Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4723

Derbyniwyd: 17/02/2026

Respondent ID: 2298

Ymatebydd: Mr Luke Bellamy

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Thousands of homes downstream in Barry. *One single track A road from Barry to Cardiff with already constant gridlock in Dinas powys. * Road that floods regularly and is in a shocking state. *Emissions already over legal limits So...... You propose to build 250 house on land that currently soaks up water and put the entrance right on a traffic pinch point. But.... *Land owned by persimmon so will already be on council balance sheet. Therefore look forward to the whitewash. * Flood report *Traffic assesment (prob run at 2am on Sunday) *Environmental report. *Fantasy sustainable travel predictions

Testun llawn:

Thousands of homes downstream in Barry. *One single track A road from Barry to Cardiff with already constant gridlock in Dinas powys. * Road that floods regularly and is in a shocking state. *Emissions already over legal limits So...... You propose to build 250 house on land that currently soaks up water and put the entrance right on a traffic pinch point. But.... *Land owned by persimmon so will already be on council balance sheet. Therefore look forward to the whitewash. * Flood report *Traffic assesment (prob run at 2am on Sunday) *Environmental report. *Fantasy sustainable travel predictions