Crynodeb o'r Gynrychiolaeth:

The housing requirement and the number of homes delivered through new allocations should be increased to make the plan more ambitious and align with Future Wales and the Vales' identified role as a national growth area.

The flexibility allowance should be increased to 15%. The Development Plan Manual 3 suggests 10% should be the starting point. A higher figure is considered appropriate due to the low level of new allocations and the limited number of key sites allocated in the plan. This means the plan has a heavy reliance on a small number of sites, which would suggest the need for greater flexibility provided through a range of additional smaller sites.

Newid wedi’i awgrymu gan ymatebydd:

Increase flexibility to 15%.

Increase the number of dwellings on allocated sites and increase the range of site sizes allocated.

Testun llawn:

The housing requirement and the number of homes delivered through new allocations should be increased to make the plan more ambitious and align with Future Wales and the Vales' identified role as a national growth area.

The flexibility allowance should be increased to 15%. The Development Plan Manual 3 suggests 10% should be the starting point. A higher figure is considered appropriate due to the low level of new allocations and the limited number of key sites allocated in the plan. This means the plan has a heavy reliance on a small number of sites, which would suggest the need for greater flexibility provided through a range of additional smaller sites.