliver essential ecosystem services, provide opportunities for recreation, and contribute significantly to the physical and mental wellbeing of residents. Their loss would fundamentally undermine the rural character, environmental quality, and liveability of Dinas Powys.
The Deposit Plan does not demonstrate adequate ecological mitigation, compensation, or biodiversity net gain, contrary to the requirements of PPW, TAN 5: Nature Conservation and Planning, and the Environment (Wales) Act 2016.
5. Overdevelopment and Harm to Settlement Character
The scale of development proposed is disproportionate to the size, character, and infrastructure capacity of Dinas Powys. An additional 250 dwellings represent a substantial and unsustainable expansion that would erode the village’s distinct identity and semi-rural setting.
Such growth constitutes overdevelopment, conflicting with sound placemaking principles and settlement hierarchy policies, and risks transforming Dinas Powys into a suburban extension of Cardiff, rather than maintaining it as a sustainable and cohesive village community.
6. Failure to Demonstrate Soundness
For the reasons outlined above, the proposed allocation fails to meet the statutory tests of soundness, in particular:
• Test CE1 – The plan is not deliverable, due to unresolved and unfunded infrastructure constraints.


• Test CE2 – The plan is not flexible, as it relies on uncertain future infrastructure provision.


• Test C2 – The plan is not consistent with national planning policy.
The proposed allocation of 250 dwellings in Dinas Powys within the Deposit Plan is unsound, unsustainable, and likely to result in significant environmental, social, and infrastructural harm. I respectfully request that this allocation be removed or substantially reduced prior to submission for independent examination.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4750

Derbyniwyd: 20/02/2026

Respondent ID: 2913

Ymatebydd: Mrs Kim Mills

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The water run off will be lost if houses built here, as well as the destruction to the natural environment/ ecology. The main road/artery is already blocked daily with traffic not allowing a flowing thoroughfare. This congestion alone is bad for air pollution and this would be added too with the consent of this build.

Testun llawn:

The water run off will be lost if houses built here, as well as the destruction to the natural environment/ ecology. The main road/artery is already blocked daily with traffic not allowing a flowing thoroughfare. This congestion alone is bad for air pollution and this would be added too with the consent of this build.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4751

Derbyniwyd: 20/02/2026

Respondent ID: 2914

Ymatebydd: Mrs Ruth Clogg

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Our village ( turning into a town ) can not cope with these extra houses, the roads now are congested god only knows how it will cope with these extra cars the floods that we experience now this will only make matters worse, we are losing our picturesque village.

Testun llawn:

Our village ( turning into a town ) can not cope with these extra houses, the roads now are congested god only knows how it will cope with these extra cars the floods that we experience now this will only make matters worse, we are losing our picturesque village.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4752

Derbyniwyd: 20/02/2026

Respondent ID: 2915

Ymatebydd: Mr Elgan Evans

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

As a resident of Dinas Powys living 800m from the proposed site, I strongly object to this development. The village lacks the infrastructure to support 250 additional homes. The scheme relies on an already congested road network that has operated at or beyond capacity for years with little/no active travel links nearby. Local schools and NHS services are overstretched, and parking at Eastbrook Station is routinely full. Development here would increase flood risk, potentially affecting nearby properties, and cause unacceptable ecological harm. It would erode Green Belt land and fundamentally alter the character and identity of the village.

Testun llawn:

As a resident of Dinas Powys living 800m from the proposed site, I strongly object to this development. The village lacks the infrastructure to support 250 additional homes. The scheme relies on an already congested road network that has operated at or beyond capacity for years with little/no active travel links nearby. Local schools and NHS services are overstretched, and parking at Eastbrook Station is routinely full. Development here would increase flood risk, potentially affecting nearby properties, and cause unacceptable ecological harm. It would erode Green Belt land and fundamentally alter the character and identity of the village.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4753

Derbyniwyd: 20/02/2026

Respondent ID: 2917

Ymatebydd: Mrs Rhian Evans

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

As a resident of Dinas Powys living 800m from the proposed site, I strongly object to this development. The village lacks the infrastructure to support 250 additional homes. The scheme relies on an already congested road network that has operated at or beyond capacity for years with little/no active travel links. Local schools and NHS services are overstretched, and parking at Eastbrook Station is routinely full. Development here would increase flood risk, potentially affecting nearby properties, and cause unacceptable ecological harm. It would erode Green Belt land and fundamentally alter the character and identity of the village.

Testun llawn:

As a resident of Dinas Powys living 800m from the proposed site, I strongly object to this development. The village lacks the infrastructure to support 250 additional homes. The scheme relies on an already congested road network that has operated at or beyond capacity for years with little/no active travel links. Local schools and NHS services are overstretched, and parking at Eastbrook Station is routinely full. Development here would increase flood risk, potentially affecting nearby properties, and cause unacceptable ecological harm. It would erode Green Belt land and fundamentally alter the character and identity of the village.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4754

Derbyniwyd: 20/02/2026

Respondent ID: 2352

Ymatebydd: Mrs Shelley Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I thInk everyone understands the need for housing BUT flooding issues, services, infrastructure nees to be thoroughly addressed FIRST!

DOCTORS, TRAFFIC, SCHOOLS!! All are under pressure and over stretched!!
I can't see how this will work.
This land is very low lying, subject to flooding.
MAYBE YOU WILL NEED HOUSES ON STILTS???

Testun llawn:

I thInk everyone understands the need for housing BUT flooding issues, services, infrastructure nees to be thoroughly addressed FIRST!

DOCTORS, TRAFFIC, SCHOOLS!! All are under pressure and over stretched!!
I can't see how this will work.
This land is very low lying, subject to flooding.
MAYBE YOU WILL NEED HOUSES ON STILTS???

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4755

Derbyniwyd: 20/02/2026

Respondent ID: 2947

Ymatebydd: Mr John Clogg

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I have lived in Dinas Powys for over 60 years. We already don’t have the infrastructure and amenities to accommodate the existing residents. The additional 250 houses will add more strain on traffic, schools, GP, flooding, etc and have a negative impact on our village community.

Testun llawn:

I have lived in Dinas Powys for over 60 years. We already don’t have the infrastructure and amenities to accommodate the existing residents. The additional 250 houses will add more strain on traffic, schools, GP, flooding, etc and have a negative impact on our village community.
Mr John Clogg.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4756

Derbyniwyd: 14/02/2026

Respondent ID: 2918

Ymatebydd: Mr Michael Wilson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I have the following concerns over this development:
Increased traffic problems, especially at rush hours, on a busy road which has been proposed for a bypass back in the 1970s.
Exit entrance to site from a road with a bus lane, cycle lane and close proximity to traffic lights.
Extra air pollution close to residential areas and a primary school from extra traffic.
Increased pressure on over stretched schools, health centre and other community facilities.
Likely problems with sewage and groundwater in an area prone to flooding already.
Increase in traffic (250 houses=400 vehicles) will push more road users to use " rat runs " like Penyturn Pike, Longmeadow and the Westra.

Testun llawn:

I have the following concerns over this development:
Increased traffic problems, especially at rush hours, on a busy road which has been proposed for a bypass back in the 1970s.
Exit/entrance to site from a road with a bus lane, cycle lane and close proximity to traffic lights.
Extra air pollution close to residential areas and a primary school from extra traffic.
Increased pressure on over stretched schools, health centre and other community facilities.
Likely problems with sewage and groundwater in an area prone to flooding already.
Increase in traffic (250 houses=400 vehicles) will push more road users to use " rat runs " like PenyturnPike, Longmeadow and the Westra.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4758

Derbyniwyd: 20/02/2026

Respondent ID: 2920

Ymatebydd: Justine Pang

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The traffic will be horrendous on Cardiff road as well as the local services being overrun!

Testun llawn:

The traffic will be horrendous on Cardiff road as well as the local services being overrun!

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4759

Derbyniwyd: 20/02/2026

Respondent ID: 2921

Ymatebydd: Mr Lewis Cook

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The local area is already struggling with traffic, road repairs, waiting lists, infrastructure, flooding. I strongly oppose any further housing before providing at least new roads to reduce risk of inconvenience or injury.

Testun llawn:

The local area is already struggling with traffic, road repairs, waiting lists, infrastructure, flooding. I strongly oppose any further housing before providing at least new roads to reduce risk of inconvenience or injury.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4760

Derbyniwyd: 20/02/2026

Respondent ID: 2027

Ymatebydd: Miss Samantha James

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

OBJECT - The roads are not adequate for the currents amount of housing currently. Traffic is making it unpossible to leave the village for the current owners.
This is a concern for the schools on the main road. Car fumes getting breathed in by our children whilst there within school grounds. We already struggle to get doctor appointments already so how can they services be stretched for another 100 houses never alone more.

Testun llawn:

OBJECT - The roads are not adequate for the currents amount of housing currently. Traffic is making it unpossible to leave the village for the current owners.
This is a concern for the schools on the main road. Car fumes getting breathed in by our children whilst there within school grounds. We already struggle to get doctor appointments already so how can they services be stretched for another 100 houses never alone more.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4761

Derbyniwyd: 20/02/2026

Respondent ID: 2922

Ymatebydd: Mrs Sophie Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I oppose development on the land North of Dinas Powys because it would significantly harm the village. Traffic is already severe, and additional housing would worsen congestion, increase pollution, and strain local roads. The development would also put pressure on schools, healthcare, and other services, reducing quality of life. Furthermore, it would lead to the loss of valuable green space and the village’s character, which residents deeply value.

Testun llawn:

I oppose development on the land North of Dinas Powys because it would significantly harm the village. Traffic is already severe, and additional housing would worsen congestion, increase pollution, and strain local roads. The development would also put pressure on schools, healthcare, and other services, reducing quality of life. Furthermore, it would lead to the loss of valuable green space and the village’s character, which residents deeply value.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4762

Derbyniwyd: 20/02/2026

Respondent ID: 2924

Ymatebydd: Mr Jack Donnelly

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I believe the proposed plans will harm local wildlife, reduce residents' quality of life, and strain existing healthcare and services. Flooding risks will rise due to land concreting, and noise, light, and air quality will negatively affect woodland and farms. The dangerous Pen-y-Turnpike will see increased traffic and accidents, endangering both drivers and wildlife. Residents' concerns are ignored, and the village cannot support more residents without damaging its character, green spaces, and living standards for future generations.

Testun llawn:

The proposed plans will impact the wildlife, quality of life of the Dinas and Michaelston residents, increase the strain on an already strained GP, negatively impact the rest of the local services. Flooding will increase with concreting over the land. Sound, light and air quality will have a drastic impact on the woodland trust and local farms and their livestock. the pen-y-turnpike is an extremely dangerous road which is seldom looked after in terms of pot holes. the proposed developments would increase the use of the road and increase fatalities on drivers and wildlife. the residents in this catchment are ignored at every turn, the village and its infrastructure cannot take any more residents without irreversibly changing the fabric of the area, massively reducing the quality of living standards, and obliterating green areas which we'll never get back for future generations.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4763

Derbyniwyd: 20/02/2026

Respondent ID: 2927

Ymatebydd: Mrs Shirley Richardson

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Very concerned about the poor road surfaces in Dinas Powys, lack ok parking and enforcement for illegal/dangerous parking. Highly congested driving routes, no safe cycle and walking lanes as alternatives to Barry and no by-pass. Amenities not in place to support additional housing. Decline in air quality, recreation grounds and well-being of current residents disregarded. Most likely increase flood risk due to lack of vegetation. I moved from Cardiff to Dinas in order to escape the traffic and enjoy village life. Urgent improvements in Dinas must be completed first before any additional housing can be integrated successfully.

Testun llawn:

Very concerned about the poor road surfaces in Dinas Powys, lack ok parking and enforcement for illegal/dangerous parking. Highly congested driving routes, no safe cycle and walking lanes as alternatives to Barry and no by-pass. Amenities not in place to support additional housing. Decline in air quality, recreation grounds and well-being of current residents disregarded. Most likely increase flood risk due to lack of vegetation. I moved from Cardiff to Dinas in order to escape the traffic and enjoy village life. Urgent improvements in Dinas must be completed first before any additional housing can be integrated successfully.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4764

Derbyniwyd: 21/02/2026

Respondent ID: 2928

Ymatebydd: Mrs Hannah Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The infrastructure we have in Dinas Powys is already under strain. Adding an extra 250 houses and cars will cause chaos in an area that is already struggling.

Testun llawn:

The infrastructure we have in Dinas Powys is already under strain. Adding an extra 250 houses and cars will cause chaos in an area that is already struggling.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4765

Derbyniwyd: 21/02/2026

Respondent ID: 2930

Ymatebydd: Ms Nicola Meredith

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Too many cars already for Cardiff Road to cope with. Adding more cars would be a disaster, impacting on the quality of life of residents and commuters.

Testun llawn:

This site is inappropriate for development of houses for many reasons. The main one is grossly inadequate road infrastructure and a lack of provision of an appropriate highway. Cardiff Road is a bottle neck for traffic already. It is almost constantly nose to nose traffic. Adding more cars to this would exacerbate the issue greatly, and with houses come cars... Lots of cars... Please rethink this. Life is getting increasingly difficult in Dinas Powys due to the constant traffic, and this would make a bad situation even worse. The people who live here are very saddened by the lack of listening by the council on this matter. Please listen to us. We are counting on you.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4766

Derbyniwyd: 21/02/2026

Respondent ID: 2103

Ymatebydd: Miss Lauren Knight

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Lack of infrastructure in surrounding areas. Cardiff road already at capacity for most parts of the day. No access to site via pen-y-turnpike which would alleviate road pressures.

Testun llawn:

Lack of infrastructure in surrounding areas. Cardiff road already at capacity for most parts of the day. No access to site via pen-y-turnpike which would alleviate road pressures.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4767

Derbyniwyd: 21/02/2026

Respondent ID: 1808

Ymatebydd: Mr Ian Christopher

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The road, schools, health and other services are not sufficient to support the scale of this development.

Testun llawn:

The road, schools, health and other services are not sufficient to support the scale of this development.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4768

Derbyniwyd: 21/02/2026

Respondent ID: 2932

Ymatebydd: Miss Rachel Brown

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Traffic, flood risks and accessing timely health care at the GP are already tedious in Dinas Powys. Adding this many houses will mean more cars (more traffic, more potholes which are already a big issue, more polution).
Losing so much green space will also impact the ability for Dinas to manage water. We need green space to help reduce the risk of flooding - not more concrete.

Newid wedi’i awgrymu gan ymatebydd:

Far fewer houses with much more green space left to nature.

Testun llawn:

Traffic, flood risks and accessing timely health care at the GP are already tedious in Dinas Powys. Adding this many houses will mean more cars (more traffic, more potholes which are already a big issue, more polution).
Losing so much green space will also impact the ability for Dinas to manage water. We need green space to help reduce the risk of flooding - not more concrete.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4769

Derbyniwyd: 21/02/2026

Respondent ID: 2931

Ymatebydd: Mrs Carla Bluett

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

I do not care about the promotion of the Welsh language, with all the other problems our communities have I think Welsh language is of little importance.

Crynodeb o'r Gynrychiolaeth:

Whilst I understand the need for additional housing, this development reduces the green belt which is detrimental to Dinas Powys’ identity as a community and to the wildlife on the site. There is not enough road capacity - we need a bypass around Dinas to divert Barry traffic which has also seen a massive rise in population with developments there. Doctors already at capacity and I struggle to get an appointment as it is, this will be made worse. Schools need additional investment - not just Welsh speaking!! I also worry about flooding.

Newid wedi’i awgrymu gan ymatebydd:

It either needs to be scrapped or relevant road adjustments I.e. a bypass or similar to divert Barry traffic away from Dinas Powys. Massive improvements needs to be made in infrastructure such as doctors surgeries and schools. Investment to support local businesses thrive.

Testun llawn:

Whilst I understand the need for additional housing, this development reduces the green belt which is detrimental to Dinas Powys’ identity as a community and to the wildlife on the site. There is not enough road capacity - we need a bypass around Dinas to divert Barry traffic which has also seen a massive rise in population with developments there. Doctors already at capacity and I struggle to get an appointment as it is, this will be made worse. Schools need additional investment - not just Welsh speaking!! I also worry about flooding.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4770

Derbyniwyd: 21/02/2026

Respondent ID: 1788

Ymatebydd: Mrs Amy Murphy

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The Dinas Powys area is already overly populated, added housing will put a strain on schools, doctors, dentists, the environment (extra cars on the road) and traffic will be considerably increased in an area that is already very congested.

Also the land is home to wildlife, what happens to the creatures we share the land with?

I feel this is a bad choice also due to the rivers in Dinas. Rain water runs off the area into brooks and the river which regularly floods.

Please do not use this land for more houses.

Testun llawn:

The Dinas Powys area is already overly populated, added housing will put a strain on schools, doctors, dentists, the environment (extra cars on the road) and traffic will be considerably increased in an area that is already very congested.

Also the land is home to wildlife, what happens to the creatures we share the land with?

I feel this is a bad choice also due to the rivers in Dinas. Rain water runs off the area into brooks and the river which regularly floods.

Please do not use this land for more houses.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4774

Derbyniwyd: 22/02/2026

Respondent ID: 2935

Ymatebydd: Mr Nicholas Stork

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

I feel it will further damage they language and place pressure on the limited education resources in the area

Crynodeb o'r Gynrychiolaeth:

As a resident in Dinas Powys for 9 years plus, I seen the impact on the community from the continued building in the Vale of Glamorgan. Both the Cardiff Rd and Penyturnpike Lane are heavily congested at the best of times and gridlocked if impact by roadworks or an accident.

Drainage and flooding is an increasing issue and I’m not sure how the local infrastructure could tolerate a scheme of this size.

All local schools are heavily subscribed and again there is the infrastructure or space to provide more.

Newid wedi’i awgrymu gan ymatebydd:

I don’t think this scheme should go ahead - the impact on Dinas Powys I feel would be significant and cause even more challenges to the existing residents and infrastructure.

Testun llawn:

As a resident in Dinas Powys for 9 years plus, I seen the impact on the community from the continued building in the Vale of Glamorgan. Both the Cardiff Rd and Penyturnpike Lane are heavily congested at the best of times and gridlocked if impact by roadworks or an accident.

Drainage and flooding is an increasing issue and I’m not sure how the local infrastructure could tolerate a scheme of this size.

All local schools are heavily subscribed and again there is the infrastructure or space to provide more.