SP6 - GOFYNIAD TAI

Yn dangos sylwadau a ffurflenni 1 i 27 o 27

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4585

Derbyniwyd: 11/02/2026

Respondent ID: 2683

Ymatebydd: Mr David Barton

Effeithiau ar y Gymraeg:

-

Crynodeb o'r Gynrychiolaeth:

Traditional Architecture will overcome challenges with housing quotas significantly if done authentically.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4802

Derbyniwyd: 16/02/2026

Respondent ID: 1874

Ymatebydd: Cwmpas

Asiant : Cwmpas

Crynodeb o'r Gynrychiolaeth:

The addition of a specific reference to community led housing within Policies HG1, HG2, HG3 akin to that within HG5 would enable to the benefits and reach of community led housing to be expanded into mainstream housing policies and allocations and not only Exceptions Policy.

Our comments and observations are such as to suggest that references could be further extended within the Housing policies and still be in accordance with the framework of PPW Edition 12, key to the evolution of these policies.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4977

Derbyniwyd: 28/02/2026

Respondent ID: 2653

Ymatebydd: Emma Reed

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Detrimental to put more housing where access to education in the form of welsh medium is unavailable without significantly travelling.

Crynodeb o'r Gynrychiolaeth:

Rhoose a small settlement without major infrastructure is taking some 10 percent of the housing requirement with permissions outstanding at Rhoose Point and the new proposed development at Readers Way. This is a village which should not be taking such a high percentage of development when places like Llantwit Major Cowbridge and Penarth are taking virtually nothing in comparison.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5117

Derbyniwyd: 04/03/2026

Respondent ID: 2386

Ymatebydd: Welsh Government (Planning Division)

Crynodeb o'r Gynrychiolaeth:

The Level of Growth - Homes and Jobs
The Deposit Plan (Policy SP1 & SP6) makes provision for 8,660 homes to deliver a housing requirement of 7,890 new homes (526 p/a) over the plan period 2021-2036, of which a minimum of 3,070 homes will be affordable. The flexibility allowance proposed by the Council is 9.8%. The delivery of new jobs is for 5,388 over the plan period (Policy SP14).

Homes: The 2018 WG Principal Projection results in a requirement of 431 units p/a, or 6,465 units over the plan period. The housing growth proposed in the plan (requirement) is around +1,425 units (22%) above the WG 2018 principal projection, the provision being +2,195 (34%) above. The Council consider the 10 year average housing completions to represent a more realistic level of growth to deliver the key issues the plan is seeking to address. The Council considers that a lower level of growth (2018 projection) is not appropriate because the projections do not take account of any policy decisions and were prepared in advance of the Covid-19 pandemic with implications for migration patterns and fewer jobs proposed.

BP8A (November 2025) considers the latest 2022 Welsh Government population and housing projections, noting they are higher than the 2018 based projections. The projections for the Vale of Glamorgan show significant variation in internal migration in particular which the Council considers should be treated with caution. The projections are trend based and are affected by specific factors that may have occurred within the previous 5 years. The 5 years in question included a period of high housebuilding associated with a newly adopted LDP, as well as the Covid 19 pandemic, where many students returned to home from term-time addresses and re-registered with GPs in the Vale.

Given the fluctuation in recent migration figures, the Council consider longer-term trends are more appropriate, and it is noted that the population change identified in the 10-year migration variant is of a similar level to that proposed under the RLDP projection. In conclusion, for the reasons identified above, despite the updated projections, the Council considers the RLDP housing requirement continues to represent a robust basis to deliver a sustainable and deliverable level of growth over the plan period. The Welsh Government does not object to the scale of housing contained within the plan.

The demographic evidence (February 2023, Edge Analytics) tested 12 growth scenarios comprising: demographic-led, dwelling-led, and employment-led scenarios. The preferred housing requirement is based on a 10-year dwelling-led scenario (526 dpa) that would result in a population growth of 9.7% over the plan period with an annual net in-migration of 1,009 persons. The Council considers this level of housing growth is deliverable with a large proportion met through existing commitments (51%) and a jobs total (4,875 jobs) that broadly aligns with the level of new jobs forecast in the Employment Land Study (5,338 jobs). Moreover, the scale of growth is considered by the Council to be compatible with Future Wales and the role the authority plays within the wider southeast region. With inward migration to the Vale of Glamorgan from Cardiff expected to slow as Cardiff’s strategic sites deliver higher levels of housing and with employment opportunities in the Vale co-located with housing sites, there are further opportunities to reduce the high levels of out-commuting into Cardiff. Overall, this approach is proposed by the Council to deliver a level of growth that is balanced with the emerging Cardiff LDP and wider southeast region. The Welsh Government does not object to the level of growth proposed in the plan.

We note that historic completion rates in the Vale of Glamorgan have fluctuated considerably over recent years. The past 10-year (2011-2021) average completion rate is 526 dwellings p/a. This has been exceeded over the last 5-years (2016-2021) with 698 dwellings constructed p/a. Build rates in recent years are in part attributed to the delivery of the current adopted LDP strategy that has more of a ‘rural settlement' focus, with multiple sites across many settlements being built out. Replicating this approach going forward (10,470 dwellings) would not comply with FW/PPW in terms of sustainable development and transport, potentially adversely impacting on Cardiff’s growth strategy. On this basis, the Council considers that achieving 526 dwellings p/a in the preferred 10-year dwelling-led scenario is sustainable and deliverable and would provide a level of job growth (5,338 jobs) that is balanced with the housing requirement. The Welsh Government does not object to the level of housing proposed in the plan but demonstrating delivery of the key housing sites will be essential.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5455

Derbyniwyd: 09/03/2026

Respondent ID: 3264

Ymatebydd: Mr David Entwistle

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The housing requirement stated by the plan seems unsustainable and unrealistic. If only two if the key sites were to fall through the the amount of houses supposedly required cannot be reached. The figures around required housing for a start are questionable. Migration from outside the Vale taking up housing stock needs to be addressed. Priority should be given to the well being and daily lives of existing residents first and foremost and housing for people born within the Vale.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5633

Derbyniwyd: 09/03/2026

Respondent ID: 3322

Ymatebydd: Mrs Karine Dubois-Jones

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

none

Crynodeb o'r Gynrychiolaeth:

Where do those figures come from? Aren't they over estimated for the Vale?
Many houses have been built in the last few years but the infrastructure has NOT been improved, especially the transport system and the medical centre under much pressure as it is. Driving around the Vale and into Cardiff is becoming a nightmare and causing much stress to workers ( not everyone works from home!!) and families.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5940

Derbyniwyd: 11/03/2026

Respondent ID: 538

Ymatebydd: HBF

Cadarn? Ydi

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

The housing requirement and the number of homes delivered through new allocations should be increased to make the plan more ambitious and align with Future Wales and the Vales' identified role as a national growth area.

The flexibility allowance should be increased to 15%. The Development Plan Manual 3 suggests 10% should be the starting point. A higher figure is considered appropriate due to the low level of new allocations and the limited number of key sites allocated in the plan. This means the plan has a heavy reliance on a small number of sites, which would suggest the need for greater flexibility provided through a range of additional smaller sites.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6018

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Even with this 9.8% flexibility allowance in place, 8,660 is still 10.0% lower than the predicted household increase of 9,623 in the Vale of Glamorgan based on Welsh Government’s 2022-based household projections for VoG over the RLDP period.

BDWR endorses the incorporation of a flexibility allowance, as is required by paragraph 5.59 of the Development Plans Manual (2020). However, it is considered that the flexibility allowance needs to be increased to a minimum of 15-20% (like Monmouthshire and Swansea respectively) to ensure that the ambitious anticipated annual build rate of between 885-906 dpa from 2027/28 to 2030/31 can be achieved.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6050

Derbyniwyd: 09/03/2026

Respondent ID: 654

Ymatebydd: Mrs Gill Sims-Williams

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

RHOOSE READERS WAY:
Policy SP6- Rhoose seeing high order settlements than any other Vale Village. Object strongly to the massive amount of houses planned for readers way.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6054

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

The RLDP's proposed housing target of 526 dwellings per year over ten years is unambitious, as recent delivery exceeded this figure outside pandemic years. The target is based on past averages, which include periods of low delivery, and ignores demographic trends and unmet needs. Given the Vale of Glamorgan's role within the National Growth Area in Future Wales, maintaining historic delivery rates does not reflect its strategic importance or the national policy emphasis on growth, making the current target insufficient and not aligned with its designated growth role.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6057

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy SP1's target of 7,890 dwellings, including 3,070 affordable homes, is insufficient to meet current and projected housing needs in VoG, which are estimated to require over 10,000 dwellings to address demographic growth and backlog unmet needs. The proposed flexibility allowance of 9.8% should be increased to 15-20% (like in Monmouthshire and Swansea) to achieve the ambitious build rate set out in the Housing Trajectory. Policy SP1 does not adequately account for the actual demand, particularly for affordable housing, which is significantly under-provided relative to identified needs.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6060

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy SP6 plans for 8,660 homes comprising a 9.8% flexibility allowance on a target of 7,890. This should be increased to 15-20% (like in Monmouthshire and Swansea) to meet the ambitious build rate set out in the Housing Trajectory. Household projections indicate a 22% increase from 57,676 to 67,299 by 2036, requiring approximately 10,008 dwellings, which exceeds the current target in the RLDP. Policy SP1 and SP6 do not sufficiently address unmet affordable housing needs as the 2023 LHMA identifies a need for 1,075 affordable dpa over the next 5-years based on principal projections or 1,114 based on RLDP projections.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6619

Derbyniwyd: 26/02/2026

Respondent ID: 694

Ymatebydd: South Wales Police – Secured by Design Officer

Crynodeb o'r Gynrychiolaeth:

Ensure early consultation with the Designing Out Crime Officer and to achieve Secured by Design on all new developments and refurbishments.

All Welsh Government funded homes MUST meet secured by Design Gold or in the case of a refurbishment Silver. Consultation with the Designing Out crime Officer should take place at the pre planning stage when an application for Secured by Design should also be made.
Where a change of use/ mixed use retail, community leisure and active travel routes are planned Secured by Design Residential and Commercial guides should be applied. Early consultation with Designing out crime officers particularly in the Town Centres is recommended.
Designing Out Crime Officers should be consulted at the concept stage of a development, where there are 10 or more housing units and in the case of commercial space 1000 square metres.
South Wales Police Designing Out Crime Officers to work in partnership with the Vale of Glamorgan Council Planning Department to compile a specific planning guidance in relation to Houses of multiple occupancy.
South Wales Police would ask that all flats/ apartments’ conversions meet WDQR (Welsh Design Quality Standards) and achieve at least a Secured by Design silver award.
In the case of the change of use of residential land or properties, South Wales Police would ask that any change of use application is sent to South Wales Police Designing out crime officers.
South Wales Police are involved in discussion with the Vale of Glamorgan Planning Department and the compilation of Specific planning guidance to cover co-living and similar shared facility developments.
Where co- living developments are proposed to deliver a balanced housing mix. South Wales Police would ask that the pre planning discussions take place with the Designing Out Crime officer and that the development is built to Secured by Design standards as set out in the most current Secured by Design Residential Guide.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6701

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Asbri Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Overall Growth Levels (Policy SP6)

It is acknowledged that the preferred growth option (dwelling-led 10 Year scenario), upon which the RLDP housing requirement figure is based, reflects what has been delivered in the Authority in recent years, and is considered by the Authority to be realistic and suitably ambitious given the Vale's position within the National Growth Area. However, as a general comment, it is considered that targeting a higher/more ambitious growth rate would be appropriate.

In reviewing the most recent LDP Annual Monitoring Report (Vale of Glamorgan LDP 2011-2026, 7th Annual Monitoring Report, 1st April 202431st March 2025) (published October 2025), it is clear that there is a shortfall in housing delivery in the Vale of Glamorgan. It is stated that: “Between 1st April 2011 and 1st April 2025, a total of 6,999 dwellings were completed within the Vale of Glamorgan of which 4,641 units were general market dwellings against the 2025 AMR target of 6,387 that should have been developed at this point in the plan period, in accordance with the target. The number of additional general market dwellings delivered is 27.3% below the monitoring target”. In light of the fact that there is a significant shortfall in housing delivery (i.e.
currently 27.3% lower than the LDP target), it is considered that a higher growth level for the Replacement Plan period would assist in rectifying under-delivery, allowing for housing completions to be better aligned with evidence of need (rather than repeating past shortfalls).


On February 12th 2026, the Welsh Government published updated estimates of additional housing need in Wales. The figures replace the 2019-based estimates and draw on the latest available data, including the 2022-based household projections published in late 2025. In summary, Welsh Government identify that there is a current estimated existing unmet need of 9,400 housing units. Estimates of existing unmet need have increased by 64% since the 2019-based estimates, due to a rise in homeless households in temporary accommodation.

In terms of future housing need, on average, between 7,800 and 9,300 additional housing units are estimated to be needed annually over the five-year period from July 2025 to June 2030, with a central estimate of 8,700 from newly arising need. The estimated newly arising need for July 2025 to June 2030 is higher than in the 2019-based estimates. This increase reflects higher projected household growth in the 2022-based household projections compared with the 2018-based projections used previously.

The Authority will need to give detailed consideration to the implications of the updated estimates of housing need. As the most up to date projections, the Replacement LDP must properly account for the new dataset to ensure soundness of the plan. In this regard, it is stated at Paragraph 5.34 of the Development Plans Manual that “In terms of considering the level of housing provision for a plan, the most up-to- date suite of Welsh Government population and Household Projections are a fundamental
part of the evidence base.” Accordingly, Paragraph 5.35 goes on to state that “All LPAs should use these projections and the resultant household numbers when considering the level of housing provision for a plan period”.

In light of the February 2026 publication of updated estimates of housing need in Wales (which indicate
a substantial increase in both existing unmet housing need and newly arising need), and in the context of the existing under-delivery of units evidenced within the most recent LDP AMR (i.e. which identifies a shortfall in housing delivery of 27.3% on the adopted LDP target), it is considered essential that the overall growth levels for the Replacement Plan are revisited (and increased accordingly).

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6738

Derbyniwyd: 10/03/2026

Respondent ID: 854

Ymatebydd: Hallam Land Management

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

Hallam are generally supportive of the aims of this policy. The housing requirement should reasonably be seen as the minimum number of homes that the RLDP should be aiming to deliver.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6766

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Boyer Planning

Crynodeb o'r Gynrychiolaeth:

Persimmon supports the overall principle of a medium growth strategy. However, given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to overall housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.

The housing requirement is based on average completion rates over the first ten years of the adopted Local Development Plan. However, a higher rate of housing delivery is demonstrably achievable. Annual completion rates peaked at 917 dwellings, with six of the ten monitoring years exceeding the 526 per annum figure currently relied upon. This demonstrates that delivery capacity within the Vale has historically operated well above the proposed requirement and should therefore provide confidence that a higher housing target could realistically be achieved. A five-year average build rate of 780 units per annum was acheived between 2016 and 2021.

The ten-year average delivery rate fails to acknowledge that this period included the Covid-19 pandemic and at a time where construction costs experienced significant inflation.

The current adopted plan predates the publication of Future Wales: The National Plan 2040 and the Vale’s position within a national growth area. As such, pursuing an approach which seeks to maintain historic delivery rates is not considered to reflect this enhanced role and arguably lacks the level ambition set out at a national level. The proposed housing requirement should therefore be uplifted to positively respond to such matters in order to ensure conformity with Future Wales and regional aspirations.

Increasing the overall housing target would also act as a catalyst to enhance the delivery of affordable housing which is identified as a key objective for the RLDP.

The DPM is explicit in that the most up-to date suite of Welsh Government Population and Household Projections must form the foundation of any evidence base. The 2022-based Local authority household projections (Dated 20th November 2025) and 2025-based estimates of additional housing need (Dated 12th February 2026) have been published. The results show that whilst the overall number of households in Wales is projected to increase by around 98,500/ 7.2%and the Vale has the largest percentage increases (up 11.7%).

It remains unclear whether existing unmet need has been fully factored into the overall housing requirement. This is particularly important in the context of the Welsh Government’s 2025-based estimates which identify 9,400 units of unmet need at a national level and a requirement for 8,700 additional homes per annum over the next five years simply to address newly arising need. There is a compelling justification for a further uplift in housing numbers to ensure the Plan proactively addresses both existing and emerging need. Increasing the overall housing requirement would directly enhance the overall delivery rate for affordable homes which is crucial in a local authority area with the highest affordability ratio in Wales.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6820

Derbyniwyd: 11/03/2026

Respondent ID: 1225

Ymatebydd: Mr Ian Fairweather

Asiant : Boyer Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

There are concerns regarding a need for a higher housing level and the need for development to be appropriate placed in sustainable allocations in a settlement in which people want to live is still relevant.

Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.

To accommodate this increased in flexibility allowance and over all housing numbers, it should be outlined that smaller sites typically deliver more quickly, are less infrastructure-dependent, and increase build-out rates through diversification.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6853

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey maintains that the current housing requirement in the Deposit Revised Local Development Plan (RLDP) is fundamentally undervalued. By relying on a ten-year dwelling-led scenario, the methodology incorporates a period of suppressed supply caused by the delayed adoption of the previous plan. Taylor Wimpey argues that the council must instead align with Planning Policy Wales (PPW) by utilising the latest 2022-based household projections. This shift would increase the housing requirement from the proposed 7,587 units to 9,623 units to accurately reflect demographic evidence.

Regarding the flexibility allowance, Taylor Wimpey asserts that the proposed 10% buffer is insufficient. Evidence from the Annual Monitoring Report 2024-2025 reveals a 20.7% shortfall in completions against previous targets. Consequently, the firm recommends increasing the flexibility allowance to 20%, mirroring recent adjustments made by neighboring authorities like Bridgend, to ensure the housing requirement is actually met despite potential site non-delivery.

Taylor Wimpey also raises significant concerns regarding the reliability of the current land bank and windfall allowances. They suggest a 20% non-delivery discount should be applied to sites with planning permission to account for viability, site constraints, and landowner intentions. Similarly, the firm argues that windfall projections are overly optimistic; following the precedent set by Cardiff Council, they recommend reducing the windfall allowance to 75% of the ten-year average as easily developable sites become increasingly scarce.

Furthermore, Taylor Wimpey disputes the inclusion of certain "rolled forward" sites from the previous plan, specifically land at Pencoedtre Lane and Eglwys Brewis Road. These sites, totaling 370 homes, have failed to deliver despite long-standing policy support due to viability and technical constraints. Taylor Wimpey recommends their removal from the supply tables to maintain a realistic outlook on deliverability.

In conclusion, Taylor Wimpey suggests that the combination of a higher housing requirement, an increased flexibility buffer, and more cautious supply assumptions creates a significant deficit. They calculate that the RLDP must identify new allocations for an additional 3,872 homes to ensure a robust and sound development strategy for the region.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6860

Derbyniwyd: 11/03/2026

Respondent ID: 1170

Ymatebydd: Mr Andrew Raymond

Asiant : Boyer Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Concerns are raised regarding the overall housing requirement and the level of flexibility incorporated within the Plan. Policy SP6 currently establishes a housing requirement of 7,890 dwellings over the Plan period and includes a flexibility allowance of 10%, resulting in an overall provision of 8,660 dwellings. Whilst the inclusion of a flexibility allowance is supported, it is considered that a 10% allowance may not be sufficient to ensure resilience within the housing trajectory.
Recent experience from other Local Development Plans across Wales has demonstrated the importance of incorporating higher flexibility allowances to account for delivery uncertainty, infrastructure constraints and potential delays to larger strategic sites.
For example, other authorities have incorporated flexibility allowances in excess of the standard 10% to ensure the robustness of their housing supply and to provide a greater degree of adaptability should circumstances change during the Plan period.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6896

Derbyniwyd: 11/03/2026

Respondent ID: 3713

Ymatebydd: Catesby Estates

Asiant : Turley

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Catesby argues that the proposed housing figures remain insufficient. They contend that the growth level is too low when measured against the aspirations of Future Wales and the most recent population and household projections. Catesby suggests that a more robust and ambitious growth strategy is necessary to meet the actual housing needs of the Vale, advocating for an upward revision of the total requirement.

Noting Llandow’s accessible location and proximity to existing and emerging strategic employment opportunities, Catesby broadly SUPPORTS the Sustainable Growth Strategy insofar as seeking to achieve the housing requirement through a range of housing opportunities. This includes the co-locating of housing and employment growth, with a focus on established business parks and industrial estates.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6899

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Boyer Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Barratt Redrow maintain that a higher growth option should be followed. Given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to overall housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic underdelivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7040

Derbyniwyd: 10/03/2026

Respondent ID: 2413

Ymatebydd: Marion morgan

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
It considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7062

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Highlight Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Barratt Redrow objects to Policy SP6.
Whilst we support the Council’s intention to plan positively for housing growth through an up-to-date RLDP, the proposed housing requirement of 7,890 dwellings is not considered sufficiently ambitious and, in our view, is no longer justified by the most up-to-date evidence.
Policy SP6 should be amended to provide for a higher housing requirement. The precise figure is ultimately a matter for examination, but the current requirement is too low, too closely tied to past build rates, and insufficiently responsive to updated Welsh Government projections and housing need evidence. Additional evidence is required to identify the scale of new homes necessary, with alternative scenarios considered rather than simply extrapolating previous delivery trends.
Barratt Redrow also objects to the level of flexibility embedded within Policy SP6. In our view, a 10% flexibility allowance is not sufficient in the context of this Plan. The Plan’s reliance on rolled-forward sites and key sites means that a modest flexibility allowance of 10% does not provide a sufficient margin of safety.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7063

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Highlight Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Whilst we fully support the Council in looking to address issues of affordability, we consider that an increase in the housing requirement and subsequent increase in housing supply (both open market and affordable) should be pursued.
Windfalls account for a significant proportion of the supply and provide less certainty over
geographical distribution and delivery and rolled forward allocations require careful justification if they are to be relied upon as part of the plan’s effective provision.
In our view, the sounder approach would be to increase the flexibility allowance from 10% to 15% and broaden the supply base through the inclusion of additional sustainable and deliverable sites.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7091

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Turley

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Based on Welsh Government’s 2022-based household projections and the DPM, the number of overall dwellings identified will not meet the identified housing growth needs of VoG for the RLDP period. The Council should review the position in terms of the updated household projections. In order to achieve the third test of soundness (Will the plan deliver?), the policy must be updated to accommodate a greater level of housing delivery that reflects the most up to date evidence and align with Future Wales and the Vale’s identified role as a National Growth Area.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7092

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

The provision of a flexibility allowance is supported, but it should be increased to 15%. A higher figure is considered appropriate due to the low level of new allocations, the limited number of key sites allocated in the plan and the need to increase the level of required growth.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7140

Derbyniwyd: 11/03/2026

Respondent ID: 1182

Ymatebydd: Peter Stone Properties Ltd

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
It considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period.