Will cause too much extra traffic and will put people off using Cardiff airport. Will destroy the countryside and effect the wildlife. Schools, doctors and dentists are already at capacity.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6294
Derbyniwyd: 09/03/2026
Respondent ID: 3226
Ymatebydd: Mr Jonathan Lambert
Cadarn? Heb nodi
I object to the Land at North West Barry site due to traffic concerns, supported by transport assessments indicating severe congestion and environmental impact from increased vehicles. The natural habitat, including protected badger setts, would be irrevocably harmed, and the site’s proximity to a SSSI raises concerns about damaging this protected area and green wedge removed that is used for agriculture. There is no provision for increased amenities like schools or healthcare. I believe brownfield sites should be prioritised over green spaces and that this site should be removed from the RLDP.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6310
Derbyniwyd: 10/03/2026
Respondent ID: 3534
Ymatebydd: Mrs Leanne Drew
Cadarn? Heb nodi
Doctors, schools and facilities are all at capacity. Traffic is gridlocked already in rush hours and in general pollution will increase. Traffic to airport will be disrupted, lack of incentive to use it.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6314
Derbyniwyd: 10/03/2026
Respondent ID: 3537
Ymatebydd: Miss Jodie Davies
Cadarn? Heb nodi
Impacts traffic in the area. Impacts access to public services. Parking capacity in the surrounding area not sufficient for the facilities-those visiting will end up busing it.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6319
Derbyniwyd: 10/03/2026
Respondent ID: 3540
Ymatebydd: Mrs Kay Perrett
Cadarn? Heb nodi
I object strongly to this planning application
1. The roundabout at Weycock Cross is already at full capacity most of the day Worse at early morning and evenings causing gridlock back onto Pontypridd Road. If on foot in this area it's becoming impossible to cross the road.
2. Public Transport in this area is a joke
3. This development will have such an impact on us residents in the area.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6329
Derbyniwyd: 10/03/2026
Respondent ID: 3545
Ymatebydd: Mr Bruce Perrett
Cadarn? Heb nodi
I object to the RLDP version for many reasons, but mainly traffic and safety. What are you doing, its our lovely town.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6341
Derbyniwyd: 10/03/2026
Respondent ID: 3546
Ymatebydd: Mrs Margaret Anderson
Cadarn? Heb nodi
Increasing traffic from the proposed Weycock Cross site would worsen congestion, causing chaos especially at rush hour and school times. Rhoose and surrounding areas already face issues like roadworks, potholes, and delays from Barry Docks Link Road. Our schools are overcrowded, and healthcare services are strained. Transport links are poor and no one is going to walk down to the train station and so will drive. Further development would reduce green spaces and habitats. This area needs to be preserved so leave Weycock Cross alone.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6344
Derbyniwyd: 10/03/2026
Respondent ID: 2594
Ymatebydd: Mrs Deborah Hamer
Cadarn? Heb nodi
This is the second form I have filled out, why my first form could not be transferred? because you have moved the goal posts!
1. No school facilities
2. No train services it is a good 50 mins walk to the nearest train station.
3. Bus service!!!
4. Nearly 400 houses, as most house are a two car family that another 800 cars on the road.
5. Every day I look outside onto the main road, to see cars queuing outside, over the weekends, as well as peak travelling times.
6. The last couple of housing developments had major problems with extensive infrastructure, leading to sewage flowing into the park and peoples houses on the docks.
7. No retail outlets near, etc food etc essentials.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6347
Derbyniwyd: 10/03/2026
Respondent ID: 3549
Ymatebydd: Mr Nicholas Anderson
Cadarn? Heb nodi
If all the new proposed houses are sold to Welsh speakers then obviously there would be a positive effect on Welsh being spoken locally
I believe the Weycock Cross roundabout is already difficult to navigate and is a key route into Barry and Cardiff. The area has limited public transport, making car use essential for residents. Airport traffic and hospital traffic also have to negotiate the traffic. Local healthcare services and schools are already under pressure. Developing on the green wedge site is unsettling and drainage runoff from new homes and roads would cause severe flooding downhill. I oppose the plan as it fails to address current problems and would significantly harm the well-being of Vale residents.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6350
Derbyniwyd: 10/03/2026
Respondent ID: 2600
Ymatebydd: Mrs Judith Bird
Cadarn? Heb nodi
No correct infrastructure. Port Rd already over congested.
Lack of dtrs appointments. Not enough English schools within walking distance, Site will increase reliance on car usage.
What happened to the 'Green Wedge between Rhoose and Barry?
Insufficient consideration given to existing residents
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6352
Derbyniwyd: 10/03/2026
Respondent ID: 2511
Ymatebydd: Miss Valerie Lyndon
Cadarn? Heb nodi
I am English and have no Welsh language.
I was unaware of the Deposit RLDP and have struggled with changes due to being computer illiterate. I attended a consultation event, but felt frustrated as issues raised were not properly recorded, and the response to traffic concerns was inadequate. We have no useful bus service at this end of the road and the older population cannot walk. There is a shortage of doctors and have to visit other GP's. The RLDP insufficiently plans for future needs and will negatively impact local residents. The proposed housing development could house over 750 people, straining healthcare and education services.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6355
Derbyniwyd: 10/03/2026
Respondent ID: 3556
Ymatebydd: Mrs Sheila Crow
Cadarn? Heb nodi
I oppose the proposed development at Weycock Cross, as it does not address current or forecasted traffic issues, and will worsen congestion affecting access to the airport. There are no buses to use the bus stops so the plan does nothing to change reliance on private cars. The plan does not improve public transport or health services, which are already strained. Additionally, the development conflicts with previous Green Wedge protections, why has this suddenly changed? and does nothing to improve residents health, safety, and community well-being. No way does the RLDP satisfy this criteria.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6357
Derbyniwyd: 10/03/2026
Respondent ID: 3557
Ymatebydd: Miss Ceri Morgan
Cadarn? Heb nodi
1. This development would reduce the openness of the countryside and harm the Green Wedge that currently separates Barry, Rhoose and St Athan. This loss of open land would damage landscape character and local amenity, and increase pressure for the settlements to merge. Consequently, the proposal is inconsistent with the the Green Wedge background paper supporting the Vale of Glamorgan Local Development Plan 2011 - 2026.
2. This development would add heavy traffic to the already congested A4226, slowing access to Cardiff Airport and the A48/M4. Recent accidents on Five Mile Lane already cause hours of gridlock, and up to 360 new homes would significantly worsen this. The scheme lacks adequate mitigation and would increase delays at Colcot and Wenvoe roundabouts. With four secondary schools nearby generating peak‑time traffic, the extra vehicles would place unsustainable pressure on local roads and intensify existing congestion.
3. The position of the proposed site entrance ail to provide safe visibility for drivers and pedestrians. This could lead to queuing and conflict with through traffic, especially during busy periods.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6361
Derbyniwyd: 10/03/2026
Respondent ID: 697
Ymatebydd: Mr Steve Thorne
Cadarn? Heb nodi
I am fully aware that the existing infrastructure is overloaded and totally unable to accommodate more development, traffic, foul water disposal and so on .
The above points were the fundamental and basic reasons why planning in 2010 was refused (when only 200 houses were proposed).
Since then numerous housing developments in the west of the Vale of Glamorgan have been completed putting increased pressure on roads, schools, health care and centres, drainage disposal (foul, storm and highway) and other statutory services.
The Nant Talwg watercourse is continuously being subjected to “emergency” sewage overflow situations - the foul system and pumping station cannot handle the current increased volumes.
The current infrastructure was not designed for today’s requirements - it is outdated and unable to cope with increased traffic volumes and loadings from the additional developments .
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6370
Derbyniwyd: 10/02/2026
Respondent ID: 3559
Ymatebydd: Mr Stuart Thompson
Cadarn? Heb nodi
Traffic capacity at Weycock is at 100% at peak times with no room for improvement. The route is the main access for airport traffic and emergency services that will be delayed. There will be a huge impact on health, schools and infrastructure. The development would also result in loss of habitats, breeding grounds and green wedge and increase water runoff overwhelming drainage into Millwood and causing flooding. It will increase pollution of streams in Porthkerry and outflow into the sea. the proposed mitigation will do nothing. The site ahs previously been refused and the situation ha sonly got worse.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6394
Derbyniwyd: 11/03/2026
Respondent ID: 2549
Ymatebydd: Mr Darryn Cross
Nifer y bobl: 272
Cadarn? Heb nodi
E-Petition hosted on Participate Vale - 272 signatures
Petition Title - Stop the Building of Houses at Weycock Cross Stop building on the green wedge. Stop Weycock Gridlock
Petition Summary - What you would like us to do - Remove the proposed development at Weycock Cross in Barry from the RLDP
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6398
Derbyniwyd: 11/03/2026
Respondent ID: 2549
Ymatebydd: Mr Darryn Cross
Nifer y bobl: 217
Cadarn? Heb nodi
Paper petition - 217 signatures
"Help Stop" Weycock Gridlock 376 Houses to be built right here on the Green Wedge
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6412
Derbyniwyd: 11/03/2026
Respondent ID: 3573
Ymatebydd: Mrs Jennifer Thorne
Cadarn? Heb nodi
Perhaps it will have an impact on the Welsh language as many of the people buying the expensive houses may come from England as this has appeared to have happened on the waterfront development.
Traffic congestion even with a change in road configuration, the volume of traffic will increase. Planners need to experience the congestion and the frustration like this causes. Building yet again on a greenfield site. Impact on farming, wildlife, trees and greenfield. Massive impacts on the environment. Impact on schools, Doctors, Dentists etc.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6419
Derbyniwyd: 10/03/2026
Respondent ID: 3579
Ymatebydd: Sarah John
Cadarn? Heb nodi
HG1 - KS1 Land at North West Barry:
Anyone currently travelling from Rhoose to Barry is aware of the current chaos as traffic fights to get through the Weycock Cross roundabout. A journey which should normally take no more than 10 minutes takes 40 minutes due purely to the volume of traffic. To add to this traffic would be cause even further delays, which once in place cannot be resolved.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6421
Derbyniwyd: 10/03/2026
Respondent ID: 3580
Ymatebydd: Mr Anthony John
Cadarn? Heb nodi
HG1 - KS1 Land at North West Barry
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6425
Derbyniwyd: 10/03/2026
Respondent ID: 3582
Ymatebydd: Mr Kyle John
Cadarn? Heb nodi
HG1 - KS1 Land at North West Barry:
The proposal to build 400 new homes at Weycock Cross is an ill-conceved and hasty decision on behalf of the council. The journey from Rhoose to Weycock cross should take 10 minutes, however it is currently taking 40 minutes. This is without 400 new people, and potentially 800 new cars travelling at the same time. The journey would become totally unbearable, and at present there are no ideas or feedback to suggest how this problem could be helped. With Weycock cross being one of the only ways to get to the 5 mile lane, a main road which links to the M4, this will continue to be a large cause for concern.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6453
Derbyniwyd: 11/03/2026
Respondent ID: 697
Ymatebydd: Mr Steve Thorne
Cadarn? Heb nodi
Not applicable: Unintelligent and daft question.
The existing infrastructure has reached over capacity.
The existing infrastructure was designed many decades ago and is now not fit for purpose.
The highways, drainage (foul, storm, and highway), schools, health centres, statutory services are currently under great pressure due to uncontrollable growth, reduced spending and investment and total lack of foresight.
Proposed planning applications in 2010 (200 houses) was strongly opposed and rejected due to the above issues (this current proposal involves 400 homes)
Since 2010 the west end of Vale of Glamorgan has witnessed large housing/business developments increasing strain on infrastructure. Indicating that non approval in 2010 was correct).
Other serious concerns-loss of green wedge, agricultural land, loss of environment, ecology, wildlife, countryside access/walks-overall effect on "rural" Vale of Glamorgan.
Planners/Councillors need to listen to local people who are fully aware of the of the above problems on a daily basis-and not rely on computer "modelling" from afar using inaccurate facts and figures.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6462
Derbyniwyd: 11/03/2026
Respondent ID: 3592
Ymatebydd: Nicholas and Elizabeth Martin
Cadarn? Heb nodi
Strongly object to the plan for housing at Weycock Cross. Port Road already congested. Local facilities already fully subscribed. Remarks such as "within easy walking / cycling distance of station" grossly misleading. This needs a complete rethink.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6464
Derbyniwyd: 11/03/2026
Respondent ID: 2619
Ymatebydd: Mr Christopher Edwards
Cadarn? Heb nodi
I oppose the development of around 380 homes near Weycock Cross, citing concerns about increased traffic congestion on the A4226, which already suffers during peak times and airport travel periods. I highlight that previous assessments in 2014 identified traffic flow issues that remain unresolved. Additional pedestrian crossings, drainage capacity, environmental impacts on wildlife, and the critical access to Cardiff Airport are also concerns. I believe the development would harm the area's infrastructure, environment, and access to the airport and request the Council to refuse the planning application.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6470
Derbyniwyd: 10/04/2026
Respondent ID: 2583
Ymatebydd: Mrs Cathryn Ferris
Cadarn? Heb nodi
Housing will cause increased congestion around Weycock Cross and the surrounding roads. The traffic is already backed up at peak times and this will increase with traffic from additional housing.
There will be an increase in need for GP, dentist and school places and these are currently facing capacity issues. Waiting times for doctor and dentist appointments are lengthy and will be further affected by the planned housing.
It appears that any available green or spare space is being built on, without consideration for wildlife and the detrimental impact on the environment these homes will have. There are already significant fields being built on and used around Barry for solar farms. Whilst this may be preferable to power stations or wind farms, it is still utilising green spaces and creating hostile environment for local wildlife.
The road surfaces in the Vale are atrocious and lack real investment in improving their condition on a long term basis. Increased traffic will cause further damage to an already unsuitable infrastructure. I note from the plans that the developers of the sites will be responsible for infrastructure changes around Weycock Cross to improve traffic flow, however given the lack of willingness to implement promises after building works were completed at the Waterfront development, this seems extremely unlikely to materialise and does not inspire confidence in their ability to pay other than lip service e.g. a low cost option such as another junction and set of traffic lights which will only exacerbate the traffic flow issues.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6471
Derbyniwyd: 11/03/2026
Respondent ID: 3597
Ymatebydd: Mr Gerwyn Davies
Cadarn? Heb nodi
Completely disagree due to infrastructure will not be able to cope with amount of increased traffic. Even recently with temporary traffic lights in place - where proposed new builds will be - could not cope with current level of traffic, let alone with proposed number of new households
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6476
Derbyniwyd: 11/03/2026
Respondent ID: 3600
Ymatebydd: Mrs Rowena Hughes
Cadarn? Heb nodi
I would like to voice my objection to the proposed development at Weycock Cross for the following reasons.
Road already congested with current amount of traffic, this not including the proposed 6000 daily movements suggested by the business park at Cardiff airport or the proposed developments at Rhoose and St Athan .
Proposed traffic lights to enter and exit the site will cause more traffic build up to an already dangerous roundabout.
If there was to be a major incident at Cardiff Airport, Emergency Services would be held up or not get through at all.
Destruction of a greenfield site / valuable Farm Land for building purposes.
Also loss of habitats for our wildlife
We owe it to future generations to safeguard our beautiful countryside, that we have been fortunate to grow up with
Lack of drainage facilities, current rainwater seeps into the land, if the development goes ahead this will not happen due to concrete and tarmac surfaces, where will run off go?
Overloading of existing sewage system which will increase raw sewage being deposited into what once was a beautiful coastline, which has now turned into an open cesspit and is a danger to life.
I’m sure there are brown field sites that can be utilised, in a much safer and suitable position
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6483
Derbyniwyd: 11/03/2026
Respondent ID: 2548
Ymatebydd: Mr Michael Goode
Cadarn? Heb nodi
I would like to submit my objections to the development of 376 houses at Weycock Cross in Barry!
Traffic
As someone who lives nearby on Colcot Road, we are daily facing congestion, traffic jams & poor air quality from more & more cars, lorries & commercial vehicles!
Increasing numbers of cars travelling along Port Road, and then down to the roundabout to Weycock Cross for Cardiff Airport, Llantwit Major & Rhoose, will only get worse with the addition of a large housing estate on this junction.
Drainage & Flooding
This site is prone to flooding, especially after heavy rain, which eventually runs down to Porthkerry Park.
The addition of large ponds will not be enough to contain the runoff, and these will need to be monitored & drained on a regular basis.
Green Wedge
These fields allow for a green wedge between Barry and Rhoose which is currently being developed in various places, including a new campus for Cardiff & Vale College at the Airport.
Services / Infrastructure
As a Barry resident, we are all struggling to access doctors, dentists & schools, and as a family of four we have all waited 12 years for a NHS dentist in Barry. I know that they have waiting to get into year 7 at Whitmore High School.
Biodiversity
With the removal of another green space, will mean that dormice, badgers, bats and otters will disappear from this location, which we are meant to protect & enhance.
Conclusion
I'm disappointed that this site was seen as an alternative site for 376 houses, that are in the wrong place, will cause more traffic congestion, pollution & poor air quality!
The Vale's LDP is not sustainable, unpopular and makes a mockery of the democratic process, that is biased against local residents, who actually live the areas affected!
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6485
Derbyniwyd: 11/03/2026
Respondent ID: 3498
Ymatebydd: Mrs Emily Marchant
Cadarn? Heb nodi
RLDP consultations-HG1 KS1-Land at North West Barry.
I object to the allocation of HG1 KS1 (North West Barry/Weycock Cross) on the grounds that the site is unsound, unjustified, and undeliverable.
The councils own supporting evidence, together with the developers technical reports, demonstrates that the site fails key tests relating to transport, drainage, community infrastructure.
Transport & Air Quality.
Weycock Cross is already over capacity. The RLDP transport evidence is incomplete, based on limited data and omits and air quality assessment entirely. Active travel and public transport options are weak, indirect or impractical. The site would generate significant car-dependant growth and site related congestion and pollution contrary to PPW and the Well-being Act.
Community Infrastructure.
The RLDP provides no deliverable strategy for GP capacity, social care, education or community facilities. The Council’s own Health Impact Assessments warn of negative health outcomes if development proceeds without infrastructure in place. Vague assurances of off site financial contributions have no real bearing on strategic infrastructure provision.
Drainage.
The culvert size running under the whole Nant Talwg is not identified and is already backing up during heavy rainfall. Despite all the mitigation measures, the building of such a large estate in this location is inevitably going to pose a very real risk of flooding to the houses in Nant Talwg Way. Attenuation ponds can cease to prevent discharge when prolonged rainfall or very intense rainfall occurs. These events are now more likely in future
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6489
Derbyniwyd: 11/03/2026
Respondent ID: 3606
Ymatebydd: Ms Josie Vincent-Newson
Cadarn? Ydi
Policy and Local Context
Planning Policy Wales (PPW) and TAN 20 require local development plans to consider how the scale, location, and form of growth affect the Welsh language, particularly where development could alter population balance or weaken community cohesion.
Car-Dependent Form and Limited Community Integration
HG1 KS1 is located on the outer edge of the settlement, with poor connectivity to Barry's established neighbourhoods, schools, community facilities, and Welsh language activity hubs. The site's reliance on private car travel reduces opportunities for everyday social interaction within the town.
PPW emphasises that the Welsh language is sustained through social networks, informal contact, and participation in community life. Development that functions as a highly car-dependent, semi-detached residential extension/edge-of-settlement, risks creating disconnected residential enclaves, reducing opportunities for linguistic integration and everyday use of Welsh. This is particularly relevant in Barry, where Welsh language use depends on active participation in schools, cultural groups, and community facilities, rather than incidental exposure.
Pressure on Welsh-Medium and Bilingual Education
Welsh-medium and bilingual education is one of the principal mechanisms supporting the Welsh language in the Vale of Glamorgan. Large-scale housing growth without a clear, deliverable education strategy risks placing additional pressure on existing provision.
PPW and TAN 20 both recognise the importance of aligning housing growth with education capacity and linguistic objectives. In the absence of secured school provision or clear phasing, development at HG1 KS1 could undermine efforts to sustain Welsh-medium education in Barry by increasing demand without corresponding investment, thereby weakening one of the language's key support structures.
Pressure on Community Infrastructure
PPW and TAN 20 both stress that the Welsh language is supported through schools, healthcare, community facilities, and social infrastructure. Where development proceeds ahead of infrastructure provision, pressure on schools, GP practices, and community spaces can undermine social cohesion and the ability of communities to function bilingually. The absence of a clear, deliverable infrastructure strategy therefore has indirect but material implications for linguistic sustainability.
Absence of a Barry-Specific Welsh Language Assessment
While the RLDP includes high-level consideration of the Welsh language, no site-specific assessment has been presented for HG1 KS1 that reflects Barry's particular linguistic profile. TAN 20 expects impacts to be considered proportionately and in context, recognising that even areas with lower headline percentages of Welsh speakers may still be linguistically sensitive due to reliance on specific institutions and networks. Without such analysis, the Plan fails to demonstrate how this allocation would:
- avoid adverse impacts on Welsh language use in Barry, or
- contribute positively to the Welsh Government's Cymraeg 2050 objectives.
I object to the HG1 KS1 site at North West Barry, citing its failure to meet sustainability, deliverability, and policy standards. Key concerns include landscape, Green Wedge protection, biodiversity, drainage, transport, heritage, and community infrastructure issues that remain unresolved and unmitigated. The site’s ecological value, flood risks, lack of infrastructure, and poor transport connectivity make it unsuitable for development. The Heritage Assessment is inadequate, and overall, the site conflicts with planning policies and acts. I advocate for its removal from the RLDP.