SP1 – STRATEGAETH TWF CYNALIADWY

Yn dangos sylwadau a ffurflenni 31 i 57 o 57

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5890

Derbyniwyd: 11/03/2026

Respondent ID: 538

Ymatebydd: HBF

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

The plan lacks aspiration and does not provide a level of growth in line with the Vale's role as part of the national growth area identified in Future Wales.

The plan's role is to balance the 'need' for housing in a sustainable way, rather than limit delivery.

The plan's housing requirement is being limited by a level of delivery lower than the plan has previously achieved.

Delivering more housing will support economic growth and deliver more affordable homes.

The latest Welsh Government housing needs data requires an increase in the level of housing proposed.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5891

Derbyniwyd: 11/03/2026

Respondent ID: 538

Ymatebydd: HBF

Effeithiau ar y Gymraeg:

None

Crynodeb o'r Gynrychiolaeth:

In line with the comments already made on point 1 of the sustainable growth strategy, the HBF considers that the level of housing proposed lacks ambition and is not in line with the Vale of Glamorgan's position as a regional growth area in Future Wales.

The words 'including a minimum of 3,070 affordable homes' should be changed to ' a target of 3,070 affordable homes'. The reason for this is that a minimum suggests that it should be more; however, other relevant housing policies are worded to provide for a defined number or target. This change in wording does not stop more from being delivered.

The approach to limiting housing development, other than affordable-led schemes with a minimum of 50% affordable, in the identified towns and villages, restricts the ability of SME developers and, therefore, the range of homes that might be provided by the plan.

The HBF questions the wording under the heading 'Infrastructure', which is not appropriate wording, as it is part of the plan's role to identify the necessary infrastructure to deliver the level of growth proposed. The provision of infrastructure, which is necessary for development, is covered by other policies in the plan.

Why is the housing flexibility allowance figure not included in this policy?

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5990

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy SP1 proposes delivering 7,890 dwellings by 2036, including 3,070 affordable homes, with new sites outside Strategic Growth Areas limited to small-scale affordable housing schemes. However, Welsh Government 2022-based projections estimate households in the Vale of Glamorgan will increase from 57,676 in 2021 to 67,299 by 2036, a rise of 9,623 households. With a 4% household-to-dwelling conversion uplift, the required dwellings would be 10,008, significantly above the plan target. The policy also proposes 205 affordable homes per year, far below the LHMA 2023 identified need of about 1,075–1,114 annually, meaning affordable housing delivery would meet only 18.4% of identified demand.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6025

Derbyniwyd: 11/03/2026

Respondent ID: 2350

Ymatebydd: Mr Paul Miller

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

I don'y consider that to be relevant when so many other more fundamental issues are at stake

Crynodeb o'r Gynrychiolaeth:

The proposed plan will place further strain on already barely adequate public services; the roads are already heavily congested particularly during peak travel times; there will be a detrimental loss of green spaces within the area which may reduce the area's capacity to create a feeling of well being.
The roads are already in a poor state with much restorative work urgently required so any increase in the number of cars will only exacerbate this situation.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6170

Derbyniwyd: 11/03/2026

Respondent ID: 2547

Ymatebydd: Mrs Victoria Tipples

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Why is all the housing being considered all along one main road from Rhoose to Weycock Cross? The area can’t handle the current level of traffic. One small car breaking down along that road chokes up the whole of Barry. Then you want to add 1000+ houses along the same route. How can this not be seen as a poor decision? We all understand that there needs to be new housing, but surely more thought could go into choosing a more suitable area to build.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6290

Derbyniwyd: 05/02/2026

Respondent ID: 3161

Ymatebydd: Mr Steve Ashman

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

There is a problem with traffic across Barry and Rhoose. The college plus more houses being built at Rhoose point, the ongoing battle at Model farm as well as more houses being built at Weycock cross will add to traffic congestion. There also is only one train and bus an hour so if you’re trying to get cars off the roads these need to be increased.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6535

Derbyniwyd: 11/03/2026

Respondent ID: 1324

Ymatebydd: MS Andrew R T Davies

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The entire strategy behind the deposit plan is flawed and the process needs to begin again.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6699

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Asbri Planning

Crynodeb o'r Gynrychiolaeth:

Sustainable Growth Strategy (Policy SP1)

The Deposit Plan’s overarching strategy in relation to sustainable growth is supported. The primary focus of concentrating housing growth within the ‘Strategic Growth Area’ (i.e. where the main centres of population are accommodated, and which are served by a range of facilities and services, and are accessible by a range of transport modes) as outlined by Policy SP1 is considered appropriate and will allow for the delivery of sustainable and resilient communities.

As per previous representations submitted by Asbri Planning on behalf of Persimmon Homes in relation to the RLDP Preferred Strategy, the prior identification of the strategic-scale (1,500 unit) Key Site at North East Barry was considered to represent an over-reliance on one site to meet the housing demand of the Authority’s Key Settlement (with associated constraints in relation to the delivery of units on a strategic-scale site within the early
mid part of the plan period).

It is considered that the inclusion of North West Barry as a Key Site, supplemented by a number of smaller housing allocations as identified in Policy HG1, will ensure that
the housing requirement for the Barry can be met in a robust and deliverable manner.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6714

Derbyniwyd: 10/03/2026

Respondent ID: 2397

Ymatebydd: Cardiff and Vale University Health Board

Crynodeb o'r Gynrychiolaeth:

Spatial strategy: SP1 - Sustainable growth: While the plan addresses overall growth distribution, it does not consider how development affects local food resilience, including the protection of agricultural land, peri-urban growing spaces, or local supply chains. There is no strategic reference to food as a component of sustainable, resilient communities. The vision and strategic objectives currently contain no mention of ‘food’ or ‘farming’. Request to add reference (Spatial strategy or Strategic objectives section) to supporting resilient and sustainable local food systems in spatial strategy principles, including protection of productive land and support for local supply chains.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6736

Derbyniwyd: 10/03/2026

Respondent ID: 854

Ymatebydd: Hallam Land Management

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

Hallam are generally supportive of the aims of this policy. The strategy of focusing new housing in those locations served by existing transport routes and where there are opportunities to enhance sustainable transport connectivity is wholly supported. St Athan is clearly already a sustainable location for growth and its sustainability and connectivity have clear potential to enhance alongside further development. The delivery of growth in St Athan is therefore considered to firmly align with the RLDP's strategy.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6818

Derbyniwyd: 11/03/2026

Respondent ID: 1225

Ymatebydd: Mr Ian Fairweather

Asiant : Boyer Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

There is concern that the proposed primary focus of housing growth within the Vale being within the Strategic Growth Area. Limiting development at suitable settlements outside the Strategic Growth Area is not the correct approach and greater flexibility is required to deliver the housing need. Clearly there is a requirement to provide further allocations in sustainable Minor Rural settlements identified as being ‘Outside of the Strategic Growth Area’ – namely St Nicholas.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6844

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey consider that to date the growth strategy has placed disproportionate emphasis on identifying an alternative site within Barry, rather than giving due consideration to potential sites in nearby high‑performing settlements such as Sully. Taylor Wimpey therefore strongly encourage the VoG to widen the search for additional allocations beyond the administrative boundary of Barry Town Council and to consider locations that represent a logical and sustainable extension to neighbouring primary settlements that are located within the Strategic Growth Area, including Sully.

The six key elements of the Sustainable Growth Strategy are noted and Taylor Wimpey support a spatial strategy that locates major new development for the delivery of sustainable housing growth in appropriate locations, such as Sully, that are supported by the relevant infrastructure, services and facilities. Providing new homes within Phase 3 aligns with the Strategic Growth Area identified within the RLDP Strategy which forms the primary focus for housing growth.

Policy SPG1 continues to identify Sully as a location where new housing development will be concentrated, therefore establishing a principle of development for Phase 3 and help to further align the provision of new housing with the existing facilities of Sully, reducing the need to travel. Sully represents an inherently sustainable location for future growth and aligns well with the Sustainable Transport Oriented Growth Option. As identified in the Deposit RLDP, Sully is classified as a Primary Settlement and performs a complementary role to Barry as a key centre. Its position within the Strategic Growth Area further indicates that an appropriate level of development at Sully would be acceptable, with both existing housing delivery and the current allocation at Swanbridge Road supporting its established role.

With existing development ongoing to the north of the Site, at Phases 1 and 2 of Land West of Swanbridge Road, Phase 3 is considered to provide an appropriate level of growth in a sustainable location that would form a logical extension to existing allocations. The sustainability and suitability of Sully to accommodate residential development is reinforced by the allocation of 500 dwellings under Policy MG2(37) (‘Land West of Swanbridge Road, Sully’) on land directly north of the site promoted by Taylor Wimpey. The progression of this location into a phase 3 development would continue to strengthen Sully’s function as a primary settlement and would constitute a logical and coherent extension to the existing built form.

Taylor Wimpey appreciate the aspirations of the Council to deliver housing to meet the identified future housing needs of the VoG and wider growth aspirations of the South East Wales Region at a strategic level. Taylor Wimpey support the revised strategy moving away from North East Barry, however maintain the position that this level of growth should be re-allocated to those locations that are most suitable for growth, including sustainable settlements outside of Barry. Growth should not be focuses solely on Barry.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6858

Derbyniwyd: 11/03/2026

Respondent ID: 1170

Ymatebydd: Mr Andrew Raymond

Asiant : Boyer Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The approach adopted within the RLDP places an overly narrow emphasis on growth within the Strategic Growth Area, primarily focused along rail corridors. This approach risks overlooking other sustainable rural settlements which also demonstrate appropriate connectivity and capacity to accommodate proportionate growth.

Settlements outside the Strategic Growth Area continue to perform an important role within the Vale’s settlement hierarchy and rural economy. Villages such as Colwinston provide an established residential community and contribute to the vitality and sustainability of rural areas. Restricting opportunities for modest growth within such settlements risks undermining the long-term sustainability of rural communities.

The principle of directing development to sustainable settlements is supported. However, limiting development opportunities exclusively within the Strategic Growth Area is not considered to represent the most balanced or flexible spatial strategy.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6893

Derbyniwyd: 11/03/2026

Respondent ID: 3713

Ymatebydd: Catesby Estates

Asiant : Turley

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Policy SP1 - Sustainable Growth Strategy reiterates that the Plan will deliver 7,890 dwellings by 2036, including a minimum of 3,070 affordable homes. Policy SP1 also sets out that, outside of the Strategic Growth Areas, the allocation of new sites will be limited to small-scale affordable housing led sites.

In order to ensure that the minimum target figure is met, it is important that the Plan identifies a sufficient number of sites / housing allocations to meet both the short and longer term development needs. As previously stated, Catesby SUPPORTS the overall growth strategy across the Vale of Glamorgan contained in the Deposit RLDP. However, it is questioned whether or not there is sufficient land allocated to deliver the growth required.

Of the overall housing target of 7,890 dwellings, approximately half of these are to be delivered via rolled forward allocations and extant consents. Whilst some such sites can be expected to come forward, Catesby would caution against the over-reliance on delivery of historically allocated sites.

Catesby suggests that VoGC considers the inclusion of additional sites to deliver the predicted growth strategy identified in the RLDP. This will strengthen the land supply position ensuring a robust RLDP can be adopted which has the ability to ensure the delivery of the necessary growth. Catesby supports growth along the ‘Connectivity’ corridor, particularly in Minor Rural Settlements such as Llandow to assist with this.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6939

Derbyniwyd: 11/03/2026

Respondent ID: 1125

Ymatebydd: Penarth Town Council

Crynodeb o'r Gynrychiolaeth:

Members noted that there was not much focus on Penarth or identified potential future development for Penarth beyond that already underway at the location near to Cosmeston but welcomed flexibility in its approach. Members expected to be more closely involved in the decisions and planning of this, and other such developments, and provide opportunity for wider consultation where appropriate, such as pre-application consultations, as well as would expect to be included in consultations concerning sites adjacent to Llandough, Dinas Powys, and Sully given their impact upon the town.

Penarth as a town is currently developed to its boundaries, save for the development at Cosmeston. It is, therefore, more dependent than other Service Centres on windfalls of land or buildings which may arise during the currency of the Plan. In 2023, an extensive assessment of the potential of the town concluded the following:

“There is marginally less capacity in Penarth [and Llandough] than the projected figures. However, this does not mean that the projections are incorrect or unjustifiable. The reported figures have not included a significant amount of capacity on open space land, and the projected figures for conversion of existing buildings and intensifications will be surpassed if the extant consents that exist this early in the Plan period are implemented.”

The degree of flexibility, however, is substantially depending on one large site. P009, Headland School, is identified as both a potentially disused building and as a site with a capacity of 111-120 units. This special school is full to capacity and used by many Council in both Wales and England.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7036

Derbyniwyd: 10/03/2026

Respondent ID: 2413

Ymatebydd: Marion morgan

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We object to the spatial growth strategy set out within the Deposit Plan and therefore question the delivery and soundness of the Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain an over-reliance of housing growth on this defined area, and the associated absence of growth in other Rural parts of the plan area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan, which includes enabling opportunities to provide employment and business premises within/near to rural settlements. The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the principal settlement and Strategic Growth Area of Talbot Green/Pontyclun/Llantrisant to the north. The current strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural and bus services should be appropriately assessed and focused on in terms of promoting sustainable development. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to deliver housing in the short and medium term of the Plan period.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7057

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Highlight Planning

Crynodeb o'r Gynrychiolaeth:

Barratt Redrow supports the broad objective of pursuing a sustainable growth strategy and agrees that growth should be directed towards the most sustainable locations. The emphasis on public transport connectivity, access to services and the need to align housing growth with wider regional aspirations is supported in principle.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7058

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Highlight Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Our concern is that the strategy as drafted is not sufficiently nuanced and, in practice, it places too much weight on the Strategic Growth Areas and not enough weight on sustainable settlements outside it. In doing so, it risks overlooking villages which perform well against the Council’s own settlement evidence, and which can accommodate proportionate growth in a highly sustainable way. The strategy should not be read as favouring rail-served locations to the exclusion of settlements with strong bus accessibility and established local services. The Council’s own evidence and national policy context support a strategy that captures sustainable bus-connected settlements as well as rail-served settlements. St Nicholas should be expressly recognised as one of those locations. SP1 should be amended to reflect this.
In our view, the current Deposit strategy has moved too far away from the balanced position on Minor Rural Settlements in the adopted LDP. The Plan now acknowledges the sustainability credentials of St Nicholas but does not allow those credentials to translate into an appropriate development role.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7071

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Highlight Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The concern is that the overall strategy becomes too rigid when SP8 is read alongside SP2, SP3, HG4 and other potentially onerous policy requirements, including Policy CC1. In practice, this risks leaving sustainable settlements such as St Nicholas with very little scope to contribute to general housing delivery unless schemes meet a highly demanding affordable-led model. That is not a balanced or flexible way to plan for rural communities. It also gives rise to a lack of clarity between Policies SP7 and SP8 which should be addressed.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7096

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

The identification of St Athan as a settlement where development should be concentrated is supported.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7136

Derbyniwyd: 11/03/2026

Respondent ID: 1182

Ymatebydd: Peter Stone Properties Ltd

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We object to the spatial growth strategy within the Deposit Plan and consequently question its soundness and delivery. Specifically, we object to the 'Strategic Growth Area' (SGA) strategy, which creates an over-reliance on a single defined area while neglecting the Rural Vale.

The Plan is internally inconsistent: while it recognises a critical need for affordable housing—particularly for an increasingly ageing population and to prevent the out-migration of younger working-age residents—the lack of allocations in Minor Rural Settlements (such as Bonvilston) undermines these objectives. The current strategy fails to address the high entry costs in rural areas (where average prices exceed £800k) and ignores the Local Housing Market Assessment (LHMA) requirements for affordable delivery outside the SGA.

Furthermore, the Plan fails to account for the functional relationship between the Western/Northern Vale and external employment hubs in Bridgend and Talbot Green/Llantrisant. By focusing growth solely on rail-accessible settlements, the Plan ignores the 'inherently rural' nature of the Vale and fails to support sustainable bus-based transit and local employment opportunities. To be sound, the Plan must pursue a strategy that allocates a greater proportion of small-to-medium sites in rural settlements to ensure delivery in the short-to-medium term and to create a more balanced demographic and economic future for the Authority.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7158

Derbyniwyd: 11/04/2026

Respondent ID: 2373

Ymatebydd: Wig Fach Property Company Ltd

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We object to the spatial growth strategy set out within the Deposit Plan and therefore question the delivery and soundness of the Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain an over-reliance of housing growth on this defined area, and the associated absence of growth in other Rural parts of the plan area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan, which includes enabling opportunities to provide employment and business premises within/near to rural settlements. The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the principal settlement and Strategic Growth Area of Talbot Green/Pontyclun/Llantrisant to the north. The current strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural and bus services should be appropriately assessed and focussed on in terms of promoting sustainable development. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to deliver housing in the short and medium term of the Plan period.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7185

Derbyniwyd: 11/03/2026

Respondent ID: 3741

Ymatebydd: H Jones, L Sungur and P John

Asiant : Herbert R Thomas Commercial Agents Cardiff

Crynodeb o'r Gynrychiolaeth:

The essence of Policy SP1 is supported. The promotion of small-scale affordable housing led development outside of the SGA, as proposed by SP1 is important as this provides essential affordable and market homes in the rural locations of the Vale as well as the SGA.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7186

Derbyniwyd: 11/03/2026

Respondent ID: 3741

Ymatebydd: H Jones, L Sungur and P John

Asiant : Herbert R Thomas Commercial Agents Cardiff

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The concern is whether Policy SP1 goes far enough in providing for the scale of housing (both open market, but particularly Affordable) development across the Vale. Without targeted allocations outside of the SGA, as outlined in Policy SP1, the housing gap will continue to widen, forcing more residents to leave the area and weakening community cohesion.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7211

Derbyniwyd: 11/03/2026

Respondent ID: 3599

Ymatebydd: Mrs Melissa Plimmer

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The RLDP identifies St Athan as a "Strategic Hub," yet it remains the only primary settlement in the Vale of Glamorgan without a direct rail link. Relying on the "Active Travel" aspirations of Policy SP10 is unrealistic for a community where the majority of residents commute to Cardiff, Bridgend, or Barry.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7213

Derbyniwyd: 11/03/2026

Respondent ID: 3444

Ymatebydd: Mr Andrew Street

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The RLDP identifies St Athan as a "Strategic Hub," yet it remains the only primary settlement in the Vale of Glamorgan without a direct rail link. Relying on the "Active Travel" aspirations of Policy SP10 is unrealistic for a community where the majority of residents commute to Cardiff, Bridgend, or Barry.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7230

Derbyniwyd: 09/03/2026

Respondent ID: 2712

Ymatebydd: Dinas Powys Community Council

Crynodeb o'r Gynrychiolaeth:

Dinas Powys Community Council (DPCC) recognises and welcomes some improvements made in the revised Replacement Local Development Plan (RLDP). These changes demonstrate a more balanced approach to growth and a clearer acknowledgement of environmental and infrastructure constraints across the Vale. DPCC considers the following amendments to be positive and constructive:
3.1 Reduction in Overall Housing Numbers
The reduction in the total housing requirement reflects a more realistic assessment of demographic trends, household formation rates, and deliverability across the plan period. This reduces pressure on constrained settlements such as Dinas Powys.
3.2 Greater Emphasis on Sustainable Locations
The revised RLDP places stronger emphasis on locating development where sustainable transport options exist. This aligns with national policy and reduces reliance on private car travel.
3.3 Strengthened Climate-Change and Flood-Risk Policies
The Council welcomes the enhanced policy framework relating to:
• Climate-change adaptation
• Flood-risk management
• Sustainable drainage (SuDS)
• Nature-based solutions
These changes reflect national guidance and NRW expectations.
3.4 Recognition of Infrastructure Constraints
The revised evidence base acknowledges that certain settlements – including Dinas Powys -face:
• Highway capacity limitations
• Public transport constraints
• Limited school and healthcare capacity
This recognition is essential for sound plan-making.
3.5 Improved Evidence Base
The updated background papers, including the Settlement Sustainability Assessment and the Infrastructure Assessment, provide a clearer picture of constraints and opportunities across the Vale.

Atodiadau: