HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

Yn dangos sylwadau a ffurflenni 481 i 510 o 528

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6864

Derbyniwyd: 11/03/2026

Respondent ID: 3695

Ymatebydd: Mr Robert Mcateer

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Object

Testun llawn:

Object

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6867

Derbyniwyd: 11/03/2026

Respondent ID: 3696

Ymatebydd: Mrs Aimee Mackenzie

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Increased congestion in an already congested village after the last development at Scholars Park. Availability at our local doctors surgery already at capacity. Loss of wildlife!!!

Testun llawn:

Increased congestion in an already congested village after the last development at Scholars Park. Availability at our local doctors surgery already at capacity. Loss of wildlife!!!

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6868

Derbyniwyd: 11/03/2026

Respondent ID: 3697

Ymatebydd: Mrs Eileen May

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object because I am concerned about increased traffic congestion, I object because of doctors and schools already at capacity. I am worried about the impact on our NHS services locally.

Testun llawn:

I object because I am concerned about increased traffic congestion, I object because of doctors and schools already at capacity. I am worried about the impact on our NHS services locally.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6869

Derbyniwyd: 11/03/2026

Respondent ID: 3698

Ymatebydd: Mrs Margret Lloyd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

As a 90 year old, I am already concerned about the difficulty in getting an appointment at the Doctors. It will be even harder if a housing estate of 250 houses is built. Very concerned about the extra traffic the new estate will bring. Traffic can be nose to tail for hours during the day. Roads are in a dreadful state already with large potholes. Will schools have the capacity for more children. Worried about the risk of flooding due to more housing being built. Loss of green space between Dinas Powys and Llandough.

Testun llawn:

As a 90 year old, I am already concerned about the difficulty in getting an appointment at the Doctors. It will be even harder if a housing estate of 250 houses is built. Very concerned about the extra traffic the new estate will bring. Traffic can be nose to tail for hours during the day. Roads are in a dreadful state already with large potholes. Will schools have the capacity for more children. Worried about the risk of flooding due to more housing being built. Loss of green space between Dinas Powys and Llandough.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6871

Derbyniwyd: 11/03/2026

Respondent ID: 3699

Ymatebydd: Miss Helen Lloyd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Increase of traffic on an already congested road. I live on Cardiff road and I can see throughout the day how much traffic is on the road. Worried re capacity at the health centre already difficult to get an appointment. We already have patients from Penarth due to there GP's closing. As a car driver I can see the state of the roads eg potholes. What will happen to the roads if we have even more traffic on the roads. Rail transport-Eastbrook is already a really busy station. It will be the nearest station to the proposed new estate. How will the trains cope with all the extra passengers.

Testun llawn:

Increase of traffic on an already congested road. I live on Cardiff road and I can see throughout the day how much traffic is on the road. Worried re capacity at the health centre already difficult to get an appointment. We already have patients from Penarth due to there GP's closing. As a car driver I can see the state of the roads eg potholes. What will happen to the roads if we have even more traffic on the roads. Rail transport-Eastbrook is already a really busy station. It will be the nearest station to the proposed new estate. How will the trains cope with all the extra passengers.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6872

Derbyniwyd: 11/03/2026

Respondent ID: 3700

Ymatebydd: Miss S.C Lawrence

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Absolutely ridiculous to have more houses in Dinas Powys. The traffic through Dinas is awful!! Especially morning and evening rush hours. Schools, Doctors etc are at capacity.

Testun llawn:

Absolutely ridiculous to have more houses in Dinas Powys. The traffic through Dinas is awful!! Especially morning and evening rush hours. Schools, Doctors etc are at capacity.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6873

Derbyniwyd: 11/03/2026

Respondent ID: 3701

Ymatebydd: Mrs Shelagh Lane

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Previous flooding has effected Dinas Powys. This problem will only get worse with this development. No infrastructure for extra school, doctors which is a big problem already. Traffic.

Testun llawn:

Previous flooding has effected Dinas Powys. This problem will only get worse with this development. No infrastructure for extra school, doctors which is a big problem already. Traffic.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6874

Derbyniwyd: 11/03/2026

Respondent ID: 3702

Ymatebydd: Mrs Dianne Lane

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

My objections are we don't have the infrastructure to support more houses e.g poor services roads full of pot holes, overcrowded schools. Oversubscribed doctors, dentists poor postal services. Life is already a struggle in this area without adding to it.

Testun llawn:

My objections are we don't have the infrastructure to support more houses e.g poor services roads full of pot holes, overcrowded schools. Oversubscribed doctors, dentists poor postal services. Life is already a struggle in this area without adding to it.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6875

Derbyniwyd: 11/03/2026

Respondent ID: 3703

Ymatebydd: Mr Stephen Kinchen

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to HG1 KS2 Eastbrook because these fields already hold water after heavy rain. With no modelling downstream impact, no accumulative assessment and no evidence of drainage network capacity (Residents Group Objection, section 3) building here would put homes, roads, local schools and businesses at serious risk.
The roads through Dinas Powys are already congested and stressed. No traffic modelling, junction capacity testing has been provided. Lack of sensible secondary access makes the site unsafe and would hinder emergency services access.

Testun llawn:

I object to HG1 KS2 Eastbrook because these fields already hold water after heavy rain. With no modelling downstream impact, no accumulative assessment and no evidence of drainage network capacity (Residents Group Objection, section 3) building here would put homes, roads, local schools and businesses at serious risk.
The roads through Dinas Powys are already congested and stressed. No traffic modelling, junction capacity testing has been provided. Lack of sensible secondary access makes the site unsafe and would hinder emergency services access.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6876

Derbyniwyd: 11/03/2026

Respondent ID: 3704

Ymatebydd: Mrs Hilary Kinchen

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposals on the following grounds. The roads through Dinas Powys are already very congested and overworked. No convincing traffic management or junction capacity assessments have been put forward. No secondary access to the site is dangerous and may cause difficulty for emergency services. No work on the impact of the development on local schools and services has been published. The fields where the site is absorbs excess rainfall. No modelling of the impact of the development on downstream water drainage capacity or the ability of the waterways to cope with the additional run off is available. Downstream areas have already suffered from flooding. The additional water world threaten houses, schools and local businesses.

Testun llawn:

I object to the proposals on the following grounds. The roads through Dinas Powys are already very congested and overworked. No convincing traffic management or junction capacity assessments have been put forward. No secondary access to the site is dangerous and may cause difficulty for emergency services. No work on the impact of the development on local schools and services has been published. The fields where the site is absorbs excess rainfall. No modelling of the impact of the development on downstream water drainage capacity or the ability of the waterways to cope with the additional run off is available. Downstream areas have already suffered from flooding. The additional water world threaten houses, schools and local businesses.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6877

Derbyniwyd: 11/03/2026

Respondent ID: 3705

Ymatebydd: Mr James Kidby

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Traffic congestion, flooding major issue, destroying green space, carbon pollution from cars, noise pollution, wildlife will decrease significantly.

Testun llawn:

Traffic congestion, flooding major issue, destroying green space, carbon pollution from cars, noise pollution, wildlife will decrease significantly.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6878

Derbyniwyd: 11/03/2026

Respondent ID: 3574

Ymatebydd: Mr Malcolm Phillips

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am concerned that the proposed development will increase traffic congestion on Dinas Powys's main road, already heavily congested and polluted, affecting nearby schools and residents. Flooding since 2020, alongside inadequate railway station facilities due to accessibility issues and ageing water infrastructure, exacerbates these issues. Local services such as healthcare and schools are already overstretched, and wildlife is at risk if greenfield sites are developed instead of brownfield. I urge planners to reconsider the site to avoid worsening traffic, infrastructure strain, and environmental impact.

Testun llawn:

The proposed development will cause a great deal of concern in reguards to vehicular traffic having to use the mian road through Dinas Powys. This road is heavily congested at the best of times, traffic fumes pollute the air and nearby is a school which the children who attend are breathing in these toxic fumes. Since December 2020 when the village suffered severe flooding causing almost 100 houses to be affected and damaged by flood water. In the years since Eastbrook has seen many instances of flooding along Cardiff Road nearly to Eastbrook Railway Station. Public transport already suffers as a result of gridlocked traffic Cardiff Bus who operate their 95 service have had to amend its route stopping in Cardiff City Centre due to not being able to maintain its scheduled timetable, to the Health Hospital. Our railway station at Eastbrook is not fit for purpose it fails to accommodate the needs of wheelchair users, parents with prams and persons using mobility scooters etc as no lifts are provided to get from one side to another. The station features highly as a vital part of this proposed development in regards to active travel. Another concern I have is that of infrastructure in drainage systems and water mains. Recently Dinas Powys suffered a massive water leak after a main pipe cracked in St David's Avenue. Dwr Cymru stated that Dinas Powys supply pipes are ancient and prone to further instances of failure. Our medical centre at the Murch is suffering with patient numbers increasing as a result of a closure of a practice in nearly Penarth. How will it cope with extra demand as a result of this proposed development. Our schools which are already oversubscribed will also be put under pressure. At the recent drop in events at Murchfield community centre many people with concerns were seeking answers from officials from VOG council who were unable to answer many questions which were asked. Wildlife featured highly in the area outlined in the proposal. To lose the greenfield site disastrous there surely is ample brownfield sites available for development. It seems Dinas Powys has been singled out because of it's extremely intensive means of public transport available, trains and buses. If this development goes ahead Cardiff Road will become one big continuous traffic jams. A further new road junction. A further set of traffic jams. More congestion. More harmful traffic jams. More pressure on aging infrastructure. I urge the planners to reconsider this development and site it elsewhere.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6879

Derbyniwyd: 11/03/2026

Respondent ID: 3707

Ymatebydd: Mrs Jill Phillips

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

As a resident of over 30 years, I object to the proposed development of 250 houses at Eastbrook, Dinas Powys, fearing it will worsen traffic, flooding, and environmental damage. I have witnessed increased traffic noise, fumes, and flooding, which I believe are inadequately addressed in the flood assessment report. I am concerned about the outdated monitoring data, the impact on wildlife habitats, and the potential strain on the ageing sewage system. I believe the development poses an unacceptable risk to the community, especially lower-lying residents affected by flooding.

Testun llawn:

As a resident I am writing to raise objection to the proposal to develop land at Eastbrook north of Dinas Powys for the purpose of 250 new build houses.
This I concur will have a detrimental effect on the community of Dinas Powys as a whole. As a resident for some 30+ years I have first hand experience and witnessed the ever increased traffic noise and fumes that occurs on a daily basis along Cardiff road to which my back garden faces.
This is especially concerning when traffic is idling as a result of gridlock!
Another concerning factor is the amount of flooding that Dinas Powys has experienced over several years. I am were extensively damaged by flooding. And this disturbingly has been omitted from A Strategic flooding assessment report! But later it mentions proposal to woodland planting to hold back rainstorm run of?
Yet the Vale of Glamorgan Council have been compliant to a development of replacement natural nature i.e Meadowland, Trees Hedgerows and soil with concrete and Tarmac!! Not to mention the irreplaceable loss of wildlife habitat, flora and fauna.
Boyer consultation illustrate that consideration in respect of current conditions on site and how the proposal scheme intends to deliver suitable mitigation to achieve an overall betterment from flood risk perspective.
I am interested to know how long ago this monitoring undertaken because it is clearly out of date and will be significantly by the time any future development takes place. Already to date there has been substantial rainfall everyday during months of January and February and the probability of more in the future!
This may not predominantly effect the said development considering it is geographically on higher ground. But it is the residents who live at the lower points of Dinas Powys that will be effected by flooding.
Not to mention the Archaic and outdated sewage system that will possibly not take any any further Blackwater from another 250+ houses + purge through it!
The brook opposite my property at Brookside has since the 2020 flooding, come close to breaching it's banks and awash onto Cardiff Road.
During heavy and prolonged rainfall water come up through manholes between Eastbrook station and St David's avenue junction with Cardiff Road. This again raises my concerns considering the main drains were flushed through along Cardiff Road some 2-3 years ago. The development therefore presents on unacceptable and avoidable risk to the community of Dinas Powys.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6880

Derbyniwyd: 11/03/2026

Respondent ID: 1886

Ymatebydd: Mrs Angela Peterken

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the development of Eastbrook area of Dinas Powys. The area is unsuitable as the infrastructure is unable to cope with such an increase in population cars + development. More than ever we need our green spaces, the area is full of wildlife and our country has a nature deficit. The roads are at capacity, the Dr's full, dentists full, gas, water + electricity infrastructure wearing out. Dinas Powys has no job opportunities so people will need to travel to work. Public transport is not accessible to many or decent go to the right places so most people will travel by car + our roads are at capacity. Active travel is non existent or not joined up. The centre of Dinas Powys has no cycle lanes + the one out towards to Llandough is not joined up to anything. This development will effect everyone in Dinas Powys if it goes ahead.

Testun llawn:

I object to the development of Eastbrook area of Dinas Powys. The area is unsuitable as the infrastructure is unable to cope with such an increase in population cars + development. More than ever we need our green spaces, the area is full of wildlife and our country has a nature deficit. The roads are at capacity, the Dr's full, dentists full, gas, water + electricity infrastructure wearing out. Dinas Powys has no job opportunities so people will need to travel to work. Public transport is not accessible to many or decent go to the right places so most people will travel by car + our roads are at capacity. Active travel is non existent or not joined up. The centre of Dinas Powys has no cycle lanes + the one out towards to Llandough is not joined up to anything. This development will effect everyone in Dinas Powys if it goes ahead.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6881

Derbyniwyd: 11/03/2026

Respondent ID: 2250

Ymatebydd: Mr Roger Newberry

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed housing development on land to the North of Dinas Powys on land near Seel Park. I am devastated that this beautiful part of nature will be lost to future generation if these plans are proposed. I would suggest the following would be valid reasons for refusal of planning permission.
Cardiff Road is gridlocked for most of the day. It cannot take another possible 300-500 cars a day.
Flooding risks in Dinas are real and building the homes would make the problem much worse. The fields historically flood very badly anyway. Local schools and medical centre have no room. Last week I rang the doctor 98 times before I could get through - this is not acceptable.
The proposals reliance on a single entry is not acceptable for multiple reasons. Please listen to the huge number of voices against this plan. Please listen to the people.

Testun llawn:

I object to the proposed housing development on land to the North of Dinas Powys on land near Seel Park. I am devastated that this beautiful part of nature will be lost to future generation if these plans are proposed. I would suggest the following would be valid reasons for refusal of planning permission.
Cardiff Road is gridlocked for most of the day. It cannot take another possible 300-500 cars a day.
Flooding risks in Dinas are real and building the homes would make the problem much worse. The fields historically flood very badly anyway. Local schools and medical centre have no room. Last week I rang the doctor 98 times before I could get through - this is not acceptable.
The proposals reliance on a single entry is not acceptable for multiple reasons. Please listen to the huge number of voices against this plan. Please listen to the people.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6882

Derbyniwyd: 11/03/2026

Respondent ID: 3708

Ymatebydd: Miss Gemma Power

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

The proposed development could have a negative impact on the Welsh Language by increased housing in the area without clear measure to support and promote the use of Welsh. Large development may bring people from outside the local community, which could reduce the proportion of Welsh Speakers and weaken opportunity to use the language in everyday life.

Crynodeb o'r Gynrychiolaeth:

I object to the allocation of site HG1 KS2 for development. The proposed development would have a negative impact on the surrounding area and existing community. It would place additional pressure on local infrastructure, particularly roads, which already experience congestion are are not suitable for increased traffic. The development would also result in the loss of valuable green space that contribute to the character of the are and supports local wildlife. Local services such as schools and hospital and transport are already limited and may struggle to accommodate further housing. The proposal allocation would have a negative impact on the community and the surrounding environment.

Testun llawn:

I object to the allocation of site HG1 KS2 for development. The proposed development would have a negative impact on the surrounding area and existing community. It would place additional pressure on local infrastructure, particularly roads, which already experience congestion are are not suitable for increased traffic. The development would also result in the loss of valuable green space that contribute to the character of the are and supports local wildlife. Local services such as schools and hospital and transport are already limited and may struggle to accommodate further housing. The proposal allocation would have a negative impact on the community and the surrounding environment.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6883

Derbyniwyd: 11/03/2026

Respondent ID: 3709

Ymatebydd: Mrs Sarah Pugh

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The development would increase congestion on roads already over capacity. New schools, nureries and doctors surgeries would be required for the number of new residents of the proposed development as current facilities/amenities are already at capacity. We are in a climate emergency. Removing plantlife and habitats will make the situation worse. We will not reach the net zero targets if traffic increases to the 250 new homes. Exhaust fumes will increase air pollution and more local people will develop respiratory illnesses, putting further pressure on already over-stretched doctors surgery and NHS.

Testun llawn:

The development would increase congestion on roads already over capacity. New schools, nureries and doctors surgeries would be required for the number of new residents of the proposed development as current facilities/amenities are already at capacity. We are in a climate emergency. Removing plantlife and habitats will make the situation worse. We will not reach the net zero targets if traffic increases to the 250 new homes. Exhaust fumes will increase air pollution and more local people will develop respiratory illnesses, putting further pressure on already over-stretched doctors surgery and NHS.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6884

Derbyniwyd: 11/03/2026

Respondent ID: 3710

Ymatebydd: Mrs Rachel Pugh-Alexander

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the following:-
Extra houses-more cars, roads already overly congested.
Schools and healthcare providers already oversubscribed.
Destroying more green belt and wildlife habitats-we need to preserve these.
Extra water runoff creating more potential for flooding during high rainfall which is occurring more often with global warming.
Dinas Powys is a village with village level amenities and with constant population growth from ongoing houses being built these amenities are already severely overstretched.

Testun llawn:

I object to the following:-
Extra houses-more cars, roads already overly congested.
Schools and healthcare providers already oversubscribed.
Destroying more green belt and wildlife habitats-we need to preserve these.
Extra water runoff creating more potential for flooding during high rainfall which is occurring more often with global warming.
Dinas Powys is a village with village level amenities and with constant population growth from ongoing houses being built these amenities are already severely overstretched.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6885

Derbyniwyd: 11/03/2026

Respondent ID: 3711

Ymatebydd: Mr Gareth Shaw

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Increased congestion-
250 homes could bring over 300-500 additional cars Cardiff Rd and Culverhouse Cross were already at capacity 5 years ago and there has been no subsequent upgrades.
Increased Flooding-
Water run off Eastbrook site will enter the Cadoxtan river which has bust and flooded homes in Dinas Powys many times. Doctors and Schools already at capcity.
Loss of wildlife-
Limited access to Eastbrook train station. No viable pedestrian access and inadequate parking at the station. Emergency services, first responders, A and E and maternity facilities all directly affected by the additional demand and congestion brought on by the development. Big reductions to the green belt boundary merging Dinas Powys to Llandough. These boundaries are meant to be protected spaces, not adjusted to fit an agenda. Dinas Powys population is continuously increasing and will lose it's identity as a village.

Testun llawn:

Increased congestion-
250 homes could bring over 300-500 additional cars Cardiff Rd and Culverhouse Cross were already at capacity 5 years ago and there has been no subsequent upgrades.
Increased Flooding-
Water run off Eastbrook site will enter the Cadoxtan river which has bust and flooded homes in Dinas Powys many times. Doctors and Schools already at capcity.
Loss of wildlife-
Limited access to Eastbrook train station. No viable pedestrian access and inadequate parking at the station. Emergency services, first responders, A and E and maternity facilities all directly affected by the additional demand and congestion brought on by the development. Big reductions to the green belt boundary merging Dinas Powys to Llandough. These boundaries are meant to be protected spaces, not adjusted to fit an agenda. Dinas Powys population is continuously increasing and will lose it's identity as a village.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6886

Derbyniwyd: 11/03/2026

Respondent ID: 2243

Ymatebydd: Mrs Kay Shaw

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

2) The traffic congestion through Dinas Powys especially Eastbrook, a new built can possibly add another 500 cars causing even more disruption. I have heard that there will be another set of traffic lights before the Merrier Harrier lights, which will cause more chaos. What about the emergency vehicles ie: paramedics, ambulance and fire services???
3) The risk of flooding. Dinas Powys was flooded in 2020 flood prevention measures have not been taken into account. These fields are practically impossible to navigate during winter months because of standing water on the fields-where will this water go if houses are built here-down into Cadoxton river cause more flooding.
5) These houses are supposedly being built because of the active travel route-the Eastbrook station is totally inadequate especially for disabled persons, elderly and mothers with pushchairs at prams.

Testun llawn:

1) Why have the Vale Council made the form online so hard to navigate and fill in out objections to the proposed build up in Eastbrook. I believe it was deliberate so that many people give up.
2) The traffic congestion through Dinas Powys especially Eastbrook, a new built can possibly add another 500 cars causing even more disruption. I have heard that there will be another set of traffic lights before the Merrier Harrier lights, which will cause more chaos. What about the emergency vehicles ie: paramedics, ambulance and fire services???
3) The risk of flooding. Dinas Powys was flooded in 2020 flood prevention measures have not been taken into account. These fields are practically impossible to navigate during winter months because of standing water on the fields-where will this water go if houses are built here-down into Cadoxton river cause more flooding.
4) I believe that the independent examination will be carried out by PEDW.
5) These houses are supposedly being built because of the active travel route-the Eastbrook station is totally inadequate especially for disabled persons, elderly and mothers with pushchairs at prams.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6888

Derbyniwyd: 11/03/2026

Respondent ID: 3712

Ymatebydd: Jane Sissons

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Dinas Powys is already at saturation point-we can't take anymore housing developments-the infrastructure is not there, schools over subscribed, Dr's bursting with patients. The flow through of traffic is already at capacity, you crawl along the main road most of the time. Traffic is too heavy for the roads flooding-already a big problem will be worse as the drains are old. We are losing our identity as a village-we do not want this- Dians Powys does not want to be lost as a village.

Testun llawn:

Dinas Powys is already at saturation point-we can't take anymore housing developments-the infrastructure is not there, schools over subscribed, Dr's bursting with patients. The flow through of traffic is already at capacity, you crawl along the main road most of the time. Traffic is too heavy for the roads flooding-already a big problem will be worse as the drains are old. We are losing our identity as a village-we do not want this- Dians Powys does not want to be lost as a village.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6932

Derbyniwyd: 11/03/2026

Respondent ID: 3714

Ymatebydd: Mr Jeremy Sissons

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Dinas Powys does not have the infrastructure for more houses the main road is always full and the Merry Harrier junction is running at capacity. The medical centre is full along with the 2 schools. Flooding is an issue in Dinas Powys-more houses are going to present more issues.

Testun llawn:

Dinas Powys does not have the infrastructure for more houses the main road is always full and the Merry Harrier junction is running at capacity. The medical centre is full along with the 2 schools. Flooding is an issue in Dinas Powys-more houses are going to present more issues.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6933

Derbyniwyd: 11/03/2026

Respondent ID: 3715

Ymatebydd: Miss Mary Spiller

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I strongly object to the extra traffic through Cardiff Road, Dinas Powys. Also the loss of habitat, plus more pollution. Emergency Vehicle access and the risk by blowing vehicles creating a single point of failure that could cost lives. Schools are at capacity already. Doctor's surgery will also be affected.

Testun llawn:

I strongly object to the extra traffic through Cardiff Road, Dinas Powys. Also the loss of habitat, plus more pollution. Emergency Vehicle access and the risk by blowing vehicles creating a single point of failure that could cost lives. Schools are at capacity already. Doctor's surgery will also be affected.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6934

Derbyniwyd: 11/03/2026

Respondent ID: 3716

Ymatebydd: Mrs E G Thomas

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

It is impossible to predict who will purchase or rent these new houses and the impact therefore is unknown.

Crynodeb o'r Gynrychiolaeth:

I strongly believe that this development will have a negative impact on the following issues that already worry the inhabitants of this village and the surrounding areas.
1) Flooding is already a problem
2) Traffic movement of lack of
3) Schooling-spaces are at a premium
4) Doctors and dentists are already at capacity
5) Public Transport
6) Village status will be lost

Testun llawn:

I strongly believe that this development will have a negative impact on the following issues that already worry the inhabitants of this village and the surrounding areas.
1) Flooding is already a problem
2) Traffic movement of lack of
3) Schooling-spaces are at a premium
4) Doctors and dentists are already at capacity
5) Public Transport
6) Village status will be lost

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6935

Derbyniwyd: 11/04/2026

Respondent ID: 3717

Ymatebydd: Mrs Sarah Thomas

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Construction of new houses will result in:
-Congestion/car fumes
-Blocking routes to UHW hospital and delaying abulences.
-No school places available locally
-Lack of G.P places
-Flooding because trees/land have been removed
-Lack of infrastructure/Roads
-Lack of green spaces for children
-Destruction of green spaces/wildlife affected
-Employees will have difficulty getting to work on time via Barry and Dinas Powys.

Testun llawn:

Construction of new houses will result in:
-Congestion/car fumes
-Blocking routes to UHW hospital and delaying abulences.
-No school places available locally
-Lack of G.P places
-Flooding because trees/land have been removed
-Lack of infrastructure/Roads
-Lack of green spaces for children
-Destruction of green spaces/wildlife affected
-Employees will have difficulty getting to work on time via Barry and Dinas Powys.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6936

Derbyniwyd: 11/03/2026

Respondent ID: 3718

Ymatebydd: Bharana Varsani

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I'm employee. It will impact getting in and out to work.

Testun llawn:

I'm employee. It will impact getting in and out to work.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6937

Derbyniwyd: 11/03/2026

Respondent ID: 3719

Ymatebydd: Mrs Anna Maria Villiers

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I believe that the proposal for building 250+homes will have a detrimental and devastating effect on Dinas Powys and the surrounding area.
1. Wildlife disturbance-foxes, newts, rabbits will all be effected.
2. Grasslands + Wetlands would vanish
3. Removing vegetation and soil.
4. Public rights of way lost.
5. Risk of flooding
6. Loss of wildlife
7. Destruction of ancient trees and hedgerows.
8. Increase in traffic and pollution and heavy congestion
9. Infrastructure affected
10. Doctors surgery to full capacity
11. Schools in area at full capacity
12. Hedgehog habitats
13. Water quality and hydrology-construction pollution
14. Peatlands of Carbon sinks
15. Historical/Cultural heritage - loss of historical landscape
16. Air pollution and emissions from construction.
17. Habitat loss + biodiversity-land clearing, development destroy natural habitats.

The above is my list of objections and concerns against the proposed development of 250+ houses in Dinas Powys.

Testun llawn:

I believe that the proposal for building 250+homes will have a detrimental and devastating effect on Dinas Powys and the surrounding area.
1. Wildlife disturbance-foxes, newts, rabbits will all be effected.
2. Grasslands + Wetlands would vanish
3. Removing vegetation and soil.
4. Public rights of way lost.
5. Risk of flooding
6. Loss of wildlife
7. Destruction of ancient trees and hedgerows.
8. Increase in traffic and pollution and heavy congestion
9. Infrastructure affected
10. Doctors surgery to full capacity
11. Schools in area at full capacity
12. Hedgehog habitats
13. Water quality and hydrology-construction pollution
14. Peatlands of Carbon sinks
15. Historical/Cultural heritage - loss of historical landscape
16. Air pollution and emissions from construction.
17. Habitat loss + biodiversity-land clearing, development destroy natural habitats.

The above is my list of objections and concerns against the proposed development of 250+ houses in Dinas Powys.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6949

Derbyniwyd: 11/03/2026

Respondent ID: 3720

Ymatebydd: Mr Dean Villiers

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I believe the proposal of the 250+ houses will be detrimental to Dinas Powys and the surrounding areas. These are a list of my concerns.
1. Natural Habitats and Biodiversity
Wild life habitats: Woodlands, grasslands, wetlands and ponds are frequently cleared, destroying homes for various species.
Biodiversity: The removal of vegetation and soil can lead to a decline in local wildlife, insects and plant life, contributing to the loss of nature.
Wildlife corridors: Developments often break up interconnected natural areas, preventing animals from migrating, foraging, or breeding which causes "FRAGMENTATION"
Ancient Trees and Hedgerows: Established, mature vegetation, that takes decades or centuries to grow can be removed in days.
2. Environmental and Physical Resources
Soil Structure: Top soil is often removed, compacted by machinery, or contaminated leading to soil erosion.
Peet lands and Carbon Sinks: The removal of natural carbon- storing landscapes removing stored carbon and destroying habitats that take thousands of years to form.
Water Quality and Hydrology:
Construction can cause pollution run off into rivers and streams, while increasing impermeable surfaces increases flood risk by affectively groundwater levels and flows.
Infrastructure capacity:
Local roads, schools can become overloaded and congested.

Testun llawn:

I believe the proposal of the 250+ houses will be detrimental to Dinas Powys and the surrounding areas. These are a list of my concerns.
1. Natural Habitats and Biodiversity
Wild life habitats: Woodlands, grasslands, wetlands and ponds are frequently cleared, destroying homes for various species.
Biodiversity: The removal of vegetation and soil can lead to a decline in local wildlife, insects and plant life, contributing to the loss of nature.
Wildlife corridors: Developments often break up interconnected natural areas, preventing animals from migrating, foraging, or breeding which causes "FRAGMENTATION"
Ancient Trees and Hedgerows: Established, mature vegetation, that takes decades or centuries to grow can be removed in days.
2. Environmental and Physical Resources
Soil Structure: Top soil is often removed, compacted by machinery, or contaminated leading to soil erosion.
Peet lands and Carbon Sinks: The removal of natural carbon- storing landscapes removing stored carbon and destroying habitats that take thousands of years to form.
Water Quality and Hydrology:
Construction can cause pollution run off into rivers and streams, while increasing impermeable surfaces increases flood risk by affectively groundwater levels and flows.
Infrastructure capacity:
Local roads, schools can become overloaded and congested.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6950

Derbyniwyd: 11/03/2026

Respondent ID: 3721

Ymatebydd: Mr Alan Virgo

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Flood risk increased. Emergency services overwhelmed. Traffic increased congestion. Loss of green space. Loss of village community status.

Testun llawn:

Flood risk increased. Emergency services overwhelmed. Traffic increased congestion. Loss of green space. Loss of village community status.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6951

Derbyniwyd: 11/03/2026

Respondent ID: 2100

Ymatebydd: Mrs susan virgo

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

This will be impossible to asses until the new people are in place.

Crynodeb o'r Gynrychiolaeth:

1. Increase in traffic along an already full capacity main road and Pen-y-Turn Pike lane. No safe walking and cycling route to train station and bus stop. Eastbrook and Dinas stations are not accessible for all. Access to schools, Doctor's surgery, dentists shops all reached with great difficultly on foot or cycle. At odds with sustainable travel as required by govt.
2. Flooding. We will be at extreme risk of further regular flooding. Floods of Dinas, Sully and Cosmeston 2020, not inc. in the reports produced for this housing project.
3. Schools and services are at full capacity at present without a further 250 new families.
4. Destruction of greenbelt land, resulting in the loss of wildlife habitats and open spaces for the enjoyment of all. These areas are meant to be for projected spaces.

Testun llawn:

1. Increase in traffic along an already full capacity main road and Pen-y-Turn Pike lane. No safe walking and cycling route to train station and bus stop. Eastbrook and Dinas stations are not accessible for all. Access to schools, Doctor's surgery, dentists shops all reached with great difficultly on foot or cycle. At odds with sustainable travel as required by govt.
2. Flooding. We will be at extreme risk of further regular flooding. Floods of Dinas, Sully and Cosmeston 2020, not inc. in the reports produced for this housing project.
3. Schools and services are at full capacity at present without a further 250 new families.
4. Destruction of greenbelt land, resulting in the loss of wildlife habitats and open spaces for the enjoyment of all. These areas are meant to be for projected spaces.

Atodiadau: