Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6361

Derbyniwyd: 10/03/2026

Respondent ID: 697

Ymatebydd: Mr Steve Thorne

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am fully aware that the existing infrastructure is overloaded and totally unable to accommodate more development, traffic, foul water disposal and so on .
The above points were the fundamental and basic reasons why planning in 2010 was refused (when only 200 houses were proposed).
Since then numerous housing developments in the west of the Vale of Glamorgan have been completed putting increased pressure on roads, schools, health care and centres, drainage disposal (foul, storm and highway) and other statutory services.
The Nant Talwg watercourse is continuously being subjected to “emergency” sewage overflow situations - the foul system and pumping station cannot handle the current increased volumes.
The current infrastructure was not designed for today’s requirements - it is outdated and unable to cope with increased traffic volumes and loadings from the additional developments .