HG1 KS1 - TIR YNG NGOGLEDD-ORLLEWIN Y BARRI

Yn dangos sylwadau a ffurflenni 1 i 30 o 312

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4459

Derbyniwyd: 02/02/2026

Respondent ID: 2792

Ymatebydd: Mrs Katie Smith

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Not enough infrastructure to support 360 families in Barry west, current traffic gridlocks to be worsened, schools overtaxed for locals.

Houses in current development too small and unfit for families, fewer gardens or green space, more realistic regulation needed.

Eradication of green space and much loved woodland, devaluing of existing homes, numerous protests make the people's thoughts clear and must be acknowledged.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4479

Derbyniwyd: 04/02/2026

Respondent ID: 2566

Ymatebydd: Mr Tim Gordon

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

This is a silly question. None.

Crynodeb o'r Gynrychiolaeth:

The infrastructure will not support this development.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4494

Derbyniwyd: 05/02/2026

Respondent ID: 2821

Ymatebydd: Mr Simon Parker

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

That is irrelevant.

Crynodeb o'r Gynrychiolaeth:

Current traffic situation at Weycock cross and the road between Rhoose and Barry is ALREADY terrible. Additional traffic from any more housing BEFORE significant changes to both the road and roundabout CANNOT be allowed to go ahead. The road and roundabout MUST be upgraded first.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4552

Derbyniwyd: 10/02/2026

Respondent ID: 2851

Ymatebydd: Mr Rhys Williams

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Absolutely none 10% of people of people speak Welsh and the majority of those are from west & Mid Wales. What about the English speakers who pay massive majority of cost for all the Welsh signs!

Crynodeb o'r Gynrychiolaeth:

There are Barn Owls and kestrel’s using those fields, both of which need support as numbers are decreasing and are protected species.
The infrastructure is terrible on Port Road with all the new traffic from the massive Rhoose estates. There are plenty of brown field sites in Barry to use before destroying the Countryside.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4588

Derbyniwyd: 11/02/2026

Respondent ID: 2683

Ymatebydd: Mr David Barton

Effeithiau ar y Gymraeg:

-

Crynodeb o'r Gynrychiolaeth:

Utilise Traditional Architecture Design Codes for all new construction.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4670

Derbyniwyd: 13/02/2026

Respondent ID: 2578

Ymatebydd: Mr Tim Griffiths

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

Items 9 and 10 on the list for Policy SSC1 are contradictory to achievements needed for Weycock Cross development. The development will impact upon amenity and character of the locality in being more noisy, more polluted and higher volume of traffic.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4671

Derbyniwyd: 13/02/2026

Respondent ID: 2578

Ymatebydd: Mr Tim Griffiths

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

The access to the Weycock Cross was one of the reasons for rejection 10 years ago. The plan is no different from before for safety, especially with the current levels of traffic

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4672

Derbyniwyd: 13/02/2026

Respondent ID: 2578

Ymatebydd: Mr Tim Griffiths

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

Too many houses for the location leading to safe access on and off the development

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4673

Derbyniwyd: 13/02/2026

Respondent ID: 2578

Ymatebydd: Mr Tim Griffiths

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

The Weycock cross development puts more pressure on access for doctors/ dentists in the area

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4675

Derbyniwyd: 13/02/2026

Respondent ID: 2578

Ymatebydd: Mr Tim Griffiths

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

This site was rejected 10 years ago for various reasons for 250 houses. Those reasons have never been addressed. So traffic volume has increased. pollution has increased and noise levels have increased to name a few. So to propose nearly 400 houses on the same site is crazy. This location is totally unsuitable for a development of this size

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4688

Derbyniwyd: 15/02/2026

Respondent ID: 920

Ymatebydd: Professor Andrew Vincent

Effeithiau ar y Gymraeg:

The Weycock Cross site should be dropped from the plan

Crynodeb o'r Gynrychiolaeth:

For the last 70 years the the Weycock cross site has been well-utilised farmland (arable and livestock) and has been designated previously as Green wedge (and a countryside boundary to Barry). The current plan intentionally moves beyond the existing Barry settlement boundaries and builds into open vibrant countryside. In a time of countrywide environmental crisis and the loss of green habitat such a development appears both cavalier and irresponsible. In other words it is a form of environmental vandalism seemingly to fill up an administrative quota for housing.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4715

Derbyniwyd: 16/02/2026

Respondent ID: 920

Ymatebydd: Professor Andrew Vincent

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The Green wedge which is being "built over" by the NW Barry proposal is a deeply loved visual amenity and green infrastructure asset

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4726

Derbyniwyd: 18/02/2026

Respondent ID: 2657

Ymatebydd: Mrs Mary Vincent

Crynodeb o'r Gynrychiolaeth:

I can only assume the decision to 'amend' ie decrease the NW Barry Green Wedge is a to fulfill a 'quota' for housing, despite compelling arguments against it in terms of traffic increase and chaos. The front of our homes already suffer from loud noise and pollution. Now the council sees fit to take away what quiet we have at the back. They will also be taking away the songs of the skylarks (red-listed endangered birds) that nest each year behind us. Were these identified by your environmental survey? If not, then it is not fit for purpose.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4773

Derbyniwyd: 22/02/2026

Respondent ID: 2650

Ymatebydd: Mrs Deborah Bobbett

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

I don't know

Crynodeb o'r Gynrychiolaeth:

There's no infrastructure in place. The roads in this area can't cope with any more traffic. There's accidents all the time. No room at locale schools doctors can't cope. And it's all a strain on people's mental health. The traffic is so bad. You can't even cross the road or pull if my drive.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4789

Derbyniwyd: 23/02/2026

Respondent ID: 2949

Ymatebydd: Mrs Joanna Phillips

Crynodeb o'r Gynrychiolaeth:

The traffic in this area is already extremely congested . Without substantial improvements to public transport, and community facilities building more residential properties would make existing congestion even worse as home owners will be reliant on cars for schools, drs, shopping etc.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4809

Derbyniwyd: 21/02/2026

Respondent ID: 2528

Ymatebydd: Mr LP Lazarou

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed development at North West Barry, Waycock Cross, due to its impact on traffic congestion, safety, and local infrastructure. The proposed new traffic light system is insufficient to handle increased traffic from over 1000 new houses proposed across the Vale. A cycle path and footpath between Waycock and Rhoose is needed. I highlight the strain on local services such as healthcare and schools, the misleading label of "affordable" housing, and the threat to protected ecosystems and wildlife, including rare bats and birds. I oppose building on green land, emphasising its ecological importance and the risk of damaging protected areas like the SSSI. I urge a reconsideration of this development or mitigation of these issues to protect the environment and community wellbeing.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4817

Derbyniwyd: 22/02/2026

Respondent ID: 2966

Ymatebydd: Alan B Luen

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I object to this proposal on health grounds.
Twice a day traffic queues up to one mile on the Rhoose Road and half a mile on each of the other three roads trying to access the roundabout with several hundred engines idling. The fumes are dreadful and should be monitored. Add to this up to 150 cars on the proposed development.
The Welsh Government have all types of targets for clean air. This would be contrary to Government policy.
Would love to see your comments on the above.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4847

Derbyniwyd: 24/02/2026

Respondent ID: 2573

Ymatebydd: Jane Buckland

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

As a welsh speaker myself I do not think this will enhance the language at all as the welsh schools are full & the only 2 schools in this vicinity are Ysgol Bro Morgannwg & Ysgol Sant Baruc at the waterfront. These schools are not within walking distance & therefore strengthen my case of more vehicles on the road.

Crynodeb o'r Gynrychiolaeth:

The traffic inthis area is gridlocked at present so a further 376 homes would only exassipate the situation,meaning residents of Rhoose & Barry becoming more frustrated at any further delays.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4876

Derbyniwyd: 23/02/2026

Respondent ID: 2663

Ymatebydd: Mr David Holloman

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

The site is beyond walking distance of "Welsh" schools in the area.

Crynodeb o'r Gynrychiolaeth:

I believe the Deposit RLDP should be amended to exclude the land at North-west Barry for the following reasons.
Traffic- This site is not within walking distance of the station which will lead too excessive traffic from the site and possible isolation of non driving residents
Water and sewage- There is a danger of sewage entering the Millwood stream. The proposed ponds may have limited capacity and could attract insects and could be hazardous.
Land Use- This is actively formed land with countryside habitats such as foxes and bats. Has a at survey been commissioned? This proposal breaks the green wedge which is a fundamental step too far.
Previous Applications- The 2014 findings were "development of this site would be detrimental to the capacity and three flow of traffic on this strategically important. A4226 which links directly to Cardiff airport."
Pedestrian Safety- There will be a need for a zebra crossing at the end of Pontypridd Rd by the garage. Bus laybys will need to be constructed for the bus stops by the Cwm Ciddy.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4878

Derbyniwyd: 25/02/2026

Respondent ID: 3001

Ymatebydd: Miss Isobel Govier

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I work in barry the traffic is already ridiculous, its a major disruption. the road cant cope with the number of road users as its the ONLY road from Barry to Rhoose. i start work at 8:15, what should be a 15 minute drive already takes 35 minutes on a good day. I dont see how the work will be done without causing further disruption. This plan is just adding to an already problematic area, where the roundabout gets backed up. it would not be a safe road for the children to be walking to local schools.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4894

Derbyniwyd: 25/02/2026

Respondent ID: 3006

Ymatebydd: Jordan Mountford

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I strongly object to the proposed development of 376 homes at Weycock Cross, Barry, especially considering the additional 1,500 dwellings planned nearby. I believe this scale of growth will severely impact highway capacity, worsen traffic congestion, and increase flood risks by reducing natural drainage. It will strain local health, education, and emergency services and lead to the loss of green spaces and biodiversity. I urge refusal unless comprehensive, enforceable mitigation measures are secured to ensure sustainable development and protect community well-being and the environment.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4922

Derbyniwyd: 26/02/2026

Respondent ID: 2791

Ymatebydd: Mrs Ruth Zeraschi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This is so short sighted. A previous development,with 100 houses less was turned down approximately 10 years ago due to a lack of infrastructure and the impact on the area. So, why are The Vale Council considering the development again? Since then, Barry, Rhoose, St Athan and all wider areas have been massively developed, resulting in gridlock every day. Add to this, the current development of 2 campuses, 1 on Barry Waterfront and the other by Cardiff Airport. There is also apparently a plan to build warehouses attached to the airport, which is going to increase traffic again.
Planning?

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4941

Derbyniwyd: 27/02/2026

Respondent ID: 3027

Ymatebydd: Mrs Tracey Govier

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This is the only safe main road into Barry from Rhoose, or to access the 5 mile lane. The adjustment to the lanes using the left hand lane only for the 5 mile lane has caused huge congestion. If there are any incidents it causes congestion that brings the whole traffic system to stop in and around Barry. Public transport is not an option for daily life in the rural areas that will be affected most. The people that are proposing do not live or use this route several times a day. This affects jobs, appointments and lives. NOT SAFE.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4947

Derbyniwyd: 27/02/2026

Respondent ID: 2595

Ymatebydd: Mrs J Davis

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Weycock Cross proposed housing development on green land. Proposed construction of a third lane and access.

Please refer to the land registry evidence. The service road in front of my house is a private one. This was purchased via Herbert Builders when the houses were built. The land extends to the pavement area and the main road (Pontypridd Road). The council do not own this service road. (I have the written deeds and written evidence).
There is no public transport serving Pontypridd Road.
Access to site will cause major traffic congestion.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4948

Derbyniwyd: 27/02/2026

Respondent ID: 3033

Ymatebydd: Mrs Lynette Griffin

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am writing to formally object to the proposed housing development near Waycock Cross, Barry.

I have many concerns regarding this development, my primary concerns relate to the already significant traffic congestion at this junction. During peak morning and evening rush hours the junction is operating at or beyond its capacity. Queues regularly build up on the approach roads particularly the five-mile lane and Port road which are causing delays, increased vehicle idling and heightened safety risks for motorists and more importantly pedestrians and I question when or if a satisfactory traffic survey has taken place? if so, have members of the planning committee visited the site at peak times to witness the issue.

Given the existing conditions and restraints of the current infrastructure I question whether sufficient consideration has been given to the additional traffic that a new development will inevitably generate, even as suggested it is only 400 homes that are built, at 1.5 cars per house that would generate an additional 600 vehicles using one roundabout given that the development will only have one entry/exit point there would need to be a substantial and clearly defined infrastructure improvement, it is currently difficult to see how a couple of traffic lights added to the roundabout will see the area safely and efficiently accommodate this increase in vehicular traffic.

There is also a wider strategic concern which | fear has either not been taken into consideration or has been totally ignored, The Welsh Government own and has publicly committed to growing passenger numbers at Cardiff airport as part of its economic development strategy. Access to the airport is a critical factor in achieving this objective, given the access spur from the M4 was never built, and public transport links are at best sporadic, if traffic congestion at Weycock Cross is allowed to worsen as it is the primary access to the airport, journey times to and from the airport will become less reliable and potentially longer, discouraging travellers and undermining efforts to increase passenger numbers and potential impacting jobs as carriers are discouraged from using Cardiff. Its is difficult to reconcile the approval of a development that would add significant traffic pressure with the stated aim of improving connectivity and supporting the airport's growth.

In additional to traffic concerns and road safety, I am deeply worried about the strain that a development of this scale would place on local public services. The schools arealready under pressure with the local primary school, Romilly currently oversubscribed and with no doubt additional families moving into this development this will significantly increase demand for school places. Similarly, GP surgeries, dental practices and other healthcare services are operating at or near capacity, with residents already experiencing difficulties in securing appointments. We have a privileged position and can afford private dental and health care, that said we are fully aware that our local dental practice does not accept NHS patients, what is the plan for these additional residents or is it something that the planning committee has not considered?

It is essential that the committee demonstrates how the existing infrastructure, including education and healthcare will be expanded and funded to meet the increased demand, given the local authorities lack of a track record in forcing developers to ensure their obligations are met with regard to public services, I use the development near Asda as an example of the developers apathy to their responsibilities, firm guarantees of investment and capacity planning are required as there is a real risk that both new and existing residents will experience yet another decline in access to essential services.

I respectfully request that the committee provide clear evidence of a comprehensive traffic and infrastructure impact assessment along with detailed mitigation proposals and not just a wish list of nice to haves, before proceeding with this application. In the absence of such assurances as there were with the initial 2015 planning request, I strongly urge the committee to reconsider or refuse the proposal in its current form.

Thank you for your time and careful consideration of these concerns. I trust that the long-term wellbeing of the community, the sustainability of local infrastructure and alignment with wider strategic objectives will be given the priority they deserve.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4949

Derbyniwyd: 27/02/2026

Respondent ID: 3034

Ymatebydd: Miss Matilda Griffin

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am writing to formally object to the proposed housing development near Waycock Cross, Barry.

I have many concerns regarding this development, my primary concerns relate to the already significant traffic congestion at this junction. During peak morning and evening rush hours the junction is operating at or beyond its capacity. Queues regularly build up on the approach roads particularly the five-mile lane and Port road which are causing delays, increased vehicle idling and heightened safety risks for motorists and more importantly pedestrians and I question when or if a satisfactory traffic survey has taken place? if so, have members of the planning committee visited the site at peak times to witness the issue.

Given the existing conditions and restraints of the current infrastructure I question whether sufficient consideration has been given to the additional traffic that a new development will inevitably generate, even as suggested it is only 400 homes that are built, at 1.5 cars per house that would generate an additional 600 vehicles using one roundabout given that the development will only have one entry/exit point there would need to be a substantial and clearly defined infrastructure improvement, it is currently difficult to see how a couple of traffic lights added to the roundabout will see the area safely and efficiently accommodate this increase in vehicular traffic.

There is also a wider strategic concern which I fear has either not been taken into consideration or has been totally ignored, The Welsh Government own and has publicly committed to growing passenger numbers at Cardiff airport as part of its economic development strategy. Access to the airport is a critical factor in achieving this objective, given the access spur from the M4 was never built, and public transport links are at best sporadic, if traffic congestion at Weycock Cross is allowed to worsen as it is the primary access to the airport, journey times to and from the airport will become less reliable and potentially longer, discouraging travellers and undermining efforts to increase passenger numbers and potential impacting jobs as carriers are discouraged from using Cardiff. Its is difficult to reconcile the approval of a development that would add significant traffic pressure with the stated aim of improving connectivity and supporting the airport's growth.

In additional to traffic concerns and road safety, I am deeply worried about the strain that a development of this scale would place on local public services. The schools are already under pressure with the local primary school, Romilly currently oversubscribed and with no doubt additional families moving into this development this will significantly increase demand for school places. Similarly, GP surgeries, dental practices and other healthcare services are operating at or near capacity, with residents already experiencing difficulties in securing appointments. We have a privileged position and can afford private dental and health care, that said we are fully aware that our local dental practice does not accept NHS patients, what is the plan for these additional residents or is it something that the planning committee has not considered?

It is essential that the committee demonstrates how the existing infrastructure, including education and healthcare will be expanded and funded to meet the increased demand, given the local authorities lack of a track record in forcing developers to ensure their obligations are met with regard to public services, I use the development near Asda as an example of the developers apathy to their responsibilities, firm guarantees of investment and capacity planning are required as there is a real risk that both new and existing residents will experience yet another decline in access to essential services.

I respectfully request that the committee provide clear evidence of a comprehensive traffic and infrastructure impact assessment along with detailed mitigation proposals and not just a wish list of nice to haves, before proceeding with this application. In the absence of such assurances as there were with the initial 2015 planning request, I strongly urge the committee to reconsider or refuse the proposal in its current form.

Thank you for your time and careful consideration of these concerns. I trust that the long-term wellbeing of the community, the sustainability of local infrastructure and alignment with wider strategic objectives will be given the priority they deserve.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4950

Derbyniwyd: 27/02/2026

Respondent ID: 3035

Ymatebydd: Mr Mathew Griffin

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am writing to formally object to the proposed housing development near Waycock Cross, Barry.

I have many concerns regarding this development, my primary concerns relate to the already significant traffic congestion at this junction. During peak morning and evening rush hours the junction is operating at or beyond its capacity. Queues regularly build up on the approach roads particularly the five-mile lane and Port road which are causing delays, increased vehicle idling and heightened safety risks for motorists and more importantly pedestrians and I question when or if a satisfactory traffic survey has taken place? if so, have members of the planning committee visited the site at peak times to witness the issue.

Given the existing conditions and restraints of the current infrastructure I question whether sufficient consideration has been given to the additional traffic that a new development will inevitably generate, even as suggested it is only 400 homes that are built, at 1.5 cars per house that would generate an additional 600 vehicles using one roundabout given that the development will only have one entry/exit point there would need to be a substantial and clearly defined infrastructure improvement, it is currently difficult to see how a couple of traffic lights added to the roundabout will see the area safely and efficiently accommodate this increase in vehicular traffic.

There is also a wider strategic concern which I fear has either not been taken into consideration or has been totally ignored, The Welsh Government own and has publicly committed to growing passenger numbers at Cardiff airport as part of its economic development strategy. Access to the airport is a critical factor in achieving this objective, given the access spur from the M4 was never built, and public transport links are at best sporadic, if traffic congestion at Weycock Cross is allowed to worsen as it is the primary access to the airport, journey times to and from the airport will become less reliable and potentially longer, discouraging travellers and undermining efforts to increase passenger numbers and potential impacting jobs as carriers are discouraged from using Cardiff. Its is difficult to reconcile the approval of a development that would add significant traffic pressure with the stated aim of improving connectivity and supporting the airport's growth.

In additional to traffic concerns and road safety, I am deeply worried about the strain that a development of this scale would place on local public services. The schools are already under pressure with the local primary school, Romilly currently oversubscribed and with no doubt additional families moving into this development this will significantly increase demand for school places. Similarly, GP surgeries, dental practices and other healthcare services are operating at or near capacity, with residents already experiencing difficulties in securing appointments. We have a privileged position and can afford private dental and health care, that said we are fully aware that our local dental practice does not accept NHS patients, what is the plan for these additional residents or is it something that the planning committee has not considered?

It is essential that the committee demonstrates how the existing infrastructure, including education and healthcare will be expanded and funded to meet the increased demand, given the local authorities lack of a track record in forcing developers to ensure their obligations are met with regard to public services, I use the development near Asda as an example of the developers apathy to their responsibilities, firm guarantees of investment and capacity planning are required as there is a real risk that both new and existing residents will experience yet another decline in access to essential services.

I respectfully request that the committee provide clear evidence of a comprehensive traffic and infrastructure impact assessment along with detailed mitigation proposals and not just a wish list of nice to haves, before proceeding with this application. In the absence of such assurances as there were with the initial 2015 planning request, I strongly urge the committee to reconsider or refuse the proposal in its current form.

Thank you for your time and careful consideration of these concerns. I trust that the long-term wellbeing of the community, the sustainability of local infrastructure and alignment with wider strategic objectives will be given the priority they deserve.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4952

Derbyniwyd: 27/02/2026

Respondent ID: 3036

Ymatebydd: Miss Ellie Griffin

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I am writing to formally object to the proposed housing development near Waycock Cross, Barry.

I have many concerns regarding this development, my primary concerns relate to the already significant traffic congestion at this junction. During peak morning and evening rush hours the junction is operating at or beyond its capacity. Queues regularly build up on the approach roads particularly the five-mile lane and Port road which are causing delays, increased vehicle idling and heightened safety risks for motorists and more importantly pedestrians and I question when or if a satisfactory traffic survey has taken place? if so, have members of the planning committee visited the site at peak times to witness the issue.

Given the existing conditions and restraints of the current infrastructure I question whether sufficient consideration has been given to the additional traffic that a new development will inevitably generate, even as suggested it is only 400 homes that are built, at 1.5 cars per house that would generate an additional 600 vehicles using one roundabout given that the development will only have one entry/exit point there would need to be a substantial and clearly defined infrastructure improvement, it is currently difficult to see how a couple of traffic lights added to the roundabout will see the area safely and efficiently accommodate this increase in vehicular traffic.

There is also a wider strategic concern which I fear has either not been taken into consideration or has been totally ignored, The Welsh Government own and has publicly committed to growing passenger numbers at Cardiff airport as part of its economic development strategy. Access to the airport is a critical factor in achieving this objective, given the access spur from the M4 was never built, and public transport links are at best sporadic, if traffic congestion at Weycock Cross is allowed to worsen as it is the primary access to the airport, journey times to and from the airport will become less reliable and potentially longer, discouraging travellers and undermining efforts to increase passenger numbers and potential impacting jobs as carriers are discouraged from using Cardiff. Its is difficult to reconcile the approval of a development that would add significant traffic pressure with the stated aim of improving connectivity and supporting the airport's growth.

In additional to traffic concerns and road safety, I am deeply worried about the strain that a development of this scale would place on local public services. The schools are already under pressure with the local primary school, Romilly currently oversubscribed and with no doubt additional families moving into this development this will significantly increase demand for school places. Similarly, GP surgeries, dental practices and other healthcare services are operating at or near capacity, with residents already experiencing difficulties in securing appointments. We have a privileged position and can afford private dental and health care, that said we are fully aware that our local dental practice does not accept NHS patients, what is the plan for these additional residents or is it something that the planning committee has not considered?

It is essential that the committee demonstrates how the existing infrastructure, including education and healthcare will be expanded and funded to meet the increased demand, given the local authorities lack of a track record in forcing developers to ensure their obligations are met with regard to public services, I use the development near Asda as an example of the developers apathy to their responsibilities, firm guarantees of investment and capacity planning are required as there is a real risk that both new and existing residents will experience yet another decline in access to essential services.

I respectfully request that the committee provide clear evidence of a comprehensive traffic and infrastructure impact assessment along with detailed mitigation proposals and not just a wish list of nice to haves, before proceeding with this application. In the absence of such assurances as there were with the initial 2015 planning request, I strongly urge the committee to reconsider or refuse the proposal in its current form.

Thank you for your time and careful consideration of these concerns. I trust that the long-term wellbeing of the community, the sustainability of local infrastructure and alignment with wider strategic objectives will be given the priority they deserve.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4963

Derbyniwyd: 27/02/2026

Respondent ID: 3041

Ymatebydd: Vanda Cattle

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Pontypridd and port road already grid locked, without the Rhoose roads
No intrastructure
No doctors
No hospitals
No school, nurseries.
Building on green land
Flood plain and the option is lakes, what

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4964

Derbyniwyd: 27/02/2026

Respondent ID: 3041

Ymatebydd: Vanda Cattle

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Absolutely ridiculous, infrastructure already grid locked