SP10 - TRAFNIDIAETH GYNALIADWY
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4604
Derbyniwyd: 11/02/2026
Respondent ID: 2683
Ymatebydd: Mr David Barton
Cadarn? Nac Ydi
-
This doesn't work in reality alienating outsiders from investing here.
reverse this step and make the area easy to navigate by motor vehicle including free car parking en masse.
Utilise Traditional Architecture Design Codes for all new construction with a ban on demolition of all buildings constructed prior to 1950. See my PDF Umbrella Representation for additional Placemaking/ Planning and Greenery Proposals.
This doesn't work in reality alienating outsiders from investing here.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4983
Derbyniwyd: 28/02/2026
Respondent ID: 2653
Ymatebydd: Emma Reed
Cadarn? Nac Ydi
Rhoose is taking some 10 percent of increased development yet there are no improvements to rail or bus services. The Plan allocates St Athan Rail land without any evidence it will be delivered. As a minimum there should be two trains an hour in Rhoose BEFORE any new development is even considered. Same with buses a minimum of 2 per hour. The active travel route to Weycock Cross also must be completed. If the developments at Rhoose cannot provide such enhancements the developments must not happen as the Plan would be unsound having not considered appropriate infrastructure.
Before any development in Rhoose better transport facilities as identified above must be provided. This is essential to make the Plan sound. Without them the Plan is unsound.
Rhoose is taking some 10 percent of increased development yet there are no improvements to rail or bus services. The Plan allocates St Athan Rail land without any evidence it will be delivered. As a minimum there should be two trains an hour in Rhoose BEFORE any new development is even considered. Same with buses a minimum of 2 per hour. The active travel route to Weycock Cross also must be completed. If the developments at Rhoose cannot provide such enhancements the developments must not happen as the Plan would be unsound having not considered appropriate infrastructure.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5348
Derbyniwyd: 08/03/2026
Respondent ID: 920
Ymatebydd: Professor Andrew Vincent
The bus to the airport has been at best a variable and very infrequent item. Most people who are looking not to pay for airport parking will regularly park their car, sometimes for several weeks, in Pontypridd Road and then get a taxi to and from the airport. My wife and I have seen this too many times to count. The airport bus has been too infrequent and too unreliable for most people.
The bus to the airport has been at best a variable and very infrequent item. Most people who are looking not to pay for airport parking will regularly park their car, sometimes for several weeks, in Pontypridd Road and then get a taxi to and from the airport. My wife and I have seen this too many times to count. The airport bus has been too infrequent and too unreliable for most people.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5349
Derbyniwyd: 08/03/2026
Respondent ID: 920
Ymatebydd: Professor Andrew Vincent
A regular public transport from Port Road area to either Dinas or Cardiff would indeed be welcome. But in the fifteen years we have lived here in Pontypridd Road there has been no such buses at all
A regular public transport from Port Road area to either Dinas or Cardiff would indeed be welcome. But in the fifteen years we have lived here in Pontypridd Road there has been no such buses at all
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5363
Derbyniwyd: 08/03/2026
Respondent ID: 920
Ymatebydd: Professor Andrew Vincent
Cadarn? Nac Ydi
This bus service is unreliable and has dropped in an out of usage over the last decade. It is also infrequent and not easy to concide with flights. Many wishing to use the airport or avoid airport parking charges will park their cars in Pontypridd Road - sometimes for two or more weeks and get a taxi to the airport.
A fully reliable regular service would be helpful and one that stops near Weycock Cross!
This bus service is unreliable and has dropped in an out of usage over the last decade. It is also infrequent and not easy to concide with flights. Many wishing to use the airport or avoid airport parking charges will park their cars in Pontypridd Road - sometimes for two or more weeks and get a taxi to the airport.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5529
Derbyniwyd: 09/03/2026
Respondent ID: 2309
Ymatebydd: Mrs Hilary May
Ensure active travel provision is in place before people move into new housing. All sites have potential to improve active travel for existing residents as well as new residents, reducing car dependency. Ensure active travel routes go beyond the sites to places people want to travel to and link with other active travel routes. Ebikes in particular have a real potential to reduce car use so ensure safe cycle storage for all households is included in plans. Improve access to public transport eg lifts at stations and better bus links to services.
Ensure active travel provision is in place before people move into new housing. All sites have potential to improve active travel for existing residents as well as new residents, reducing car dependency. Ensure active travel routes go beyond the sites to places people want to travel to and link with other active travel routes. Ebikes in particular have a real potential to reduce car use so ensure safe cycle storage for all households is included in plans. Improve access to public transport eg lifts at stations and better bus links to services.
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5583
Derbyniwyd: 09/03/2026
Respondent ID: 1432
Ymatebydd: Ms Samantha Hall
Not applicable
We need hourly trains from Llantwit Major and trains from Llantwit and Rhoose straight into Cardiff. You can drive to Cardiff in the same time it takes to get the train from Llantwit Major and therefore there is no incentive to take public transport, particularly if you have to wait for 45 minutes for the next train.
We need hourly trains from Llantwit Major and trains from Llantwit and Rhoose straight into Cardiff. You can drive to Cardiff in the same time it takes to get the train from Llantwit Major and therefore there is no incentive to take public transport, particularly if you have to wait for 45 minutes for the next train.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5656
Derbyniwyd: 10/03/2026
Respondent ID: 3264
Ymatebydd: Mr David Entwistle
Cadarn? Nac Ydi
The plan does not go into enough depth in how to council plans to realistically deliver and encourage active travel options. At present public transport services fall far short of the route network and frequency required to make them a realistic alternative for most journeys. Concrete, realistic and deliverable improvements need to be included in the LDP rather than simple vague promises.
The council needs to commit to expanding the bus network and providing subsidies if required. Better bus linkups to train stations need to be provided along with additional parking at current stations. The timetables need to be overhauled and increased frequencies of services as at present even residents wanting to take public transport to a place of work in Cardiff for example cannot due to a range of factors. The LDP needs to actually lay out how these improvements can be achieved.
The plan does not go into enough depth in how to council plans to realistically deliver and encourage active travel options. At present public transport services fall far short of the route network and frequency required to make them a realistic alternative for most journeys. Concrete, realistic and deliverable improvements need to be included in the LDP rather than simple vague promises.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5911
Derbyniwyd: 11/03/2026
Respondent ID: 538
Ymatebydd: HBF
Cadarn? Ydi
None
Point 6 of the policy should be reworded, as it is not for a developer to provide transport services, at best and only where required as a direct result of the proposed development; they can contribute towards transport services provided by others.
The wording 'As appropriate, new development proposals will be required to provide Transport Statements, Transport Assessments and Travel Plans to ensure the delivery of travel choice and sustainable opportunities for travel.' is considered to be too vague. There is no clarification on when it would be 'appropriate' and in what scenario would one or all of the reports mentioned be required.
Further, the supporting text para. 6.187 does not really provide any specific guidance to support this policy requirement. At what stage in the planning process would it be decided that one or all of these documents are required, and based on what criteria? This lack of clarity could lead to delays in the delivery of new homes and uncertainty for developers.
Point 6 should be reworded as follows:
'Contribute to new or enhanced transport services and facilities where appropriate.'
Clear criteria should be set for when the various highway reports are required to be submitted with an application.
Point 6 of the policy should be reworded, as it is not for a developer to provide transport services, at best and only where required as a direct result of the proposed development; they can contribute towards transport services provided by others.
The wording 'As appropriate, new development proposals will be required to provide Transport Statements, Transport Assessments and Travel Plans to ensure the delivery of travel choice and sustainable opportunities for travel.' is considered to be too vague. There is no clarification on when it would be 'appropriate' and in what scenario would one or all of the reports mentioned be required.
Further, the supporting text para. 6.187 does not really provide any specific guidance to support this policy requirement. At what stage in the planning process would it be decided that one or all of these documents are required, and based on what criteria? This lack of clarity could lead to delays in the delivery of new homes and uncertainty for developers.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6678
Derbyniwyd: 26/02/2026
Respondent ID: 694
Ymatebydd: South Wales Police – Secured by Design Officer
Early consultation with South Wales Police Designing Out Crime Officers and South Wales Police Road Traffic Management Department where roads and pathways are planned to be built. Where active travel routes are being planned, South Wales Police Traffic Management Team should be consulted throughout the planning process.
South Wales Police Traffic Management Department should be consulted to ensure that sustainable transport links are safe. If these links are rail, then the British Transport Police Designing out crime officer should be contacted at the pre planning stage.
We would like to thank you for consulting with South Wales Police in respect of the Replacement Local Development Plan 2021 to 2036.
We welcome working with The Vale of Glamorgan Council in respect of The Vale of Glamorgan Replacement Local Development Plan 2021 – 2036: Deposit Plan to ensure the future needs and community safety is addressed within the plan and supporting documents.
We would respectfully ask that our comments are taken into consideration, and included in the plan, and that we can work in partnership to develop the specific planning guidance documents mentioned below.
The replacement development plan outlines its Vision and objectives of the RLDP as follows:
‘By 2036’:
The Vale of Glamorgan is a healthy and inclusive place for everyone, with equitable access to services and facilities both physically and digitally. Residents are proud of where they live and have access to the homes they need. Housing growth has delivered homes which caters for all, including affordable homes and older person’s housing; contributing towards diverse and cohesive communities where residents can maintain their independence.
Through placemaking, places and spaces are safe, accessible and socially inclusive. Development respects local character and sense of place is valued by residents and contributes positively towards health and wellbeing. Positive improvements have been achieved in narrowing the disparities in Integrated Sustainability Appraisal (ISA) for the Replacement Local Development Plan Prepared for: Vale of Glamorgan Council AECOM 5 the quality of life and health outcomes for residents living in the most deprived areas through improved access to employment, education, training, services, and investment in the built environment.
The Vale enjoys a network of connected, multi-functional and accessible green and blue spaces, providing a range of enhanced leisure and health benefits within and between towns, villages, and the countryside. More residents participate in active and healthy lifestyles. Investment in green infrastructure has produced a net biodiversity benefit with the creation of new habitats, enhanced connectivity and Planting providing carbon storage and contributing towards Climate Change resilience and adaptation.
Objectives:
1. Mitigating and adapting to climate change
2. Improving mental and physical health and well-being
3. Homes for all
4. Placemaking
5. Protecting and enhancing the natural environment
Policies that support the role of a Designing Out Crime Officer and Secured by Design are as follows:
Secured by Design (SBD) is the official police security initiative that works to improve the security of buildings and their immediate surroundings to provide safe places to live, work, shop, and visit.
Planning Policy Wales (PPW) states that crime and prevention and fear of crime are social considerations to which regard must be given by local planning authorities in the preparation of development plans. They should be reflected in any supplementary planning guidance and may be material considerations in the determination of planning applications. The aim should be to produce safe environments through good design.
Technical Advice Note (TAN) 12: Design, provides advice for all those involved in the design of development on how good sustainable design can be facilitated through the planning system. TAN 12 reminds practitioners that local authorities (including National Park Authorities) are required to have due regard to crime and disorder prevention in the exercise of their functions under Section 17 of the Crime and Disorder Act 1998.
TAN 12 recognises the Secured by Design initiative as a standard that has been shown to reduce crime.
TAN 12, paragraph states that ‘Local authorities are advised to consult Designing out Crime Officers on pre-applications and planning applications for those developments where there is potential to eliminate or reduce crime through the adoption of suitable measures at the design stage. This is especially important for major developments such as new housing estates, industrial estates, shopping centres, leisure complexes, schools, and car parks. It is important to consult Designing out Crime Officers at as early stage as possible – by the time a formal application is submitted, the opportunity to take account of advice may already be limited.’
Section 17 of the Crime and Disorder Act 1988 requires local authorities to consider crime and disorder implications in all their authorities and functions and do all that they reasonably can do all they can do to reduce these problems.
Violence against women and Girls:
Crime has a major impact on people’s lives in the Vale of Glamorgan and impacts on the health of the public especially those who have been victims of crime and anti-social behaviour and vulnerable groups such as Women and Girls.
In spring 2023, the Home Secretary announced Violence Against Women and Girls as a national threat and included it within the 9 Strategic Policing Requirement (SPR) alongside terrorism, serious and organised crime, and child sexual abuse.
Secured by Design can assist with ensuring that the built environment in all its forms is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise, for all. The importance of this is outlined within the National Police Chiefs’ Council’s (NPCC) ‘Policing Violence Against Women and Girls – The National Framework for Delivery: 2024 – 2027’ under the ‘Prevent’ element of the strategy; outlining the need for building safer spaces and places. Further information is available at: https://www.npcc.police.uk/SysSiteAssets/media/downloads/our-work/vawg/vawg-framework-fordelivery.pdf
In Wales, planning is devolved. Planning Policy Wales and Future Wales: The National Plan 2040 set out the Welsh Government’s national planning policy, where new developments are proposed. Planning Policy Wales explains: “A clear rationale behind the design decisions made […] should be sought throughout the development process and expressed, when appropriate, in a design and access statement.”
76 The guidance for design and access statements for Wales categorises five key objectives of good design (Access, Character, Community Safety, Environmental Sustainability and Movement) and explains how meeting these objectives should ensure that both design quality and inclusive access are given sufficient consideration in the planning process.
77 Design and access statements have been required in Wales for many planning applications since 2009 and have been part of legislative requirements since the Planning (Wales) Act 2015.
The Angiolini Inquiry Part 2 First Report: Prevention of sexually motivated crimes against women in public Ordered by the House of Commons to be printed on 2 December
In Wales, local authorities are under legal obligation to consider and address crime while in the process of planning: “Local authorities [in Wales] are under a legal obligation to consider the need to prevent and reduce crime and disorder in all decisions that they take. Crime prevention and fear of crime are social considerations to which regard should be given in the preparation of development plans and taking planning decisions. The aim should be to produce safe environments that do not compromise on design quality in accordance with the cohesive communities’ wellbeing goal.”
The Inquiry considers that there would be an opportunity to place a greater focus on preventing sexually motivated crimes against women in public spaces if this priority were reflected in planning guidance and principles.
For instance, neither the English nor the Welsh documentation contains specific reference to considering how design can help prevent violence against women in public spaces. The Inquiry saw evidence of this being discussed: “Under public spaces in the National Model Design Guide it mentioned well located, attractive public spaces. But there is no mention of violence against women and girls. There is minimal mention of crime reduction, just that amenity spaces should make people feel safe, help overcome crime, reduce the fear of crime.”
The Terrorism (protection of premises)Act 2025 (Martyn’s Law)
This Act became legislation on the 3rd of April 2025. This legislation is to improve protective security and preparedness across the United Kingdom for certain premises.
South Wales Police and Counter Terrorism Policing Wales would ask that where this legislation applies that early consultation takes place with the Designing out crime officers and Counter Terrorism Policing Wales.
If a premises falls within the scope of the The Terrorism (Protection of Premises) Act 2025, the development plans should be referred to South Wales Police Designing Out Crime Officers who will in turn will take advice from Counter Terrorism Policing Wales. This consultation should take place at the pre planning stage.
Standard Tier- will drive good preparedness outcomes. Locations with a maximum occupancy of greater than two hundred people will be required to have appropriate public protection procedures in place to ensure effective protective security and preparedness if an act of terrorism were to occur in their premises or immediate vicinity.
Enhanced Tier- focused on high-capacity locations in recognition of the potential consequences of a successful attack. Locations with an occupancy of eight hundred plus at any time will be required to have in place as reasonably practicable, appropriate public protection procedures and measures that can be expected to reduce the vulnerability of the premises, and the risk of physical harm being caused to individuals if an attack was to occur there or nearby.
Premises will fall within scope of The Terrorism (protection of premises)Act 2025 where “qualifying activities” take place. This will include activities such as entertainment, leisure, retail, food and drink, museums and galleries, sports grounds, public areas of local and central Government buildings (e.g. town halls), visitor attractions, temporary events, Places of Worship, health, and education.
The legislation applies to eligible locations which are either: a building (including collections of buildings used for the same purposes, e.g. a campus); or location/event (including a temporary event) that has a defined boundary, allowing capacity to be known. Eligible locations whose maximum occupancy meets the above specified thresholds will be then drawn into the relevant tier.
Public Spaces:
It should be borne in mind that the development of public spaces which are either owned, managed or they have influence over should also include protected security and preparedness at the concept stage of the planning process.
South Wales Police recommendations:
Our recommendations are set out below in relation the objectives and specifically to preventing crime and disorder and enhancing community safety:
1. Mitigating and adapting to climate change Secured by Design Residential Guide 2025 states:
Crime committed in 2011 in England and Wales is estimated to have given rise to over 4 million tonnes CO2e, equivalent to emissions of around 900,000 UK homes. Burglary resulted in the largest proportion of the total footprint (30%) due to large volume of offences and the carbon associated with replacing stolen or damaged goods.
Source: “Addressing the Carbon-Crime Blind Spot - A Carbon Footprint Approach” (2016). Helen Skudder, Professor Angela Druckman, Jon Cole, Alan McInnes, Dr Ian Brunton-Smith, Dr Gian Paolo Ansalon.
Secured by Design states ‘The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage (Note 1.5). It also has a significant impact on anti-social behaviour.
Therefore, there are substantial carbon cost savings associated with building new homes and refurbishing existing homes to the SBD standard i.e. less replacement of poor-quality doors, windows and the stolen property from within the home as a result of criminal acts. This has been achieved through adherence to well-researched and effective design solutions, innovative and creative product design coupled with robust manufacturing standards.’
Research documentation can be found on the SBD website at: https://www.securedbydesign.come
Recommendations:
• SP 6 - Ensure early consultation with the Designing Out Crime Officer and to achieve Secured by Design on all new developments and refurbishments.
• CC5 - Heat Networks – Advice should be sought from the Designing Out Crime officer to ensure the safe placement of heat pump devices.
• CC5 – Consultation should take place with the Designing Out Crime Officer in respect of wind or solar farms, so Secured by Design can be achieved.
• DNP7 – DARK SKIES – Secured by Design can assist with ensuring that the built environment in all its forms is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise. South Wales Police would ask that Designing Out Crime Officers are involved at the pre planning stage to discuss and be able to make recommendations in relation to lighting.
Reason: To reduce the carbon footprint of development.
2. Improving mental and physical health and well-being
• PGD1 – Creating well designed and inclusive places states:
Development must demonstrate that the following:
Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance
Ensuring that public open space, private amenity space and cycle and car parking in accordance with the Council’s standards.
Secured by Design Residential Guide states:
Poorly designed and specified public realm and communal areas, such as playgrounds, roof gardens, communal gardens, community dining rooms, toddler play areas, seating facilities have the potential to generate crime, the fear of crime and anti-social behaviour.
The design and layout of play spaces will vary depending on the age requirements. The provision of inclusively designed public amenity/play spaces as an integral part of residential developments, should make a valuable contribution towards the quality of the development and the character of the neighbourhood.
Recommendations:
• PGD 1 - Facilities shall be designed to allow natural surveillance from nearby dwellings with safe and accessible routes for users to come and go. Boundaries between public and private space shall be clearly defined and open spaces must have features which prevent unauthorised vehicular access. Communal spaces as described above should not immediately abut residential buildings.
• SP 5 - South Wales Police would recommend that all new public space is designed to Secured by Design standards (Residential) Guide. Use the ‘Safer Parks’ document (research by ‘Make Space for Girls’) to design safe communal spaces. Designing Out Crime officers should be consulted at pre planning stage to give their recommendations for communal space.
Reason: To enhance community safety and prevent antisocial behaviour.
3. Homes for all
Policy 7- Delivering Affordable Homes
The Vale of Glamorgan Housing Strategy 2021-2026
The strategy includes a long-term vision for housing in the Vale where “All residents in the Vale of Glamorgan have access to good quality, suitable housing and can live happily and independently in vibrant, sustainable communities.”
• Aim 1: More Homes, More Choice.
• Aim 2: Improved homes and communities.
• Aim 3: Better housing advice and support.
• Aim 4: Equality of access to housing and housing services.
‘The Vale has a significant need for affordable homes, with affordable housing need remaining one of the highest in Wales, even though the Vale is one of highest performing authorities in Wales in terms of affordable housing delivery. Using the principal projections, the Council’s 2023 Local Housing Market Assessment (LHMA)
identifies a need for 1,075 affordable homes per annum over the 5-year period 2023-2028 and 154 affordable homes per annum for the following 10 years.’
Ensure that all new residential developments provide high quality housing that includes the right mix, tenure and type of homes that respond to the changing needs of the Vale’s population. This includes homes that are affordable, accessible and adaptable for people of all ages and that address the identified accommodation needs of all the Vale’s communities through all stages of life.
The Vale of Glamorgan Older Persons Housing Strategy
2.84 The Council’s Older Persons Housing Strategy ‘Creating Homes and Neighbourhoods for Later Life 2022-2036’ sets out a vision for the Vale of Glamorgan which seeks: ‘to secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.”
All Welsh Government grant funded housing refurbishments must comply with the Development Quality Requirement (DQR) and achieve Secured by Design Silver award.
South Wales Police would ask that all new developments are designed and built to Secured by Design standards this includes roads, paths, lighting, defensible space and house types/ standards. We would ask that at the pre planning advice is sought from the Designing Out Crime Officer to advise on crime prevention through environmental design.
Violence Against Women and Girls:
The harm caused to victims and society by violence against women and girls (VAWG) in all its forms, including but not limited to, harassment, stalking, rape, sexual assault, murder, honour-based abuse and coercive control is incalculable. While men and boys also suffer from many of these forms of abuse, they disproportionately affect women.
In spring 2023, the Home Secretary announced Violence Against Women and Girls as a national threat and included it within the 9 Strategic Policing Requirement (SPR) alongside terrorism, serious and organised crime, and child sexual abuse.
Secured by Design can assist with ensuring that the built environment in all its forms is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise, for all. The importance of this is outlined within the National Police Chiefs’ Council’s (NPCC) ‘Policing Violence Against Women and Girls – The National Framework for Delivery: 2024 – 2027’ under the ‘Prevent’ element of the strategy; outlining the need for building safer spaces and places. Further information is available at:
https://www.npcc.police.uk/SysSiteAssets/media/downloads/our-work/vawg/vawg-framework-fordelivery.pdf
South Wales Police recommendations:
• SP 6 - All Welsh Government grant funded homes MUST meet Secured by Design Gold or in the case of a refurbishment Silver. Consultation with the Designing Out crime Officer should take place at the pre planning stage when an application for Secured by Design should also be made.
• SP6 - HOUSING REQUIREMENT - Where a change of use/ mixed use retail, community leisure and active travel routes are planned Secured by Design Residential and Commercial guides should be applied. Early consultation with Designing out crime officers particularly in the Town Centres is recommended.
• SP6 - HOUSING REQUIREMENT - Designing Out Crime Officers should be consulted at the concept stage of a development, where there are 10 or more housing units and in the case of commercial space 1000 square metres.
• SP6/ HG 7 - HOUSING REQUIREMENT - South Wales Police Designing Out Crime Officers to work in partnership with the Vale of Glamorgan Council Planning Department to compile a specific planning guidance in relation to Houses of multiple occupancy.
• SP6 - HOUSING REQUIREMENT- South Wales Police would ask that all flats/ apartments’ conversions meet WDQR (Welsh Design Quality Standards) and achieve at least a Secured by Design silver award.
• SP6 - Housing Requirement - In the case of the change of use of residential land or properties, South Wales Police would ask that any change of use application is sent to South Wales Police Designing out crime officers.
• SP 6 - South Wales Police are involved in discussion with the Vale of Glamorgan Planning Department and the compilation of Specific planning guidance to cover co-living and similar shared facility developments.
• SP6 - HOUSING REQUIREMENT -Where co- living developments are proposed to deliver a balanced housing mix. South Wales Police would ask that the pre planning discussions take place with the Designing Out Crime officer and that the development is built to Secured by Design standards as set out in the most current Secured by Design Residential Guide.
• SP3 – DEVELOPMENT IN THE COUNTRYSIDE (Policy GT1/ SP9 – Gypsy and Traveller Site Provision). The site is reasonably accessible to essential services and facilities such as healthcare, education, employment, and public transport. Safe and appropriate vehicular access can be provided from the highway network, and the site layout affords adequate provision for parking, turning, servicing and emergency vehicle. South Wales Police would ask that they consulted to provide Secured by Design advice at the pre planning stage of any such development.
• HG6 – PROVISION OF SPECIALIST ACCOMMODATION
The accommodation is appropriately designed to meet the specific needs of the intended residents, including older people, people with disabilities, those with mental health needs, and other vulnerable groups. The development is located in an accessible and sustainable location, with good access to public transport, community facilities, health services, and local amenities –
-All specialist housing is built to Secured by Design and South Wales Police are involved at the pre planning stage of specialist developments.
• The Vale of Glamorgan Older Persons Housing Strategy:
‘To secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.”
HG 6 - All older person’s housing to be built to Secured by Design standards and pre application consultation with Designing Out Crime Officers.
• HG7 - HOUSES IN MULTIPLE OCCUPATION (HMO’s)
South Wales Police would ask that they work in partnership with The Vale of Glamorgan Planning Department, to develop a specific planning Guidance in relation to Houses of Multiple Occupancy.
• SP3 - Development in the Countryside Affordable Housing (Policy HG5) – Consultation takes place. Where, developments are planned outside the specific main areas South Wales Police would ask that they are consulted about the proposed infrastructure and design of such developments. - Early consultation is recommended with Designing Out Crime officers and South Wales Police Traffic Management.
• PGD 2 /SP 4 - ‘Ensure major new development is directed to locations that are or will be by the time of initial occupation easily accessible by walking, cycling, and public transport.’- Early consultation with South Wales Police Designing Out Crime Officers and South Wales Police Road Traffic Management Department where roads and pathways are planned to be built.
• SP5 – Creating Healthy and Inclusive Places and spaces: Ensuring development proposals are designed to facilitate accessible healthy environments to address relevant determinants of health positively, particularly in response to local health needs; • Ensuring that all places and developments are as inclusive as possible, capable of adapting to a broad range of changing needs and delivering a high quality of life. – Designing Out Crime Officers are consulted at pre planning to ensure public space is designed to ensure the space is safe and inclusive for all and especially vulnerable groups. (Safer Parks Document, Angelini Enquiry).
• SP 4 - Supporting the provision of new and enhanced community and healthcare facilities: Where Health care facilities are proposed South Wales Police would ask that Secured by Design Commercial Guide /Hospitals Guide are followed and that the Designing Out Crime officer is consulted at the pre planning stage.
• SP19 – Waste management: Secured by Design guides give guidance in respect of waste management and storage. South Wales Police would ask that pre Planning advice is sought in respect of new developments and waste management.
Reason: To enhance community safety especially vulnerable groups.
4. Placemaking and Good Design
Future Wales - The National Plan 2040 (Welsh Government, February 2021)
Policy 2 - Shaping Urban Growth and Regeneration - Strategic Placemaking
The Placemaking Charter and Placemaking Plans:
Signatories to the Charter agree to promote the following principles in the planning, design and management of new and existing places:
• People and community.
• Location.
• Movement.
• Mix of uses.
• Public Realm
• Identity.
SP4 – PLACEMAKING
Development will be required to follow Placemaking principles by:
1 Ensuring high quality sustainable design that reflects local distinctiveness, character, and cultural identity.
2 Prioritising the determinants of health and well-being during the design process.
3 Creating a diverse mix of uses and multi-functional spaces.
4 Contributing to a vibrant, safe and inclusive public realm that encourages Active Travel, supports public transport use and reduces car dependency.
5 Strategically integrating Green Infrastructure networks and open space into development, delivering social, environmental and ecological benefits.
6 Providing a range of housing types and tenure.
7 Locating development appropriately where homes, local services and facilities are accessible and well connected and integrated with existing communities.
8 Developing high densities where appropriate, making the most efficient use of land and supporting mixed uses.
9 Protecting or enhancing the Historic Environment and its setting. Placemaking Statements will be required for all major developments setting out how the proposal accords with Placemaking Principles. In the towns of Barry, Cowbridge, Llantwit Major and Penarth Placemaking Statements should also have regard to the adopted Placemaking Plans for the area.
Designing Out Crime officers’ recommendations:
• SP 4 / PGD 1/ CC 4 - Research shows that Secured by Design developments are sustainable and reduce the carbon footprint. The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage It also has a significant impact on anti-social behaviour. South Wales Police ask that all new developments are built to Secured by Design standards and that they are work with The Vale of Glamorgan planning Department at the pre planning stage.
• SP 4 / PGD 1 -When designing developments road, paths and green space, South Wales Police would ask that the developments are built to Secured by Design standards. We would ask that Designing Out Crime Officers and South Wales Police Traffic Management Department are involved in the pre planning stage.
• PGD 2 /SP 4 - It is important when designing roads and footpaths to maximise the benefits of passive surveillance, and furthermore, when addressing safety and security of street layouts, public realm, and footpaths, that Secured by Design guidance is followed, this includes landscape design, lighting, layout of buildings, etc. to ensure that all roads and footpaths (including public rights of way) are safe, secure, and accessible for all, in support of the Violence Against Women and Girls (VAWG) agenda. Where a mix development e.g. housing and retail/other use (with ten or more units) applications should be referred the designing out crime at the pre planning stage.
• SP4/ PGD1 - Contributing to a vibrant, safe and inclusive public realm - Where active travel routes are being planned, South Wales Police Traffic Management Team should be consulted throughout the planning process.
• PGD1- Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance. Secured by Design considers natural surveillance and the placing of communal spaces and provision provided. All mixed uses and multi-functional) developments should be discussed at the pre- planning stage with the Designing Out Crime Officer.
• PGD 2/ SP 4 - Developing high densities where appropriate, making the most efficient use of land and supporting mixed uses. Work in partnership with Designing out crime officers to write a ‘Houses of multiple occupancy’ Specific Planning Guidance.
• SP 4 - Strategically integrating Green Infrastructure networks and open space into development, delivering social, environmental and ecological benefits. Where public realm is being planned to include active travel routes, designing out crime officers and Counter Terrorism Security Advisors should be consulted if the space falls under The Terrorism (protection of premises)Act 2025 .
• SP 4 -When planning parks and community space. Public consultation should took place, and the plans referred to the designing out crime officer. (The ‘Safer Parks’ research by Making space for women is a document that can offer up to date advice in relation to safety/ and inclusivity).
• SP 1- When designing new schools early consultation with the South Wales Police Designing out crime officer and Traffic Management officers is prudent to ensure the safety of pupils. Achieving Secured By Design accreditation for the school will ensure that the school is planned and built with safety in mind from the outset. All schools should achieve SBD GOLD.
• HG 6 - The Vale of Glamorgan Older Persons Housing Strategy 2.84 The Council’s Older Persons Housing Strategy ‘Creating Homes and Neighbourhoods for Later Life 2022-2036’ sets out a vision for the Vale of Glamorgan which seeks: ‘to secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.”
• The Vale of Glamorgan Older Persons Housing Strategy 2.84 The Council’s Older Persons Housing Strategy ‘Creating Homes and Neighbourhoods for Later Life 2022-2036’ sets out a vision for the Vale of Glamorgan which seeks: ‘to secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.” - Developments, for older residents are built to Secured by Design standards as per the Secured by Design Residential Guide.
• SP4 - Protecting or enhancing the Historic Environment and its setting: Secured by Design can be applied to historic building, contact should be made at the pre planning with the Designing Out Crime Officer.
• PGD1- Creating safe, accessible, integrated, inclusive and active environments that make efficient use of land and promote opportunities for Active Travel, and promote sustainable transport choices – Early liaison with South Wales Police and South Wales Police Traffic Management Officers so that designs can be agreed and are safe.
• SP 1 - A number of new primary and secondary schools have been developed across the Vale as part of the Sustainable Communities for Learning Programme (previously known as 21st Century Schools), with further plans as part of the programme progressing – Consultation should be sought from South Wales Police Designing Out Crime Officers and Road Traffic Management Officers at the pre planning stage planning stage with the Vale of Glamorgan Council.
• PGD 1 Incorporating sustainable design and construction solutions to maximise energy efficiency and positively contributing towards climate change resilience and adaptation. The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage (Note 1.5). It also has a significant impact on anti-social behaviour. Therefore, there are substantial carbon cost savings associated with building new homes and refurbishing existing homes to the SBD standard i.e. less replacement of poor-quality doors, windows and the stolen property from within the home as a result of criminal acts. - All developments are built to secured by Design to reduce the carbon footprint.
• PGD1 Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance - Facilities shall be designed to allow natural surveillance from nearby dwellings with safe and accessible routes for users to come and go. Boundaries between public and private space shall be clearly defined and open spaces must have features which prevent unauthorised vehicular access. Communal spaces as described above should not immediately abut residential buildings – Consultation with Designing Out Crime Officers and the community should take place at the pre planning stage to develop safe, inclusive spaces.
• C I3/SP13 – NEW COMMUNITY FACILITIES – Consultation should be sought from Designing out crime officers where schools/ colleges are proposed and they should meet Secured by Design Gold.
• Town Centre First SP11 - The town centre of Holton Road in Barry and the District Centre of High Street had higher than average vacant units. There is a need to ensure that future policies allow for flexibility for a greater range of uses that would be acceptable within a town centre, in line with the town centre first principle and the need to create vibrant places. South Wales Police would ask that they are consulted and are able to give advice where policies are developed for town centres. We would also ask that Designing Out Crime Officers are consulted at the pre planning stage.
• PGD1/SP 11 - Making a positive contribution to the character of the area, responding to the local context and character through building forms and scale; materials and features, mix of uses, landscape, density, and connectivity of streets and spaces to create and/or enhance locally distinctive design and character - Designing out crime officers should be consulted at pre planning stage to ensure safe spaces.
• PGD1/SP11/SP13 - Demonstrating that traffic movements to and from the development can be accommodated, resolved, or mitigated to an acceptable degree, and where car parking is provided, this must be sensitivity integrated into the development so that it does not dominate the layout of the development: South Wales Police Traffic Management Department to be consulted by the Vale of Glamorgan Highways Department in respect of road layout/active travel routes at the pre planning stage.
• PGD1- Ensuring that public open space, private amenity space and cycle and car parking in accordance with the Council’s standards – Where Public open space is being designed, the duty from The Terrorism (protection of premises)Act 2025 should be applied where a premises meets the standard as above. South Wales Police Designing out crime officer should be consulted at the pre planning stage to advice.
• SSC 1/ PG 1 - Car parks are designed and built to ‘Park Mark’ standards as per Secured by Design Non – Residential (Commercial)Guide.
• PGD1/CC1/ SP19 – Creating well designed and inclusive facilities - ‘Providing high quality multi-functional green open spaces which can provide a choice and range of activities, including play, that also deliver enhanced biodiversity and flood mitigation and are designed to be resilient to climate change and adaptable overtime.’: Consultation with the community should be sought from the outset. Parks and green spaces must be designed with safety being the key driver especially for vulnerable groups such as women and girls (Safer Parks document). Designing Out Crime Officers should be consulted at the pre planning stage to achieve this.
• PGD1 Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance.
(As above)
• PGD1: Demonstrating that traffic movements to and from the development can be accommodated, resolved, or mitigated to an acceptable degree, and where car parking is provided, this must be sensitivity integrated into the development so that it does not dominate the layout of the development – South Wales Police Designing out crime officers and Traffic Management Officers to be consulted on the layout of developments at pre planning stage.
• TR1/SP 10: Future plans for the continued regeneration of the Waterfront include the redevelopment of the Mole for apartments, a linear park and water sports centre – South Wales Police would ask that Designing Out Crime and Road Safety Management Officers are involved where redevelopment is to take place, consultation should be sought at the pre planning stage.
• RC52 – Edge of town centre retailing: South Wales Police would ask that the Designing out crime and traffic management officers are contacted in respect of new developments and the travel routes to them.
• EMP2 - MOD St Athan - New development within or adjoining MOD St Athan that is demonstrated to be required for operational defence and security purposes, and helps enhance or sustain their operational capability, will be supported in principle. – Advice should be sought from Counter Terrorism Wales and Designing Out Crime officers where redevelopment of/ adjacent to MOD St Athan is planned.
• SP15 – Sustainable Tourism: Promoting opportunities for visitors to engage in forms of tourism that have a low impact on the environment; 2 Protecting and enhancing existing tourism attractions and leisure facilities; 3 Enhancing the visitor economy, attracting local investment, providing local employment opportunities and contributing to rural diversification; 4 Recognising and protecting the Vale’s distinct local identity, built and natural environment as assets to tourism; Providing a variety of tourism opportunities, particularly through all year round facilities and a range of appropriately located visitor accommodation; and 6 Encouraging tourism visits to be made by active and sustainable transport modes – Designing Out Crime Officers advice and advice in respect of Crowded Places to be sought at the pre planning state of any event.
• CI4 – Protecting and enhancing existing community facilities: Proposals for new community facilities or proposals which seek to retain, enhance or maintain existing community facilities will be supported. This includes the provision of multi-use community facilities, including the colocation of healthcare, schools, libraries and leisure facilities – South Wales Police would ask that all new community facilities plans are referred to the Designing Out Crime Officer and Counter Terrorism Wales for early consultation.
Reason: To ensure all public realm is safe, espcially for vulnable groups such as women and girls.
5. Protecting and enhancing the natural environment
Ecological Networks and Green Infrastructure
Project Zero - The Vale of Glamorgan Council’s Climate Change Challenge Plan 2021-2030
The Vale of Glamorgan Local Area Energy Plan (2024)
Maximise reduction in carbon emissions across all activity. • Improve efficiency to reduce energy demand.
Work towards new and existing buildings becoming low carbon prioritising inclusivity, equality, and fairness.
The LAEP is a live document which should be updated every 5 years. It identifies the following priority areas that will be the focus in the short term to assist in setting the Vale on the pathway to net zero: • Making homes low carbon.
Crime committed in 2011 in England and Wales is estimated to have given rise to over 4 million tonnes CO2e, equivalent to emissions of around 900,000 UK homes. Burglary resulted in the largest proportion of the total footprint (30%) due to large volume of offences and the carbon associated with replacing stolen or damaged goods.
Source: “Addressing the Carbon-Crime Blind Spot - A Carbon Footprint Approach” (2016). Helen Skudder, Professor Angela Druckman, Jon Cole, Alan McInnes, Dr Ian Brunton-Smith, Dr Gian Paolo Ansalon.
The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage (Note 1.5). It also has a significant impact on anti-social behaviour. Therefore, there are substantial carbon cost savings associated with building new homes and refurbishing existing homes to the SBD standard i.e. less replacement of poor-quality doors, windows and the stolen property from within the home as a result of criminal acts. This has been achieved through adherence to well-researched and effective design solutions, innovative and creative product design coupled with robust manufacturing standards.
Research documentation can be found on the SBD website at: https://www.securedbydesign.com
South Wales Police would ask that Designing Out Crime Officers are consulted to work in partnership with the Vale of Glamorgan Council to reduce the carbon emissions through building to Secured by Design Standards.
Policy 12 - Regional Connectivity
A feasibility study for a new station at St Athan was completed in 2022, which identified four potential site locations for a new station to the south of St Athan.
South Wales Police Recommendations:
• SP10 – Sustainable transport - Ensuring that the design of new developments encourage walking, cycling and public transport use as alternatives to private car use, as well as encouraging options such as mobility hubs and shared car use – South Wales Police Traffic Management Department should be consulted to ensure that sustainable transport links are safe. If these links are rail, then the British Transport Police Designing out crime officer should be contacted at the pre planning stage.
• SP16/CC1 – Net zero carbon developments: pre application consultation from South Wales Police and all new developments to meet Secured by Design.
• CI1/CC1/ SP19 – Open Space Provision: Areas of open space will normally be required to be provided on-site as part of new development proposals. Where it is not practical to make provision on-site, appropriate off-site provision or financial contributions for improvements to existing facilities will be required in lieu of on-site play, outdoor sports provision, or amenity greenspace.
• DNP7 – DARK SKIES: Secured by Design can assist with ensuring that the built environment in all forms, is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise. South Wales Police would ask that Designing Out Crime Officers are involved at the pre planning stage with the Highways Department at The Vale of Glamorgan Council and developer to discuss and be able to make recommendations in relation to lighting.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6725
Derbyniwyd: 10/03/2026
Respondent ID: 2397
Ymatebydd: Cardiff and Vale University Health Board
SP10 Sustainable transport: We support these policies, and suggest the plan is
explicit that all new active travel infrastructure should meet the statutory Active Travel
Act guidance (Link: https://www.gov.wales/sites/default/files/publications/2022
01/active-travel-act-guidance.pdf) and also that infrastructure should be built to a specification to ensure resilience as extreme weather events increase, preventing
flooding and making use more comfortable during hot weather (such as shading from trees).
We note the absence of reference to people living with disabilities and suggest adding 'wheeling' as well as walking and cycling.
The overall contribution to health and wellbeing of the Deposit RLDP is positive and there are opportunities to develop further detail through the supplementary planning
guidance (SPG) proposed. We are keen to ensure that these SPG’s are progressed within the short-term and that Cardiff and Vale University Health Board (CAVUHB) are
involved in the development of some of these. The content and application of the SPG’s will be fundamental to the effectiveness of several of the policies identified in the
deposit plan. These must be supported by effective processes and relationships that ensure the intentions for positive contributions to health and wellbeing are delivered.
The Deposit RLDP provides a strong framework for placemaking, climate action, and healthy communities. Opportunities exist to further embed healthy and sustainable food systems as essential spatial infrastructure rather than solely as community
amenity or retail management issues. Strengthening policy wording in areas such as placemaking, rural diversification, employment land, green infrastructure, and community infrastructure would better align the Deposit Plan with the Well-being of Future Generations Act, Planning Policy Wales Placemaking agenda, and emerging Welsh food system strategies. This is particularly relevant as the Future Generations Commissioner named his first priority area in office being food, and the Welsh Government has recently published its Community Food Strategy. The Future Generations Office also recently produced guidance for local authorities including several planning-related recommendations.
The following comments are provided in the order they appear in the document:
Spatial strategy: SP1 - Sustainable growth: While the plan addresses overall growth distribution, it does not consider how development affects local food resilience, including the protection of agricultural land, peri-urban growing spaces, or local supply chains. There is no strategic reference to food as a component of sustainable, resilient
communities. The vision and strategic objectives currently contain no mention of ‘food’ or ‘farming’.
Request to add reference (Spatial strategy or Strategic objectives section) to supporting resilient and sustainable local food systems in spatial strategy principles, including protection of productive land and support for local supply chains. Suggested wording includes: “The Local Development Plan will support resilient and sustainable
local food systems by safeguarding productive agricultural land, promoting peri-urban food growing opportunities, and facilitating local food supply chains as an integral part
of sustainable growth.”
SP4 Placemaking: Placemaking principles are clear and it is encouraging that prioritising the determinants of health and wellbeing during the design process are included as one of the principles. The placemaking statement forming part of the Design and Access statement is welcome to ensure any proposal aligns with the principles. The placemaking SPG will be key to consolidate guidance on physical activity, transport, climate resilience, mental wellbeing, access to food and food production, and inclusive design. Whilst this section focuses on design quality, density, and public spaces it does not explicitly incorporate food production or edible landscaping. Opportunities for multifunctional green spaces that produce food are missed, which could support local
diets, biodiversity, and community engagement. Suggestion to include wording to support multi-functional green infrastructure consistent with placemaking principles:
“Development proposals, where appropriate, should incorporate productive landscapes, edible landscaping, rooftop or community growing spaces, and other
opportunities for local food production as part of multifunctional green infrastructure.”
SP5 Creating Healthy and Inclusive Places and Spaces: CAVUHB support the statement that 'Developers are required to undertake a screening assessment of their
proposal at the pre-application stage to identify the potential health impacts of their development'. CAVUHB agrees with the criteria set out in the table and would like to see examples/further guidance of 'other' developments where there is likely to be a significant impact on health and wellbeing. HIA should also consider the cumulative
impact across multiple smaller developments in the same area, and whether they trigger thresholds collectively.
6.54 We suggest adding the word 'abilities' to the sentence '...enabling people of all ages, backgrounds and abilities to live in an environment that will support them to live
full, productive and prosperous lives.'
6.60 We welcome the requirement for new developments to conduct screening at the pre-application stage using the Council's Health and Wellbeing checklist and the rapid
HIA. We are keen that CAVUHB are involved in the development of the Healthy Placemaking SPG to consider how submitted HIAs will be assessed by the Council to
ensure Developers submit a quality HIA and implement the conclusions.
6.61 Amendment to organisation titles to: Cardiff and Vale University Health Board and Wales Health Impact Assessment Support Unit (Public Health Wales).
6.62 Wales Health Impact Assessment Support Unit has recently released guidance on HIA - see https://phwwhocc.co.uk/whiasu/ for more information and toolkits to ensure most up to date is in use.
6.63 Suggestion to amend the paragraph to include reference to 'access' to services, for example 'A further role of the RLDP is to support the access to and delivery of community, health and social care and wellbeing services within the community..'.
6.65 Suggestion to change wording from 'encouraged' to 'expected' for example:
Developers are expected to engage with the Health Board at pre-application stage to enable due consideration of healthcare infrastructure requirements.' The requirement
for HIA will assist with this expectation.
Key housing sites (HG1 KS1 onwards): The Key Site requirements reference “enhancements to leisure, sport and recreation spaces”. Without quantified standards or phasing triggers, however, these requirements may be difficult to enforce consistently at the planning application stage. Clear policy hooks or supporting standards prior to submission would strengthen implementation. It is recommended that the Key Site schedules include minimum on-site provision standards and delivery
phasing obligations to ensure that both sport infrastructure and recreational space provision keep pace with the additional demand generated by future population
growth.
SP11 Retail, commercial and service centre hierarchy and RCS1 Resilient retail, commercial and service centres: This policy focuses on hierarchy and vitality of retail
centres but fails to actively support the resilience of local retail, through measures which support local food markets, small-scale fresh food retailers, or local producer
supply chains. This limits opportunities for strengthening local food economies.
It is important that the need for convenience food retail space within Barry, Penarth and Llantwit Major, recognised in SP11, is matched with this rational for ‘local affordable food’ outlined in SP5.
Consider adding: “The Council will support local food markets, cooperative food retail, and initiatives that strengthen local producer supply chains within town and service centres, in line with the Town Centres First approach.”
RCS3 - hot food takeaways: CAVUHB commends the recognition that the clustering of unhealthy food outlets is a significant health issue and supports the proposals to
consider controls on takeaway proliferation (RCS3). This will support the creation of healthy environments, a commitment within the Cardiff and Vale Good Food and
Movement Framework endorsed by RPB. Health and inclusion policies mention general wellbeing but do not specifically address access to healthy food, food deserts, or distribution of retail providing fresh/local food, especially in new or expanding residential areas.
Proposal to include criteria for equitable access to healthy food and community food infrastructure in development proposals, such as: “Major developments should demonstrate equitable access to healthy food outlets, community growing facilities, or other community food
infrastructure within walking distance of new residential areas.” This addresses diet related health inequalities, encourages healthier communities and aligns with HIA
guidance.
EMP6 Rural diversification: The plan frames food production predominantly as a community activity rather than recognising its commercial, economic, and supply
chain potential. This limits opportunities for climate-resilient rural economies in a county with such a rural character as the Vale. Policy supports general rural business diversification but does not explicitly enable
agro-ecological practices, local food processing, CSA (community-supported agriculture), or other sustainable farming models.
Proposal that the plan should explicitly support sustainable, commercially viable local food enterprises as legitimate rural employment uses - to include the following wording: “Rural diversification proposals that support agro-ecological farming, sustainable local food production,
community-supported agriculture, and short supply chain enterprises will be supported where compatible with landscape and environmental considerations.”
SP10 Sustainable transport: We support these policies, and suggest the plan is explicit that all new active travel infrastructure should meet the statutory Active Travel
Act guidance (Link: ttps://www.gov.wales/sites/default/files/publications/2022
01/active-travel-act-guidance.pdf) and also that infrastructure should be built to a specification to ensure resilience as extreme weather events increase, preventing
flooding and making use more comfortable during hot weather (such as shading from trees). We note the absence of reference to people living with disabilities and suggest adding 'wheeling' as well as walking and cycling.
SP13 Community infrastructure and planning obligations:
We want to take this opportunity to highlight the challenges that population growth places on healthcare
services. The projected level of population growth identified within the RLDP will have an impact on the CAVUHB's community healthcare facilities and infrastructure. Please refer to the information provided as part of the background evidence paper titled 'BP37
Primary, Community and Intermediate Health Care 'for more detail on the CAVUHB response which identifies there is limited scope for the current infrastructure within
existing GP premises to absorb the LDP growth. CAVUHB recognises the need to prioritise the expansion of the existing estate (where feasible) or support new
developments to take forward its strategic objectives.
Open space and recreation (CI1 and CI2): The evidence base supporting the sport and recreation elements of Policies CI1 and CI2 could be strengthened. At present
there does not appear to be a full Open Space Assessment setting locally-derived standards, nor a Playing Pitch Strategy nor Indoor Sport Facility Assessment. The Cardiff and Vale of Glamorgan Sports and Physical Activity Facilities audit report is
currently underway (with completion anticipated in May 2026), which should make a useful contribution to the evidence base once available.
Community Facilities: this policy focusses on schools, healthcare and social infrastructure, but does not include food-related community facilities such as kitchens, food hubs or education centres. Proposal to include the following information: “Community facilities should include, where appropriate, community kitchens, food hubs, educational facilities for food skills, and other infrastructure that enhances local food resilience and social cohesion.”
There is no reference to the expectation that local communities are consulted in relation to the development of community facilities. We would like to see a
requirement for community engagement and that such developments are based on a detailed understanding of existing community strengths, assets, needs and
challenges. This might be achieved as part of the HIA which includes stakeholder engagement.
SP14 Employment Growth: Employment land allocations focus on general industrial and office uses, with no explicit support for food hubs, processing, or logistics facilities
that would enable local food supply chains. Again, in an agricultural county such as the Vale, and given Wales’ push for local supply resilience, this is a major opportunity gap. Consider including the following wording:
“Employment land allocations should consider the needs of food processing, distribution, and logistics facilities that support local and regional food supply chains.” This supports local supply chain development, reduces food miles and provides local employment opportunities, Welsh Government evidence highlights the importance of food processing in local supply resilience.
SP19 Green infrastructure: this policy emphasises the biodiversity, climate adaptation and recreation, but does not explicitly recognise productive landscapes or
urban agriculture as part of the multifunctional green infrastructure.
Suggested wording: “Green infrastructure networks should recognise and integrate food productive landscapes, urban agriculture, and community growing spaces as multifunctional components contributing to biodiversity, climate adaptation, and wellbeing.”
SP16 Climate change: this policy addresses migration and adaptation but omits food systems. It also does not recognise the emissions reductions from local food
production, short supply chains or sustainable farming practices.
Consider including the following wording: “Development proposals should encourage short supply chains, low-carbon farming methods, and local food production where feasible, in order to support climate change mitigation and adaptation objectives.”
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6784
Derbyniwyd: 11/03/2026
Respondent ID: 1068
Ymatebydd: Persimmon Homes (East Wales)
Asiant : Boyer Planning
Persimmon support the overall objective of Policy SP10 in seeking to promote sustainable transport, increase active travel opportunities and reduce reliance on the private car in accordance with national placemaking objectives.
This submission relates to the site known as ‘Land North of Dinas Powys’ and builds upon previous responses provided in respect of the Call for Sites exercise in September 2022 and more recently Preferred Strategy in February 2024.
For context the site is identified as part of Candidate Site Ref. No 444 within the latest Candidate Sites Assessment (Background Paper – BP18A) which has been published as part of the supporting evidence base.
As you are aware to date Persimmon have presented, what is in effect, two options for the development of the site with a Smaller Option (extending c13ha) and an Extended Scheme (extending to c31ha). Whilst there are significant benefits of both schemes this representation will focus on the smaller option which has been identified as a proposed site allocation for residential development within the Deposit under Policy HG1 – KS2 ‘Land North of Dinas Powys’.
Having reviewed the Deposit Plan it is evident that the document is structured around a number of key themes/ sections. For convenience this submission discusses each of which in chronological order and should be considered in conjunction with the accompanying technical reports/ plans provided to date.
The overarching purpose of which shall be to respond to the relevant draft Replacement Local Development Plan policies, with particular consideration given to the Welsh Government’s tests of soundness as set out within the Development Plan Manual for Wales (Third Edition) March 2020)):
• Test 1 – Does the Plan Fit?
• Test 2 – Is the Plan Appropriate?
• Test 3 – Will the Plan Deliver?
Section 3: Key Characteristics
Settlement Pattern
In principle, Persimmon support the Settlement Pattern as set out in Section 3 and in particularly the identification of Dinas Powys as a Primary Settlement.
Paragraph 3.9 explains that primary settlements “offer several key services and facilities, which are vital to their role as sustainable communities, as they reduce the need to travel to Barry or the Service Centre Settlements to address day-to-day needs”.
The importance of the Primary Settlements in supporting the Service Centre Settlements is noted, however Persimmon consider that Dinas Powys, in particular, is capable of a higher role/ function and thus accommodate even further levels of growth. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
Housing Market and Housing Need
In light of the Vale of Glamorgan’s strategic location in-between Cardiff and Bridgend, and the significant employment opportunities associated with these areas, the Deposit RLDP should seek to maximise housing provision to ensure a more sustainable balance is achieved between homes and jobs, and in turn reduce commuting distances/ carbon emissions.
Paragraph 3.18 clearly acknowledges the scale of affordable housing need, identifying a requirement for 1,075 affordable homes per annum between 2023–2028 and 154 per annum thereafter. Yet it remains unclear whether existing unmet need has been fully factored into the overall housing requirement presented within the Deposit RLDP. This is particularly importance in the context of the Welsh Government’s 2025-based estimates which identify 9,400 units of unmet need at a national level and a requirement for 8,700 additional homes per annum over the next five years simply to address newly arising need.
Accordingly, there is a compelling justification for a further uplift in housing numbers to ensure the Plan proactively addresses both existing and emerging need. Increasing the overall housing requirement would directly enhance the overall delivery rate for affordable homes which is crucial in a local authority area with the highest affordability ratio in Wales. Paragraph 3.17 confirms that in the Vale average house prices are 9.7 times average workplace earnings compared to the Wales average of 6.1, therefore a step change in housing targets is needed to support a more balanced housing market across the region.
Section 4: Key Themes, Vision & Objectives
Key Themes
Persimmon supports the theme ‘Homes for all’ and the need for the housing supply to respond to the growing population and provided in appropriate locations, with a mix of tenure and types. In that respect site Land north of Dinas Powys provides an opportunity to ensure future residential development aligns with such objectives to deliver high quality housing development in a sustainable location, whilst also facilitating additional services and facilities as part of the proposed offer.
In principle, Persimmon support the ‘Placemaking’ theme and consider that the proposed allocation in Dinas Powys shall ensure a strong sense of identity is achieved.
Persimmon also support the theme of ‘Promoting active travel and sustainable transport choices’, and highlight that the proposed residential development at Dinas Powys clearly further assists in ensuring that the new development be in a highly sustainable location with very good access to alternative transport, other than the private car.
Vision
In general, Persimmon support the RLDP Vision, however highlight that whilst Barry and other Sustainable Service Centres are identified as playing a vital role in delivering the strategy, the importance of the ability for Primary Settlements to deliver sustainable and high-quality residential development also needs to be suitably recognised.
The site Land north of Dinas Powys clearly aligns with the Council’s ambition to ensure future growth delivers homes which caters for all (including affordable homes) and are prioritised in areas of greatest demand. Whilst simultaneously facilitating much needed additional infrastructure improvements to further enhance Dinas Powys’ role as a Primary Settlement thereby supporting both existing and future residents.
In light of the above it is considered that Dinas Powys plays a significant part in delivering the Council’s strategy and the role, function, and ability of this settlement to accommodate growth needs to be significantly reinforced. The settlement is capable of accommodating more growth in a highly sustainable location we believe warrants greater recognition within the vision itself.
Strategic Objectives
Objective 3 – Home for All
Persimmon supports the principle of Objective 3, in particular the provision of high quality housing which includes the right mix, tenure and type. Persimmon supports the notion of providing residential development in places which people want to live, and in particular Dinas Powys as a Primary Settlement.
Objective 4 – Placemaking
As above, in principle Persimmon support the Council’s placemaking objectives which seeks to ensure all development will contribute positively toward creating a sense of place. Most notably this involves prioritising future growth in sustainable locations which are placed to create attractive, safe and accessible schemes that are equally effective from a functional standpoint.
Our site in Danis Powys aligns with such principles whilst also providing an opportunity to facilitate a logical extension to the existing urban form and in doing so meet local need in a sustainable matter. The scope of which includes full market and affordable housing in accordance with proposed policy requirements along with ample public open space, active travel links via dedicated pedestrian footpaths and cycleways and SuDS features.
Objective 8 – Promoting Active and Sustainable Travel Choices
Persimmon supports the principle of promoting active and sustainable travel choices and highlight that their residential development at Dinas Powys has been designed to ensure accessibility it’s at the heart of the scheme with regards to walking, cycling and connectivity to public transport.
Moreover, the proposed allocation would also facilitate both on-site and off-site infrastructure improvements further enhancing the existing excellent accessibility to Eastbrook Station. Therefore, providing an opportunity to encourage a modal shift towards more active forms of travel and consequently reducing dependency on private vehicle and associated carbon emissions. From a plan-making standpoint the proposed allocation at Land north of Dinas Powys (HG1 KS2) is therefore crucial to ensure growth is prioritised in such a highly sustainable location and maximise opportunities for greater connectivity at both a regional and local level.
Section 5: Sustainable Growth Strategy
RLDP Sustainable Growth Strategy comprises six key elements as follows:
1. Delivering a sustainable level of housing and employment growth supported by appropriate infrastructure that accords with the Vale’s position within the Cardiff Capital Region (CCR).
In order to meet the overarching Vision, the Vale have identified a need to deliver at least 8,679 new dwellings over the proposed plan period which responds to the identified housing requirement of 7,890 homes (526 per annum) and incorporates a 10% flexible allowance. Persimmon support the proposed approach, however maintain it should be considered a minimum figure with aspirations to achieve greater levels of growth in sustainable locations across the district.
Whilst we appreciate these figures are based on average completion rates over the first ten years of the adopted Local Development Plan. It is important to recognise that a higher rate of housing delivery is demonstrably achievable. Annual completion rates peaked at 917 dwellings, with six of the ten monitoring years exceeding the 526 per annum figure currently relied upon. This demonstrates that delivery capacity within the Vale has historically operated well above the proposed requirement and should therefore provide confidence that a higher housing target could realistically be achieved over the emerging plan period.
Furthermore, the Council’s own evidence base (BP7 - Housing and Employment Growth Options) identifies a five-year average build rate of 780 units per annum between 2016 and 2021. Again, this figure exceeds the annual delivery rate currently proposed within the emerging RLDP and reinforces the fact that the proposed housing requirement should not be unduly constrained by a lower long-term average.
Whilst Paragraph 5.8 explains that the proposed figures are based on a ten-year average delivery rate, it fails to acknowledge that this period included the Covid-19 pandemic and at a time where construction costs experienced significant inflation. These factors had a material impact on the housebuilding industry nationally and inevitably suppressed delivery rates during those years. From an objective perspective, basing the future housing requirement on an average that includes these exceptional circumstances risks skewing the figures and underestimates the district’s true delivery potential for the Vale.
In light of the above we believe a sensible response would be to incorporate a greater flexible allowance of 15% within the RLDP to demonstrate an appropriate level of growth will be achieved. Whilst also ensuring there is sufficient supply of sites to come forward early on during the plan period to proactively address housing need from the point of adoption up to 2036.
From a procedural standpoint it is also important to note that the currently adopted plan predates the publication of Future Wales: The National Plan 2040 and the Vale’s position within a national growth area. As such, pursuing an approach which seeks to maintain historic delivery rates is not considered to reflect this enhanced role and arguably lacks the level ambition set out at a national level. The proposed housing requirement should therefore be uplifted to positively respond to such matters in order to ensure conformity with Future Wales and regional aspirations.
Increasing the overall housing target would also act as a catalyst to enhance the delivery of affordable housing which is identified as a key objective for the RLDP. Each proposed site allocation is subject to a policy-compliant percentage contribution, therefore a higher level of market housing would proportionately generate a greater number of affordable homes to meet local need across the region.
As evidence above, the proposed allocation Site Ref HG1 KS2 – Land to the North of Dinas Powys, represents a suitable, available and deliverable location for residential development without any constraints preventing it from delivering units in the first five years of the emerging plan period.
Persimmon Homes remain fully committed to the development opportunities presented by the site and its progression as a proposed allocation within the RLDP. The latter is essential in assisting the Vale of Glamorgan meet local housing need which ultimately goes to the heart of the plan and ensuring it has been soundly prepared.
2. Aligning locations for new housing, employment, services and facilities to reduce the need to travel.
Persimmon supports the Vale’s objective to locate new major development in areas of the region best served by existing infrastructure and supporting services. The Settlement Appraisal Review (BP5) identifies Dinas Powys as the most sustainable primary settlement in the region with suitable local services to accommodate future growth which remains in keeping with the overall function of the existing settlement.
Whilst the settlements of Barry, Penarth, Llantwit Major and Cowbridge are deemed to score higher on certain criteria (as shown within the table below), it is clear Dinas Powys is considered to be the third most accessible settlement to modes of public transport which clearly aligns with the Council’s intension to pursue a transport orientated spatial strategy for future growth. On this basis it is evident that Dinas Powys is more sustainably located when compared to Cowbridge and Llantwit Major, and therefore warrants a higher ranking within the Settlement Appraisal Review and thus greater levels of growth within the RLDP.
Tables 1& 2. Extracts of Key Settlement, Service Centres & Primary Settlement Scores from Settlement Appraisal Review (BP5)
3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.
The Deposit RLDP explains that whilst reducing the need to travel is a key policy objective, it is recognised that there are journeys that will need to be made by other modes of transport, particularly due to the strong relationship with Cardiff as a designation for employment, retail and entertainment. As such the proposed growth strategy seeks to locate development in places that are inherently well served by sustainable transport in line with the Vale of Glamorgan’s transport hierarchy.
Persimmon supports these principles and recognises the importance of prioritising development in sustainable locations across the regions, particular those well connected to Cardiff city centre. Paragraph 5.18 of the Deposit Plan states that “Targeting new development to the settlements that are served by the rail network is a key part of the strategy, as it will facilitate journeys being made by means other than the car”. Persimmon wholly agree with this approach on the basis that this would enable the RLDP to achieve a more sustainable pattern of development and in doing so support growth over the emerging plan period.
In order to help identify suitable locations for future development Transport for Wales have produced isochrone maps which delineates different travels times for walking and cycling around each of the existing railway stations in the Vale. Most notably the site known as at ‘Land North of Dinas Powys’ is situated within 5-10 minutes walking / 0-5 minutes cycling distance to Eastbrook Station and 15-20 minutes walking/ 5-10 minutes cycling distance from the station at Dinas Powys. This evidence clearly demonstrates the proposed site represents one of the most sustainable locations for residential-led growth and thereby justified its position within the RLDP as a key allocation.
Land North of Dinas Powys further strengthens the spatial strategy by prioritising development at a location that is well served by existing rail stations. Focusing growth in settlements with established rail connectivity ensures that future residents have direct access to sustainable transport infrastructure from the outset. This approach supports a more sustainable pattern of development by reducing reliance on the private vehicle and encouraging a modal shift towards rail, alongside walking and cycling for local trips.
By directing development to locations well served by existing bus and rail infrastructure , the proposal would help reduce the need for commuting via private vehicles, particularly for journeys to key employment and service destinations. In doing so, it would make a positive contribution towards the Council’s climate change targets through the reduction of carbon emissions and promoting a modal shift within the local community.
Moreover, the proposed allocation HG1 KS2 presents a significant opportunity to support local facilities and facilitate green infrastructure provision within a highly accessible and sustainable location. The scope of which shall include ample public open space, dedicated active travel links via pedestrian footpaths and cycleways, Sustainable Drainage Systems (SuDS) features, and other associated infrastructure. Integrating these elements at the heart of the site shall enable residents to meet a greater proportion of their daily needs locally while benefiting from high-quality public transport connections.
In terms of the overall distribution of growth, Persimmon fully supports the proposed approach to prioritise development in sustainable locations near existing rail infrastructure as depicted by the strategic transport corridor within the RLDP Key Diagram (Figure 10). However, to optimise the effectiveness of this strategy it would be prudent to focus growth in areas of greatest demand.
Paragraph 3.14 of the Deposit Plan explains that a significant proportion of the population increase in the Vale over the past 10 years has been as a direct result of a people migrating from Cardiff to the Vale, with the Vale ultimately experiencing a net increase of an average of 716 people per year for the period 2011-2021. These principles should therefore be better reflected in the general pattern of development set out within the RLDP. This would be achieved by prioritising higher levels of growth in areas such as Dinas Powys, which is not only the nearest settlement geographically to Cardiff but also inherently well connected by the existing rail network and other modes of public transport.
Focussing further growth in well-connected, sustainable locations such Dinas Powys will therefore support the Council’s transport-led placemaking approach. These principles fully align with the Welsh Governments strategic objectives as set out within the Future Wales – the National Plan 2040, Planning Policy Wales Edition 12 and Llwybr Newydd: The Wales Transport Strategy, which in turn shall contribute towards achieving a more sustainable pattern of development within the RLDP.
Figure 1. Extract of Key Diagram/ Strategic Growth Area from Deposit Plan
Section 6: Policy Framework
This section identifies the strategic policies, criteria-based development management policies, site specific allocations and designated areas to be protected. These are broadly arranged by topic theme under the key policy headings set out in PPW which are reflected below.
Strategic and Spatial Choices (Placemaking)
Policy SP1 – Sustainable Growth Strategy (& Policy SP6 – Housing Requirements)
This policy states that in order to deliver the Sustainable Growth Strategy for the VoG, the emerging RLDP will make provision for 7,890 dwellings and 5,338 jobs over the plan period. In order to achieve the former Policy SP6 explains that to meet the identified housing requirement of 7,890 dwellings, provision will be made for the delivery of 8,660 homes in the Plan Period 2021 to 2036 which incorporates a 10% flexible allowance. In turn this will be distributed as follows: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.
Whilst Persimmon supports the Council’s conclusion that in principle the ‘Medium’ growth option reflected in Policy SP1 generally accords with the Welsh Government’s aspirations for the Vale of Glamorgan within the Future Wales national growth area, which is identified as a focus for strategic economic and housing growth. Given the Vale forms part of the Cardiff Capital Region, it is equally important that the overall level of growth remains suitably ambitious to support the region’s economic aspirations and continues to complement Cardiff which remains the nearest neighbouring authority.
Although we understand the proposed approach uses the Dwelling-led 10 Year scenario, which is based on the average annual build rate for the first 10 years of the adopted plan and equates to a total of 7,890 new homes or 526 dwellings per annum over the emerging plan period. The overarching intention is to ensure the projected level of growth is deliverable whilst recognising the fact there is sufficient capacity within the Vale to support further growth towards the higher end of the ‘medium’ range.
As noted, Persimmon are wholly in support of Key Housing-Led Site Ref. KS2 - North Dinas Powys, off Cardiff Road, which seeks to actively contribute towards the housing requirement.
However, the Deposit Plan also needs to recognise that there exists an opportunity to further extend the allocation to provide a logical extension to the defined urban area of Dinas Powys and which will facilitate the delivery of much needed full market and affordable housing to help address the significant level of demand identified across the Vale.
This additional land is promoted in the context of the concerns raised regarding the current figure of 8,660 new dwellings which is underpinned by a 10% flexible allowance in relation to housing delivery. Persimmon consider it relevant to take account of recent evidence provided to other Local Planning Authorities in Wales which have either adopted or are in the latter stages of bringing forward a new Local Development Plan.
For example, in Bridgend the Council recently adopted their new Local Development Plan (covering the period 2018 to 2033) which is underpinned by a flexibility allowance of 14% equating to an additional 1,053 dwellings. This level of provision was required in order to demonstrate the Anticipated Annual Build Rate (AABR) were deliverable and ensure that the Plan remains effective in the event of changing circumstances. During the examination process the Inspector explained that an increase beyond the standard 10% was fundamental to enable the plan and its housing trajectory to be resilient and sufficiently adaptable. The overarching purpose of which is to account for any unforeseen changes and potential shortfalls/ delays to the strategic site allocations whilst still enabling the overall housing requirement to be delivered.
For Swansea, the Council published their LDP2 Pre-Deposit Plan (Preferred Strategy) for consultation last year. In terms of housing delivery this incorporates a 20% flexible allowance above the proposed housing requirement and is predicated on the basis of needing to account for certain sites not coming forward as anticipated and other unforeseen factors affecting delivery. Similar to the Vale, Swansea City Council’s latest Annual Monitoring Report (6th Edition) (October 2025) confirms that since adoption of the current LDP in February 2019 they have not met their annual housing target for any of the past six years. To date this has resulted in a shortfall of approximately 3,767 homes which is predominantly attributed to delays associated with larger strategic allocations. Therefore, in order to avoid having similar implications next time around the Council have uplifted the proposed flexible allowance within LDP2 and intend to incorporate a more diverse portfolio of sites going forward. The main purpose of which is to build in an additional margin of flexibility above the standard 10% threshold, and therefore enable other sites to come forward to account for potential slippage elsewhere to ensure the plan is effective in meeting local need.
More recently in Monmouthshire, the Council submitted their proposed RLDP to PEDW in November 2025. As part of which they have identified a requirement of 6,210 homes which incorporates a 15% flexible allowance. Similar to above an increase beyond the standard 10% threshold has been justified to account for potential shortfalls/ delays due to longer lead in times needed for strategic site allocations whilst proactively addressing any historic unmet need.
Whilst Persimmon appreciate that the Council intends to prioritise growth towards the higher end of the ‘medium’ range. Having reviewed the Deposit Plan evidence base we believe a minimum allowance of 15% would be more reflective of the Vale’s strategic position and would seek an additional 395 dwellings to the medium growth option equating to a total of 9,074 homes. The benefits of which are evident above and justification well-established from a plan-making perspective to ensure the RLDP is underpinned by a robust evidence base which incorporates a suitable level of flexibility to effectively meet local housing need from the outset.
In addition to the above the importance of increasing the RLDP’s housing target, by virtue of uplifting the proposed flexible allowance, has recently been highlighted by the findings of data published by the Welsh Government (WG). Most notably that includes the 2022-based Local authority household projections (Dated 20th November 2025) and 2025-based estimates of additional housing need (Dated 12th February 2026).
Upon publishing the former superseded the previous 2018-based demographic projections and provides updated figures from mid-2022 to mid-2032. The results show that whilst the overall number of households in Wales is projected to increase by around 98,500/ 7.2%, to a total of 1.46 million. The local authorities projected to see the largest percentage increases are the Vale of Glamorgan (up 11.7%) and Cardiff (up 11.1%).
In turn these trends are carried through into WG’s 2025-based estimates of additional housing need, which identifies an existing unmet need of 9,400 homes. This is supplemented by a requirement to deliver an average of 8,700 new homes annually over the next five years to account for newly arising need alone. The combination of which demonstrates that there is an urgent need to increase delivery rates on both a national and local level, and therefore it’s imperative that the latest position with regards to the need for affordable and full market homes are accurately reflected within the Council’s housing figures.
In terms of considering the level of housing provision for a plan, Paragraph 5.34 of the DPM is explicit in that the most up-to date suite of Welsh Government Population and Household Projections must form the foundation of any evidence base. LPAs are then required to use a household conversion factor when translating households to dwellings to establish overall need.
Once again, the DPM explains that failure to include a robust conversion rate from the outset is a high-risk strategy and may undermine the overall soundness of any emerging plan. To avoid such circumstances, we believe it’s essential the LMNA is updated to reflect the latest WG datasets, which in turn is likely to provide grounds to warrant extending the proposed 15% threshold further. Ultimately this approach intends to ensure the emerging RLDP more effectively meet local need over the entire plan period and thus soundly prepared.
Figure 2. Extract of the Welsh Government’s Calculation Method for Total Dwellings as per the Development Plan Manual
As mentioned above, Policy SP6 provides a high-level breakdown of how the Council’s housing growth is expected to be delivered over the plan period. For completeness this includes: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.
Whilst we do not dispute those relating to proposed site allocations and/ or windfall developments. The proportion of dwellings set to be accounted for within the Vale of Glamorgan’s existing landbank (3,837 units) is considered excessive given it represents 44.3% of the Council’s overall housing requirement.
Although Persimmon acknowledge that this is partly derived on the basis that emerging plan period has technically already commenced (2021 to 2036), and therefore is made up of sites at various different stages of planning process (i.e. either already built out, being constructed or secured consent - as shown below). It is important to recognise the potential implications this approach has in terms of stifling opportunities for growth, which is contrary to the Welsh Government’s aspirations for the Vale of Glamorgan as part of a National Growth Area within Future Wales: The National Plan 2040.
Table 3. Extract of the Vale of Glamorgan’s Housing Supply and Housing Requirement
From an objective standpoint this means there is only a need for 2,561 additional dwellings (3,520 dwellings minus 959 units rolled forward) to be delivered from new allocations over the emerging plan period. This reinforces the point that in reality the overall quantum of new homes will be significantly lower than the figure set out within the RLDP’s vision and strategic objectives. In turn this prevent opportunities for new sites to come forward as part of the plan-making process and in doing so hinder the Council’s ability to account for historic unmet need. Collectively this substantiates Persimmon’s position that in order for the plan to be considered sound the Council must accommodate a greater flexible allowance, optimising the use of sites such as Land north of Dinas Powys, to ensure the emerging local plan complies with the Welsh Government’s aspirations set out within Future Wales.
As illustrated above, the Council anticipate 1,303 dwellings coming forward in the form of windfall sites. This accounts for both small and large sites which in turn represents around 15% of the Council’s overall housing requirement. Once again, whilst we do not contest the overall windfall provision or the projected delivery rate of 87 dwellings per annum up to 2036. It is important to recognise that based on past trends the annual number of homes which comes forward on windfall sites varies significantly year on year.
Table 18 of the Development Plan Manual (DPM) is explicit in that respect and explains that although due regard must be attributed to analysis of past delivery rates, periods of abnormally high or low completions should be considered inappropriate/anomalies when extrapolating future rates of windfall sites. On that basis ensuring the RLDP incorporates a greater flexible allowance will not only provide certainty that any shortfalls/fallow periods are offset, but also enable a more consistent supply of homes to be achieved over the plan period as a whole.
Lastly, in terms of overall growth Paragraph 5.8 of the Deposit Plan states that the level of growth they have identified ‘’has been demonstrated to be deliverable and is sufficiently ambitious to reflect the Vale’s position in the Future Wales national growth area.’’ It also notes that this level of growth has been chosen so that it is ‘’complementary to, rather than competing with, the neighbouring authority of Cardiff and the wider Cardiff Capital Region (CCR).’’.
Whilst it is agreed that the level of growth may be realistic based on past trends, the claim that this is sufficiently ambitious and needs to be at this level to avoid competing with Cardiff is not substantiated by evidence to suggest that a higher level of growth could not also achieve these principles.
Cardiff, as the capital city of Wales, also demonstrated historic under delivery when publishing its deposit plan for consultation in February 2025, which was the case for allocated sites as well as generally for annual delivery rates over the adopted plan period. This resulted in a failure to meet targets over the last 10 years of their adopted plan. Whilst Cardiff has made progress in more recent years, the latest Annual Monitoring Report published in October 2025 notes that to date the region has met just 58% of its overall dwelling requirements over the plan period from 2006-2025.
Accordingly, with Cardiff opting to continue with a medium growth option for their RLDP despite these shortfalls, there is no sound basis to suggest that adopting a higher growth level within the VoG would detrimentally impact upon housing delivery or ‘compete’ with Cardiff.
In summary, Persimmon supports the overall medium growth strategy and key allocations such as North Dinas Powys. Although given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
These steps would help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Overall, we conclude that a higher flexibility allowance is necessary to the ensure the RLDP is able to effectively meet local need over the plan period. From a practical standpoint whilst further sites may well be required to accommodate the additional growth, it is important the current proposed allocations are safeguarded and therefore supplemented accordingly. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
Policy SP2 – Settlement Hierarchy
In principle, Persimmon supports the Settlement Pattern set out in Policy SP2, particularly the identification of Dinas Powys as a Primary Settlement.
Whilst the role of Primary Settlements is acknowledged, in that they contain several key services and facilities, vital to supporting sustainable communities including primary schools, small convenience shops, food and drink outlets and employment opportunities.
Persimmon considers that Dinas Powys is capable of fulfilling an enhanced role given its proximity to strategic transport infrastructure which provide regular services to key designations throughout the region and Cardiff city centre. Whilst the proposed allocation HG1 KS2 undoubtedly supports such principles, given the area is inherently well served by existing infrastructure we maintain that it has the capacity to accommodate even further levels of growth, which could be delivered through the extended Candidate Site (Ref. No. 444). This approach would align with the Council’s spatial strategy given that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally subject to greater physical and environmental constraints.
Policy SSC1 – Development within Settlement Boundaries
Persimmon Homes support the premise of Policy SSC1, and the objective of directing development to areas within defined settlement boundaries. This approach will help reinforce sustainable growth patterns and prioritise development in locations well served by both existing and planned infrastructure. Collectively these principles align with the Councils ambitions for Land north of Dinas Powys (HG1 KS2) and supporting local services and facilities to reduce overreliance on private vehicle travel.
Policy SP4 – Placemaking
In principle Persimmon Homes supports Policy SP4 and the aim of ensuring all new development is of high-quality sustainable design.
The proposed allocation Land north of Dinas Powys has been designed with landscape led approach and therefore clearly aligns with the placemaking principles set out in Policy SP4 and the sustainable placemaking framework of PPW12. The site’s location on the edge of Dinas Powys enables the scheme to positively responds to the character of the local area whilst remaining in keeping with the wider landscape setting. The layout reflects the prevailing scale and form of surrounding neighbourhoods, incorporating similar architectural cues and a coherent street hierarchy. Green infrastructure forms the structural framework of the masterplan, integrating retained landscape features, new planting, and sustainable drainage measures to ensure climate resilience and biodiversity enhancement. The density proposed makes efficient use of land in accordance with national policy while remaining sensitive to local character and the edge-of-settlement context.
In line with PPW12’s emphasis on health and well-being, the scheme promotes active travel that connects to existing pedestrian routes, public transport links and community facilities within Dinas Powys. The development prioritises walking and cycling, supports access to local schools, shops and services, and reduces reliance on the private car. Public open spaces have been prioritised towards the centre of the scheme and homes orientated accordingly to promote natural surveillance, thereby creating a safe area that encourage recreation, social interaction and community cohesion. The integrated green network delivers benefits such as improving general air quality and strengthening ecological connectivity within the Vale of Glamorgan.
The proposal also reflects the design principles set down within the Design Commission for Wales in respect of quality architectural design, contextual response and multifunctional spaces. This will be achieved through a balanced mix of housing types and tenures responds to local need. Careful consideration has also been given to the wider landscape setting of Dinas Powys, ensuring that key views, settlement edges and local character are respected and enhanced.
Policy PGD1 – Creating Well Designed and Inclusive Places
Persimmon question the need for both Policies SP4 and PGD1 as there is notable repetition between the two. In principle the criteria set out within the proposed policy aligns with our expectations, however there is a need to recognise that not all criteria will be able to be accommodated on development sites. Particularly given the need to accommodate other legislative requirements relating to environmental and economic matters that warrant equal consideration as part of the planning process.
On that basis if the Council are minded to continue with this particular policy’s inclusion, we request the proposed wording be updated to clarify that such the merit of such principles will be considered on a site-by-site basis rather than the current blanket approach suggested.
Policy PGD2 – Residential Development Densities
Residential densities are supported as a principle, however, should not be so prescriptive as to unnecessarily restrict development. Policy PGD2 outlines that residential development over 0.5ha will be permitted where the proposed density achieves a minimum of 35 dwellings per net hectare within Key, Service Centre and Primary Settlements and 30 dwellings per net hectare in Minor Rural Settlements.
From a planning standpoint, Persimmon support the Councils approach to prioritise higher density development in Key Settlements, Service Centres and Primary Settlements. These locations are naturally better connected to existing transport infrastructure, modes of public transport, Active Travel routes and local services/facilities to accommodate future growth.
A minor point in relation to the policy wording is the ‘dwellings per net hectare’ and the removal of non-developable space in any calculations. Whilst this is normal, the increased requirements relating to SAB, green infrastructure requirements and increased ecological mitigation all have a direct impact on the remaining available land and it is positive to see there is an allowance for some flexibility.
The density requirement appears to be reasonable in its approach, and the flexibility to allow individual site adjustments (as per the remaining text within the Policy) is welcomed. As there will undoubtedly be occasions where the density will need to be considered in further detail due to other on-site factors/ mitigation measures.
Possibly update to highlight support for higher net densities being prioritised in Key, Service Centres and Primary Settlements which are naturally well served by regular public transport provision and Active Travel routes, or near to services and facilities.
Policy SP5 – Creating Healthy & Inclusive Places and Spaces
Policy SP5 is supported in principle insofar as it seeks to promote healthier and more inclusive places, consistent with the objectives of Planning Policy Wales and the Well-being of Future Generations (Wales) Act 2015. However, to ensure the policy is robust and effective, it is important that it is supported by an up-to-date and clearly evidenced policy framework. In this regard, the supporting evidence base, particularly BP36 – Planning Healthy Places (June 2024), should be reviewed to ensure that the datasets referenced reflect the most recent available information. For example, life expectancy data currently cited (2018–2020) and indicators based on the Welsh Index of Multiple Deprivation 2019 should be updated where possible to reflect the most recent datasets, including the Welsh Index of Multiple Deprivation 2025 and any updated public health, active travel, air quality and demographic data. Ensuring that the evidence base reflects the latest available information is necessary to demonstrate that the policy is justified and based on an accurate understanding of local health conditions and inequalities.
The policy framework should also be updated to reflect the Health Impact Assessment (Wales) Regulations 2025, which were approved by the Senedd in November 2025 and will come into force on 6 April 2027. At present, these forthcoming statutory requirements are not referenced within Policy SP5 or the supporting guidance. Given that the regulations will establish a statutory framework for the preparation of Health Impact Assessments in Wales, it will be important for the RLDP and supporting documents to clarify how the policy’s screening, checklist and Rapid HIA requirements will interact with the statutory regime once implemented. Including reference to the regulations would help ensure that the policy remains aligned with national legislation and is future-proofed over the plan period.
The supporting Rapid Participatory HIA of the Deposit RLDP (BP3, September 2025) provides useful background regarding the Council’s engagement with stakeholders in preparing the plan. However, it would be beneficial for the Council to clearly explain how the findings of that work have informed the specific requirements contained within Policy SP5. Providing a clearer link between the outcomes of the participatory HIA and the policy approach adopted in the RLDP would improve transparency and demonstrate that the policy has been shaped by the evidence gathered through the stakeholder engagement process.
Table 4. Extract of Proposed Criteria for HIA Assessments
The emerging Health Placemaking Supplementary Planning Guidance (SPG) is broadly welcomed as a practical tool to support implementation of the policy. Nevertheless, a number of matters require further clarification prior to its adoption. In particular, whilst the SPG provides greater clarity regarding the use of the Healthy Placemaking Checklist and Rapid HIAs, it does not clearly identify the circumstances in which a comprehensive (full) HIA would be required. The SPG should also be updated to reflect forthcoming guidance from the Welsh Health Impact Assessment Support Unit (WHIASU) expected in 2026, and ensure alignment with other relevant policies and guidance, including those relating to design, travel plans, public transport accessibility and open space provision. Given the number of cross-references within the SPG, it will be important that these documents are fully aligned and consistent.
Finally, any requirement for a Health Impact Assessment should be applied on a proportionate basis, reflecting the scale, nature and likely impacts of the development proposed. The policy should therefore make clear that the scope and level of detail required for HIAs will be proportionate to the scale and type of development. Subject to these amendments and clarifications, the policy would provide a clearer and more effective framework for integrating health considerations into the planning process.
Active and Social Places
Policy SP6 – Housing Requirements
Please refer to Policy SP1 as written response also accounts for information proposed under this particular policy.
Policy HG1 – Housing Allocations
HG1 KS2 – Land to the North of Dinas Powys
Persimmon wholly support the inclusion of Land to the North of Dinas Powys (HG1 KS2) as a proposed site allocation within the emerging RLDP. The site represents a logical extension to the existing settlement of Dinas Powys and provides an opportunity to address local housing needs within a highly accessible and well-connected location. Given its position adjacent to the existing settlement boundary of Dinas Powys, the site also is also well served by existing services, public transport links, schools and community facilities, thereby reducing reliance on private car travel and supporting national and local placemaking objectives.
The proposed scheme has also been designed to make effective use of land that is both logically related to the existing urban form and clearly aligns with the Council’s growth strategy. Given the level of demand in the area, a particularly significant benefit of proposed allocation HG1- KS2 is the commitment to deliver a minimum of 100 affordable homes, representing 40% of the total provision. The site will therefore make a meaningful contribution to meeting locally needs and incorporate a mix of tenures that directly responds to the Vale’s LHMA/evidance base. These principles align with the Councils aspirations to foster more inclusive communities and thus remain consistent with Policy SP4 and Policy PGD1. From a design perspective the proposed scheme has also informed by a comprehensive masterplanning process ensuring that high quality design, integrated green infrastructure, and sustainable transport connections integrated throughout the proposed layout.
Ecological considerations have similarly informed the proposed layout for the site. Technical work, including the Preliminary Ecological Appraisal and subsequent strategy documents, have confirmed suitable biodiversity enhancements can be delivered through a network of retained and reinforced green corridors, historic woodland protection, and supplementary planting. The masterplan prioritises ecological connectivity, incorporating wildlife corridors, dark routes for nocturnal species, and extensive areas of multifunctional open space. These measures not only mitigate potential impacts on identified species, such as dormice, but provide clear opportunities for biodiversity net gain in accordance with the Environment (Wales) Act 2016. The integration of Sustainable Drainage Systems within landscaped areas further demonstrates how flood attenuation, habitat creation and recreational provision can be delivered in a cohesive manner. Thereby ensuring that environmental enhancements are incorporated throughout the scheme from the outset which fully accord with the RLDP’s objectives in that respect.
In transport and community infrastructure terms, the site’s sustainable credentials are equally compelling. The proposed access arrangements onto Cardiff Road have been refined in response to feedback from the highway department, whilst demonstrating deliverability and promoting safe access for all users to avoid having any adverse impacts on local highway network. Geographically the site also lies within immediate walking distance of Eastbrook and Dinas Powys rail stations, which inevitably aligns with the Council’s transport-orientated growth strategy. In turn these principles accord with national placemaking objectives set out in PPW12 and shall actively encouraging a modal shift away from private vehicles to incentivise more active forms of travel. Most notably this includes dedicated pedestrian and cycle links through the site providing connectivity with a range of local services and facilities.
By virtue of the above we fully support the proposed allocation of Land to the North of Dinas Powys (HG1 KS2). As the proposed developer Persimmon Homes remain committed to development opportunities the site presents and its ability to help deliver much needed full market and affordable homes in a highlight sustainable location, which clearly accord with the Council’s proposed growth strategy.
Policy HG1 (B) – Housing Allocations
HG1 (3) Barry - Land at Hayes Lane
Persimmon Homes question to suitability of allocating residential development on the site known as Land at Hayes Lane, The Bendricks. These concerns are centred on the following:
Unsustainable Location & Poor Connectivity
Whilst the site is technically identified within the settlement boundary, it is clearly not a sustainable location for residential development. This is evident by virtue of the fact that Land at Hayes Lane is situated within an existing industrial estate and lacks any supporting facilities. The former reinforces the principle that as a whole the area is characterised by a mix of light industrial and heavy industrial uses which naturally conflicts with the prospect of future residential housing. Moreover, it is reasonable to assume vehicles using the local highway network will be larger in nature (such as HGV’s), and given the majority of streets do not contain dedicated pedestrian footpaths/ cycleways, this raises concerns from a highway safety perspective.
Although we note the Transport Statement from AECOM suggests access can theoretically be achieved to Barry and Sully. Both of these settlements remain over 2km from the site and lie outside of the distances deemed acceptable by Transport for Wales (TfW) to support resident development. Allocating housing on Land at Hayes Lane which therefore does not comply with such criteria would clearly undermine the Council’s objective of pursuing a Transport Orientated Growth approach and by virtue of which risk promoting an unsustainable pattern of development within the emerging RLDP.
As outlined above given the nature of the area there are almost no existing active travel routes in this part of the region. This lack of provision would ultimately lead to future residents using alterative options and many of which would require residents to overcome physical barriers in order to travel in a more sustainable manner. For instance, due to the level of infrastructure associated with the port, the site is effectively detached from the main urban area of Barry and would involve crossing an active railway line halfway along Wimborne Road without sufficient mitigation measures in place. On the other hand, whilst Hayes Road extends further west towards Sully, it follows the southern boundary of the Polaris Industrial Estate which contains various access points that are in regular use throughout the day. Collectively these characteristics would prevent future occupants travelling in a more active manner which is in direct conflict with both local and national planning policy objectives.
The site’s geographic isolation means that access to modes of public transport are extremely limited. Most notably that includes railway stations with the nearest being Cadoxton Station which is located circa 3.8km north of the site. By AECOM’s own accord this is considered to equate to a minimum walking distance of 52 minutes which exceeds TFW’s standards for residential development. Again, this reinforces the fact future residents would be overly reliant on private vehicles to access local services (such as employment opportunities, schools, doctor surgeries etc) which in turn shall achieve an unsustainable pattern of growth and increase associated carbon emissions.
Loss of Allocated Employment Land
Crucially, the site remains allocated in the adopted LDP for B1/B8 employment uses. These intended to facilitate small industrial and workshop units as part of the Atlantic Trading Estate’s expansion and in turn support opportunities for local businesses/ enterprise ventures. The council’s latest Employment Land Review confirms a clear demand for such uses in Barry, with Land at Hayes Lane representing the most logical location for further growth. Reallocating this land for housing would therefore diminish the Vale of Glamorgan’s ability to attract sufficient economic investment to support the requisite levels of growth over the emerging plan period, and potentially displace businesses to other less suitable parts of the region which would not be in the interests of good placemaking as per PPW12.
Although the RLDP’s evidence base suggests there are other development opportunities within the region that could compensate for the proposed loss of employment land. Upon further review it is apparent these are in less favourable locations from both a strategic and operational standpoint. Reassigning Land at Hayes Lane from employment to residential would therefore undermine the Council’s objective of safeguarding existing employment land and prioritising business/ industrial uses in area’s well served by infrastructure designed to accommodate such activities (such as Barry Docks). Furthermore, it would also set a precedent for other potential losses and in doing so impact the Council’s ability to meet the region’s employment needs up to 2036.
By virtue of the above, Persimmon Homes object to the proposed allocation of residential development on Land at Hayes Lane. The principle of which is in direct conflict with the Welsh Government’s objectives set out within PPW12 & Future Wales: The National Plan 2040 and the need to ensure existing employment land is suitably protected. The latter is crucial in attracting future investment to the region and shall act as a catalyst to enable housing to be delivered elsewhere, in more sustainable locations better connected to local services/ facilities, such as Dinas Powys.
HG1 (5) Llantwit Major - Land between the Northern Access Road and Eglwys Brewis Road (Site C – Central Parcel)
Whilst we do not oppose the overall principle of residential development at Site C (Central Parcel), this position must be considered in the context of the wider allocation. Applications for Sites A and B (2020/00351/OUT (Site A) & 2020/00352/OUT (Site B)) are currently pending subject to respective Section 106 Agreements, with prolonged negotiations resulting in significant delays to delivery. This experience clearly demonstrates that development within this allocation is complex and subject to extended viability and legal discussions, which inevitably impacts the rate at housing is able to come forward.
According to the Council’s register we understand Site C has not been subject to any formal planning application, and therefore there is no detailed evidence available regarding the proposed layout design, infrastructure requirements, viability, or anticipated submission and determination timeframes. Despite this, the Council’s housing trajectory assumes development commencing in 2028/29, with 35 units initially and 45 units annually thereafter. Given the absence of a live application and the precedent of delays on Sites A and B, these delivery assumptions appear overly optimistic based on current evidence.
On that basis we maintain that the Council should reassess the trajectory assumptions for this particular site and identify other alternatives to help account for any unforeseen slippage on Site C. The overarching purpose of which shall be to ensure the RLDP incorporates sufficient flexibility to consistently meet housing need over the entire plan period.
Policy HG3 – Housing Led Redevelopment Opportunity
Persimmon Homes acknowledges the Council’s position in respect of Site HG3 (1) – Former Eagleswell Primary School, including the temporary five-year consent (2024–2029) for 90 units of short-term accommodation and their inclusion within housing completions for monitoring purposes.
Given their expressly temporary nature and planned relocation to other sites within the Vale by 2029, it is essential that these units are not double counted in a way. As the risk of doing so would artificially inflate the Vale’s housing numbers, thereby preventing delivery opportunities elsewhere over the plan period.
Although we welcome the clarification provided at paragraph 6.111 which states that once the temporary units are removed and the site is redeveloped for permanent accommodation, any future dwellings will not be included within the RLDPs housing supply figures. In the interest of soundness, we believe this should explicitly set out within the proposed wording of Policy HG3 to avoid any potential ambiguity and thus ensure no additional net housing contributions will arise from the site upon its redevelopment later down the line.
This approach is critical given the Vale’s substantial existing landbank and the number of allocations being rolled forward, as cumulatively factoring in additional units from this site would further constrain opportunities to accommodate genuine growth elsewhere. Thereby limiting the Council’s ability to effectively meet local housing need up to 2036.
Policy SP7 – Affordable Housing Provision
In principle, Persimmon support Policy SP7’s objective to secure a minimum of 3,070 affordable homes over the plan period. That said, given the level of affordable housing is directly proportionate to the total housing provision within RLDP we believe there is scope for further uplifts in that respect.
As mentioned above Persimmon maintain that there is sufficient evidence to justify increasing the proposed housing requirements through the Vale’s flexible allowance in order to maximise opportunities for growth. In turn this would prevent artificially capping affordable housing provision at 3,070 homes to ensure the plan is positively prepared by incorporating measures that proactively address demand across the region.
National policy clearly supports this approach. Planning Policy Wales requires development plans to be positively prepared and to maximise the delivery of affordable housing as a key component of sustainable placemaking. The Development Plan Manual reinforces the need for plans to be aspirational, evidence-led and sufficiently flexible to ensure delivery. Furthermore, the Welsh Government 2025-based estimates of additional housing need report highlights the need for a step change in affordable housing delivery across Wales, recognising that continuation of past trends will not address the current affordability challenges. Collectively, this provides a clear direction of travel in that it’s imperative to uplift housing provision where affordability pressures are acute such as the Vale of Glamorgan.
To ensure the RLDP is sound, the Council should increase the overall housing requirement by apply a meaningful flexibility allowance that ensure sufficient contingency measures are in place to consistently meet local need over the plan period. This would directly increase the quantum of affordable housing secured through policy mechanisms, thereby aligning the Plan with national policy objectives. The latter goes to the heart of the tests of soundness within the Development Plan Manual in ensuring the plan is not only appropriate but capable of delivering the step change required to address affordable housing needs up to 2036.
Policy SP8 – Affordable Housing Requirements
Persimmon supports the position that residential development should help meet affordable housing need. Although to ensure Policy SP8 is effective its important the percentage requirements and site thresholds proposed are viable across a range of site types and market areas to ensure they do not inadvertently suppress delivery.
On that basis we believe it would be prudent for the Deposit Plan to clarify that affordable housing targets are subject to site-specific viability considerations and can be adjusted in circumstances where comply with such parameters would render the sites viable and thus prevent delivery. Greater flexibility is also needed in tenure and mix to better reflect evolving local needs over the entire plan period including the point when planning applications are formally submitted.
Policy SP10 – Sustainable Transport
Persimmon support the overall objective of Policy SP10 in seeking to promote sustainable transport, increase active travel opportunities and reduce reliance on the private car in accordance with national placemaking objectives. Encouraging development in accessible locations such as Dinas Powys and enhancing connectivity between settlements is welcomed. However, for soundness its important the policy recognises the different physical characteristics across the Vale of Glamorgan, particularly in edge-of-settlement and rural contexts where flexibility is necessary to ensure sustainable growth is not unduly constrained.
In this regard, the extend site at Dinas Powys represents a suitable and deliverable opportunity that aligns fully with the objectives of Policy SP10. The Authority will be aware that Transport Strategies were submitted at earlier plan-making stages, and these have now been refined through a Technical Note prepared by Vectos (now SLR) in direct response to the Candidate Sites Assessment. The scope of which confirms the proposed access arrangements presented within Policy HG1 KS2 with regards to the primary and secondary vehicular entry/ egress points on to Cardiff Road are acceptable. The former includes the creation of a new signalised junction on to the A4055/ Cardiff Road which has been modelled by Vectos (now SLR) to confirms there will be no adverse impacts with regards to the overall capacity of the local highway network. Furthermore, these measures shall be supplemented by financial contribution towards off-site improvements to help alleviate any existing connection issues/ pinch points and thus enable traffic to flow more freely within Dinas Powys and the wider surrounding area.
In addition, the scheme will deliver significant active travel benefits, including dedicated pedestrian footpaths and cycleways throughout the site that connect seamlessly into the surrounding network. The site lies within immediate walking distance of Eastbrook and Dinas Powys railway stations and therefore aligning with the Vale’s transport-orientated growth strategy. Overall, the refined Transport Strategy demonstrates that the development would not result in any significant adverse impact on the highway network, while actively promoting sustainable travel choices. Subject to proportionate application of Policy SP10 and recognition of the robust mitigation proposed, the site clearly supports and advances the sustainable transport objectives of the emerging RLDP.
Policy TR1 – Transport Proposals
Persimmon supports the overarching objectives of Policy TR1, which seeks to protect and enhance strategic transport infrastructure across the Vale of Glamorgan, including active travel routes, public transport schemes and highway improvements. Land north of Dinas Powys aligns with these objectives by directing growth to a sustainable settlement capable of supporting integrated transport solutions. The scheme has also been designed to incorporate dedicated pedestrian and cycle routes that ensures development sympathetically integrates with the surrounding area. Most notably that includes measures to enhance pedestrian permeability whilst also encouraging a shift towards more sustainable modes of travel.
In addition to the above, allocation future growth at Land North of Dinas Powys will support planned improvements between the Barry/Biglis roundabout and Dinas Powys Active Travel Route by providing on-site pedestrian and cycle infrastructure that links directly to the proposed 2 km shared walking and cycling corridor. By aligning the site layout and access points with this strategic route the scheme shall naturally maximise the route’s functionality, safety and long-term success.
Finally, the site’s highly sustainable location reinforces its accordance with the Council’s transport-led growth strategy. The development is within immediate walking distance of both Eastbrook and Dinas Powys railway stations, which provide frequent services to Cardiff and Barry other key destinations. Prioritising residential growth in such locations continues towards the Vale of Glamorgan’s aim of creating a more sustainable pattern of development, maximising the use of public transport, supporting active travel and reducing reliance on private cars.
Policy SP13 – Community Infrastructure and Planning Obligations
Persimmon Homes do not consider that Policy SP13 – Community Infrastructure and Planning Obligations is required. This is predicated on the basis that such matters are dealt with under separate legislative and policy frameworks. Therefore, as currently drafted the proposed policy (and supporting text) do not add anything further information for planning purposes and risk unnecessary duplication.
Policy CI1 – Open Space Provision
Whilst there are no comments regarding the principle, thresholds and use of the FIT standards in terms of the open space provision. As such Persimmon query the requirement for an Open Space Strategy for all sites that meet the thresholds.
The requirement within emerging Policy CI1 for applicants to prepare or submit an Open Space Strategy is not considered to be sufficiently justified or proportionate when assessed against Planning Policy Wales, which promotes access to open space and recreational provision but does not prescribe the preparation of standalone Open Space Strategies for individual planning applications. There is a lack of clarification as to what it proposed and also how the level of detail would be proportional to the size of the site.
Productive and Enterprising Places
Policy CC1 – Residential Operational Net Zero Carbon Development
Persimmon Homes, strongly object to Policy CC1 on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework.
Building Regulations Part L currently sets the requirements for energy efficiency in new homes, with the current dwellings built by Persimmon Homes being designed to exceed the minimum requirements of Part L by incorporating enhanced insultation and improved building fabric performance. This includes low U-values for key elements such as walls, roofs, floors and windows to minimise heat loss and improve overall energy efficiency. As a result, Persimmon Homes are achieving a high rating under the Energy Performance Certificate (EPC) System, typically within the A-B range.
Introducing a separate and potentially more onerous operational net zero requirement at the local level risks imposing additional cost and complexity that undermines site viability and deliverability. The Development Plans Manual for Wales is clear that development plans must avoid repeating national policy and should not introduce requirements that are more appropriately addressed through other regulatory regimes. In this respect, Policy CC1 is not considered justified or appropriate and thereby conflicts with the second test of soundness set out within the DPM.
The proposed step change in standards from 1 April 2030 (particularly the reduction in space heating demand from 40 kWh/m²/year to 15 kWh/m²/year) represents a significant and abrupt step change in performance expectations. Whilst reference is made to initiatives such as Tai ar y Cyd and AECB CarbonLite, these have largely been associated with grant-funded affordable housing schemes. There is no clear evidence that equivalent standards are able to be delivered on mainstream housing sites without compromising their overall viability. On that note the Development Plans Manual requires policies to be underpinned by robust evidence and deliverable over the plan period. In the absence of which the proposed policy could well prevent housing delivery and undermines the emerging RLDP’s ability to effectively meet housing need.
Further to the above Policy CC1 also risks creating fragmented energy performance standards across different Local Planning Authorities in Wales. This contradicts the benefit of a consistent national approach through Building Regulations and makes it significantly more difficult for mainstream housebuilders operating across multiple authority areas to deliver homes efficiently. The DPM emphasises the need for development plans to create policy frameworks that encourage housing delivery and avoid unnecessary complications. By introducing bespoke operational monitoring requirements and energy modelling thresholds the policy as currently worded blurs the boundary between planning and Building Control functions. In turn this raises concerns as to whether the policy is justified and capable of being applied consistently across the board.
Finally, the Council’s own Viability Assessment (Paragraph 6.60 of BP42) acknowledges current uncertainty given the outcome of Welsh Government’s consultation on this topic are still unknown at the time of writing. In the event the Welsh Government decide to peruse national regulation progresses, it may be more appropriate for such matters to be addressed through Building Control rather than planning policy. Once again, this reinforces Persimmon’s concern that Policy CC1 is premature and not in general conformity with national policy. As drafted, the policy risks undermining the council’s proposed housing supply, affordable housing delivery rate and general implementation over the plan period. For these reasons, we believe it fails to meet the relevant tests of soundness and should be omitted from the proposed RLDP.
Distinctive and Natural Places
Policy SP19 – Green Infrastructure
In principle Persimmon Homes support the aim of this policy in ensuring proposed development incorporate measures that protect and enhance green infrastructure provision.
For completeness the proposed allocation (Land at north Dinas Powys) has been informed by a comprehensive Green Infrastructure Strategy and Landscape Summary Note prepared by Tir Collective (August 2023). The reports demonstrate that the site has been designed in a manner consistent with the objectives of Policy SP19. While future development of the site technically requires a release from the locally designated Green Wedge between Dinas Powys, Penarth and Llandough, the scope of which is limited in nature. Paragraph 3.70 of PPW12 states that Green Wedge boundaries should only include land that is required to remain open for the longer term. In this context, the Council’s Green Wedge Background Paper indicates that proposed allocation HG1 KS2 shall not result in any coalescence between settlements and nor does it make a significant contribution to the overall integrity of the designation. These factors confirm that the site is suitable for accommodating future residential development.
The emerging masterplan adopts a landscape-led approach that responds to the site’s physical characteristics and surrounding context. Development has therefore been excluded from the most visually sensitive parts of the site which will instead be retained as public open space to avoid having any adverse impact in that respect. This approach is reinforced through the retention and enhancement of existing hedgerows, woodland and field boundaries, alongside supplementary planting to naturally integrate the site into the wider landscape framework.
Policy SP20 – Biodiversity and Ecosystem Resilience
In principle, Persimmon support the objective of Policy SP20 which intends to protect and enhance biodiversity and ecosystem resilience. However, in the interests of soundness we believe the proposed requirement relating to biodiversity enhancement should be reframed to ensure it remains consistent with national policy. In particular, the policy should clarify that development proposals are expected to deliver biodiversity betterment in a manner that is proportionate to the scale and nature of development and consistent with national guidance. The wording should avoid introducing a requirement for a specific or quantified biodiversity net gain approach that goes beyond the national policy framework. Ensuring that the policy reflects the approach set out in Planning Policy Wales 12 will provide greater certainty for applicants and decision-makers while still providing sufficient comfort in securing the requisite biodiversity improvements.
Policy DNP1 – Special Landscape Areas
Persimmon support the revision of the Cwrt-yr-Ala Basin Special Landscape Area (SLA) to reflect the allocation of key site (HG1KS2 North of Dinas Powys off Cardiff Road) as per Policy DNP1. As indicated in Background Paper BP28 – Special Landscape Areas, the future development proposals for the site will be required to incorporate mitigation to reduce the impact of the site on the SLA. These works are incorporated into the proposed masterplan.
Policy DNP2 – Green Wedges
Persimmon support the revision to the green wedge between Dinas Powys, Penarth and Llandough, at Policy DNP2 (1) which has been amended to reflect the key site allocation HG1KS2 North of Dinas Powys.
Policy DNP8 – Severn Estuary Recreational Pressure
Policy DNP8 seeks to address recreational pressure on the Severn Estuary Special Area of Conservation, Special Protection Area and Ramsar Site. Whilst Persimmon appreciate the overarching purpose in its current form the proposed policy lacks sufficient supporting information explaining how it will operate in practice. The supporting text suggests that key details relating to mitigation delivery, including mechanisms such as Suitable Alternative Natural Greenspace and wider access management measures, will be set out in future Supplementary Planning Guidance. Deferring these important details until later down the line creates uncertainty at the plan-making stage and makes it difficult to assess whether the policy is sound, effective and/ or capable of being implemented on a consistent basis.
The policy also provides no clear threshold or criteria for determining what level of activity would constitute “visitor pressure” or an “adverse impact” on the integrity of the designated sites. Similarly, the evidence demonstrating what level of impact residents moving into new homes across the Vale of Glamorgan will generate additional recreational pressure on the Severn Estuary does not appear to have been quantified to date. While a 12.6 km recreational catchment is referenced, the supporting text does not clearly explain the evidence or methodology underpinning this distance. Moreover, the proposed text also fails to set out how new residential development will be assessed in terms of measurable impacts on the European site and thus the scope of mitigation that would subsequently be required.
From a practical standpoint this level of uncertainty is concerning given the implication of this policy are unable to be fully assessed due to the lack of evidance. For instance, if development sites within the catchment are expected to contribute financially towards mitigation measures, then the scale and mechanism of those contributions must be clearly established as part of the plan-making process. Without this clarity, there is a risk that Policy DNP8 could introduce unforeseen costs and extensive time delays, potentially affecting the viability and overall deliverability of proposed housing sites. The cumulative impact of which would then undermining the plan’s ability to meet its housing requirements and risk finding the RLDP unsound.
Conclusion
Subject to the comments within this response, Persimmon are broadly supportive of the Deposit RLDP put forward. Persimmon Homes’ most pertinent comments on the consultation document are summarised below:
• Persimmon fully supports the proposed approach to prioritise development in sustainable locations near existing rail and bus infrastructure as depicted by the strategic growth area within the RLDP Key Diagram. However, to optimise the effectiveness of this strategy growth should be focused in areas of greatest demand, such as Dinas Powys, which is not only the nearest settlement geographically to Cardiff but also inherently well connected by the existing rail network and other modes of public transport.
• Persimmon support the principle of the Settlement Hierarchy and the identification of Dinas Powys as a Primary Settlement. Whilst the importance of which is noted, Persimmon maintain that Dinas Powys, in particular, is capable of a higher role and function which can be accommodated in the extended Candidate Site Ref. No 444. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
• Whilst Persimmon supports the overall principle of a medium growth strategy and key allocations such as North Dinas Powys. Given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to overall housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
• In the interests of soundness these changes shall help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Persimmon therefore conclude that a higher flexibility allowance and additional site allocations, such as the extended option at Dinas Powys, are necessary to ensure the RLDP is able to effectively meet local need over the plan period. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
• Whilst Persimmon welcome the majority of the proposed planning policies from a development management perspective. They strongly object to Policy CC1 (Residential Operational Net Zero Carbon Development) on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework.
• Although Persimmon appreciate the overarching purpose of Policy DNP8 (Severn Estuary Recreational Pressure). In its current form the proposed policy lacks sufficient information to understand how it will operate in practice. Whilst supporting text suggests that key details relating to mitigation delivery will be set out in future Supplementary Planning Guidance. Deferring these important details until later down the line creates uncertainty at the plan-making stage and makes it difficult to assess whether the policy is sound, effective and/ or capable of being implemented on a consistent basis.
• Persimmon are wholly supportive of Land North of Dinas Powys’ (HG1 KS2) position as a proposed allocation within the emerging RLDP. The site represents a suitable, available and deliverable location for residential development without any constraints preventing it from delivering much needed homes in line with the Council’s proposed housing trajectory. Furthermore, its position as a key site is crucial to ensure growth is prioritised in such a highly sustainable location, adjacent to the defined urban area of Dinas Powys, and maximise opportunities for greater connectivity at both a regional and local level.
Persimmon would welcome the opportunity to continue on-going conversations with Officers and subsequently support the site’s progression through the next stages of the plan-making process.
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6917
Derbyniwyd: 11/03/2026
Respondent ID: 2669
Ymatebydd: Barratt Redrow Homes
Asiant : Boyer Planning
Barratt Redrow support the overall objective of Policy SP10 in seeking to promote sustainable transport, increase active travel opportunities and reduce reliance on the private car in accordance with national placemaking objectives.
1. INTRODUCTION
1.1 These representations build upon the responses previously provided to the Call for Sites Consultation, additional information submission, and more recently the Barry Growth Paper in July 2025. For the avoidance of doubt these representations relate to Barratt Redrow Homes’ land interest know as ‘Swn Y Coed, Wenvoe’. The site has previously been identified as Ref No 437 within the Council’s Candidate Site Assessments including the Preferred Strategy Stage, which has been published as part of the technical evidence base and background papers alongside the Deposit Plan.
1.2 Having reviewed the Deposit Plan it is evident that the document is structured around a number of key sections including:
• Section 3 – The Vale of Glamorgan Key Characteristics;
• Section 4 – RLDP Key Themes, Vision, and Objectives;
• Section 5 – Sustainable Growth Strategy; and
• Section 6 – Policy Framework.
1.3 For completeness this submission shall discuss each section in turn.
1.4 The overarching purpose of which shall be to respond to the relevant draft Replacement Local Development Plan policies, with particular consideration given to the Welsh Government’s tests of soundness as set out within the Development Plan Manual for Wales (Third Edition) March 2020)):
• Test 1 – Does the Plan Fit?
• Test 2 – Is the Plan Appropriate?
• Test 3 – Will the Plan Deliver?
2. THE VALE OF GLAMORGAN KEY CHARACTERISTICS
Settlement Pattern
2.1 Barratt Redrow support, in principle, the Settlement Pattern as set out in Section 3 of the Deposit Plan and in particular the identification of Wenvoe as a Primary Settlement.
2.2 Paragraph 3.9 explains that primary settlements “offer several key services and facilities, which are vital to their role as sustainable communities, as they reduce the need to travel to Barry or the Service Centre Settlements to address day-to-day needs”.
2.3 The importance of the Primary Settlements in supporting the Service Centre Settlements is noted, however Barratt Redrow consider that Wenvoe, in particular, is capable of a higher role and function and can accommodate a higher level of growth over and above affordable led exception sites, which can be accommodated at Candidate Site Ref. No 437. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
Housing Need
2.4 In light of the Vale of Glamorgan’s strategic location in-between Cardiff and Bridgend, and the significant employment opportunities associated with these areas, the Deposit RLDP should seek to maximise housing provision to ensure a more sustainable balance is achieved between homes and jobs, and in turn reduce commuting distances/ carbon emissions.
2.5 Paragraph 3.18 clearly acknowledges the scale of affordable housing need, identifying a requirement for 1,075 affordable homes per annum between 2023–2028 and 154 per annum thereafter. Yet it remains unclear whether existing unmet need has been fully factored into the overall housing requirement presented within the Deposit RLDP. This is particularly importance in the context of the Welsh Government’s 2025-based estimates which identify 9,400 units of unmet need at a national level and a requirement for 8,700 additional homes per annum over the next five years simply to address newly arising need.
2.6 Accordingly, there is a compelling justification for a further uplift in housing numbers to ensure the Plan proactively addresses both existing and emerging need. Increasing the overall housing requirement would directly enhance the overall delivery rate for affordable homes which is crucial in a local authority area with the highest affordability ratio in Wales. Paragraph 3.17 confirms that in the Vale average house prices are 9.7 times average workplace earnings compared to the Wales average of 6.1, therefore a step change in housing targets is needed to support a more balanced housing market across the region.
3. RLDP KEY THEMES, VISION, AND OBJECTIVES
3.1 Section 4 of the Deposit RLDP sets out the Council’s vision over the emerging plan period. The vision establishes a series of strategic goals the Council intends to work towards and in doing so provides an insight into how the Vale of Glamorgan is envisioned to develop up to 2036.
Key Themes
3.2 Barratt Redrow supports the theme ‘Homes for all’ and the need for the housing supply to respond to the growing population and provided in appropriate locations, with a mix of tenure and types. In that respect the site at Swn Y Coed, Wenvoe offers a sustainable and deliverable opportunity to ensure future residential development aligns with such objectives to deliver high quality housing development in a sustainable location.
3.3 In principle, Barratt Redrow support the ‘Placemaking’ theme and consider that development in Swn Y Coed, Wenvoe would ensure a strong sense of identity and that the scheme is capable of providing a well designed and sustainable development.
3.4 Barratt Redrow also support the theme of ‘Promoting active travel and sustainable transport choices’, and in particular the need to ensure that the new development will be in a highly sustainable location with very good access to alternative transport, such as bus services, rather than a reliance on the rail network. This is clearly evident at Swn Y Coed, Wenvoe.
Vision
3.5 In general, Barratt Redrow support the RLDP Vision, however highlight that whilst Barry and other Sustainable Service Centres are identified as playing a vital role in delivering the strategy, the importance of the ability for Primary Settlements, such as Wenvoe, to deliver sustainable and high-quality residential development also needs to be suitably recognised.
3.6 The allocation of Swn Y Coed (Candidate Site Ref: 437) is capable of providing a comprehensive residential development in a highly sustainable location and within an important Primary Settlement. The principle of which aligns with the Council’s ambition to ensure future growth delivers homes which caters for all (including affordable homes) and are prioritised in areas of greatest demand.
3.7 In light of the above it is considered that Wenvoe plays a significant part in delivering the Council’s strategy and the role, function, and ability of this settlement to accommodate growth needs to be significantly reinforced. The settlement is capable of accommodating more growth in a highly sustainable location we believe warrants greater recognition within the vision itself.
Strategic Objectives
Objective 3 – Home for All
3.8 Barratt Redrow supports the principle of Objective 3, in particular the provision of high quality housing which includes the right mix, tenure and type. Barratt Redrow supports the notion of providing residential development in places which people want to live, and in particular Wenvoe as a Primary Settlement.
Objective 4 – Placemaking
3.9 As above, in principle Barratt Redrow support the Council’s placemaking objectives which seeks to ensure all development will contribute positively toward creating a sense of place. Most notably this involves prioritising future growth in sustainable locations which are placed to create attractive, safe and accessible schemes that are equally effective from a functional standpoint.
3.10 The proposed allocation at Swn Y Coed (Ref 437) at Wenvoe aligns with such principles whilst also providing an opportunity to facilitate a high quality, mixed tenure residential development of circa 80+ open market & affordable homes, with a high-quality distinct character responding to the site context and creating a sense of place.
Objective 8 – Promoting Active and Sustainable Travel Choices
3.11 Barratt Redrow supports the principle of promoting active and sustainable travel choices and highlight that their residential development at Wenvoe has been designed to ensure accessibility it’s at the heart of the scheme with regards to walking, cycling and connectivity to public transport.
3.12 Given the site abuts the defined urban area of Wenvoe it represents a logical extension to the existing settlement and is well served by a range of local amenities and public transport. In terms of the latter the nearest bus stop is located within 100 meters of the site whilst the majority of local amenities are situated within 1.2 kilometres walking distance. Together these factors naturally promote the principle of linked trips which fully accords with the Chartered Institution of Highways and Transportations (CIHT) guidelines and reinforces the fact the site is a sustainable location for residential development.
3.13 Therefore, the site provides an opportunity to promote a modal shift towards more active forms of travel and consequently reducing dependency on private vehicle and associated carbon emissions. From a plan-making standpoint allocating further growth in this highly sustainable location would help achieve greater connect at both a regional and local level.
4. SUSTAINABLE GROWTH STRATEGY
Growth Strategy
4.1 RLDP Sustainable Growth Strategy comprises six key elements as follows:
1. Delivering a sustainable level of housing and employment growth supported by appropriate infrastructure that accords with the Vale’s position within the Cardiff Capital Region (CCR).
4.2 In order to meet the overarching Vision, the Vale have identified a need to deliver at least 8,679 new dwellings over the proposed plan period which responds to the identified housing requirement of 7,890 homes (526 per annum) and incorporates a 10% flexible allowance. Barratt Redrow acknowledge the proposed approach, however, maintain it should be considered a minimum figure with aspirations to achieve greater levels of growth in sustainable locations across the district.
4.3 Whilst Barratt Redrow appreciate these figures are based on average completion rates over the first ten years of the adopted Local Development Plan, it is important to recognise that a higher rate of housing delivery is demonstrably achievable. Annual completion rates peaked at 917 dwellings, with six of the ten monitoring years exceeding the 526 per annum figure currently relied upon. This demonstrates that delivery capacity within the Vale has historically operated well above the proposed requirement and should therefore provide confidence that a higher housing target could realistically be achieved over the emerging plan period.
4.4 Furthermore, the Council’s own evidence base (BP7 - Housing and Employment Growth Options) identifies a five-year average build rate of 780 units per annum between 2016 and 2021. Again, this figure exceeds the annual delivery rate currently proposed within the emerging RLDP and reinforces the fact that the proposed housing requirement should not be unduly constrained by a lower long-term average.
4.5 Whilst Paragraph 5.8 explains that the proposed figures are based on a ten-year average delivery rate, it fails to acknowledge that this period included the Covid-19 pandemic and at a time where construction costs experienced significant inflation. These factors had a material impact on the housebuilding industry nationally and inevitably suppressed delivery rates during those years. From an objective perspective, basing the future housing requirement on an average that includes these exceptional circumstances risks skewing the figures and underestimates the district’s true delivery potential for the Vale.
4.6 In light of the above Barratt Redrow believe a sensible response would be to incorporate a greater flexible allowance of 15% within the RLDP to demonstrate an appropriate level of growth will be achieved. Whilst also ensuring there is sufficient supply of sites to come forward early on during the plan period to proactively address housing need from the point of adoption up to 2036.
4.7 From a procedural standpoint it is also important to note that the currently adopted plan predates the publication of Future Wales: The National Plan 2040 and the Vale’s position within a national growth area. As such, pursuing an approach which seeks to maintain historic delivery rates is not considered to reflect this enhanced role and arguably lacks the level ambition set out at a national level. The proposed housing requirement should therefore be uplifted to positively respond to such matters in order to ensure conformity with Future Wales and regional aspirations.
4.8 Increasing the overall housing target would also act as a catalyst to enhance the delivery of affordable housing which is identified as a key objective for the RLDP. Each proposed site allocation is subject to a policy-compliant percentage contribution, therefore a higher level of market housing would proportionately generate a greater number of affordable homes to meet local need across the region.
2. Aligning locations for new housing, employment, services and facilities to reduce the need to travel.
4.9 Barratt Redrow supports the Vale’s objective to locate new major development in areas of the region best served by existing infrastructure and supporting services. The Settlement Appraisal Review (BP5) identifies Wenvoe as primary settlement in the region with suitable local services to accommodate future growth which remains in keeping with the overall function of the existing settlement.
4.10 Whilst the settlements of Barry, Penarth, Llantwit Major and Cowbridge are deemed to score higher on certain criteria it is clear that Wenvoe has a role and function providing both local key facilities and also acceptable linkages and distance to wider key and daily facilities.
3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.
4.11 The Deposit RLDP explains that whilst reducing the need to travel is a key policy objective, it is recognised that there are journeys that will need to be made by other modes of transport, particularly due to the strong relationship with Cardiff as a designation for employment, retail and entertainment. As such the proposed growth strategy seeks to locate development in places that are inherently well served by sustainable transport in line with the Vale of Glamorgan’s transport hierarchy.
4.12 Barratt Redrow supports these principles and recognises the importance of prioritising development in sustainable locations across the regions, particular those well connected to Cardiff city centre. Paragraph 5.18 of the Deposit Plan states that “Targeting new development to the settlements that are served by the rail network is a key part of the strategy, as it will facilitate journeys being made by means other than the car”. Barratt Redrow consider that the rail network is an important way to facilitate journeys other than by car, however it is not the only option available and that other sustainable sites, such as Swn Y Coed, are also accessible by public transport – namely bus services.
4.13 Whilst Barratt Redrow support the principle of prioritising growth within the Council’s sustainable transport corridor, it is important to recognise that there is not an infinite supply of land within close proximity to railway stations across the Vale of Glamorgan. Physical constraints, settlement patterns and environmental designations mean that the availability of suitable and deliverable sites within immediate walking distance of rail infrastructure is somewhat limited. Therefore, relying solely on these locations risks unnecessarily constraining the overall supply of land for housing and may limit the Council’s ability to maintain a consistent supply of homes up to 2036.
4.14 In this context, Barratt Redrow believe the RLDP should be updated to also identify opportunities for growth in locations that are well served by the strategic bus network. From a procedural standpoint this approach would remain consistent with the overarching objective of a transport-orientated growth strategy, whilst recognising the wider role bus corridors can play in facilitating a sustainable pattern of development. The benefits of which would provide greater certainty that local housing needs can be met over the proposed plan period and in turn strengthen the council’s ability to demonstrate the plan has been soundly prepared.
4.15 By directing development to locations well served by existing bus infrastructure, the proposal would help reduce the need for commuting via private vehicles, particularly for journeys to key employment and service destinations. In doing so, it would make a positive contribution towards the Council’s climate change targets through the reduction of carbon emissions and promoting a modal shift within the local community.
4.16 In relation to Swn Y Coed, bus stops are conveniently located at Walston Castle and Station Road approximately 95m and 440m from the site off the A4050, providing regular services to Cardiff City and surrounding settlements.
4.17 Furthermore, to the north of the site Culverhouse Cross is easily accessed by cycling, walking or via bus routes which can be caught just 100m east of the site. Culverhouse Cross Retail Park has an extensive range of facilities and employment opportunities that are within 2km of the site (easy walking and cycling distance).
4.18 Overall, it is considered that the site is in a relatively sustainable location and is within easy walking distance of public transport and Wenvoe village centre, which provides some basic facilities approximately 600m south of the site. For the reasons set out above, the site is considered to offer an opportunity for residential development in a suitable location that would facilitate and encourage sustainable travel, with no major highway related concerns.
4.19 Focussing further growth in well-connected, sustainable locations such Wenvoe will therefore support the Council’s transport-led placemaking approach. These principles fully align with the Welsh Governments strategic objectives as set out within the Future Wales – the National Plan 2040, Planning Policy Wales Edition 12 and Llwybr Newydd: The Wales Transport Strategy, which in turn shall contribute towards achieving a more sustainable pattern of development within the RLDP.
5. POLICY FRAMEWORK
5.1 Section 6 of the Deposit Plan outlines the policy framework for delivering the plan, including both Strategic and Development Management Policies following revisions pursuant to the Preferred Strategy consultation.
5.2 The Deposit Plan has arranged these policies into the four themes of Planning Policy Wales as follows:
• Strategic and Spatial Choices
• Active and Social Places
• Productive and Enterprising Places
• Distinctive and Natural Places
5.3 Whilst some of the technical details overlap, each of the policies considered to be of relevance are discussed in further detail below.
Policy SP1 – Sustainable Growth Strategy (& Policy SP6 – Housing Requirements)
5.4 This policy states that in order to deliver the Sustainable Growth Strategy for the Vale, the emerging RLDP will make provision for 7,890 dwellings and 5,338 jobs over the plan period. In order to achieve the former Policy SP6 explains that to meet the identified housing requirement of 7,890 dwellings, provision will be made for the delivery of 8,660 homes in the Plan Period 2021 to 2036 which incorporates a 10% flexible allowance. In turn this will be distributed as follows: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.
5.5 Barratt Redrow acknowledge the Council’s conclusion that in principle the ‘Medium’ growth option reflected in Policy SP1 generally accords with the Welsh Government’s aspirations for the Vale of Glamorgan within the Future Wales national growth area, which is identified as a focus for strategic economic and housing growth. Given the Vale forms part of the Cardiff Capital Region, it is equally important that the overall level of growth remains suitably ambitious to support the region’s economic aspirations and continues to complement Cardiff which remains the nearest neighbouring authority.
5.6 Although we understand the proposed approach uses the Dwelling-led 10 Year scenario, which is based on the average annual build rate for the first 10 years of the adopted plan and equates to a total of 7,890 new homes or 526 dwellings per annum over the emerging plan period. The overarching intention is to ensure the projected level of growth is deliverable whilst recognising the fact there is sufficient capacity within the Vale to support further growth towards the higher end of the ‘medium’ range.
5.7 As noted, Barratt Redrow are wholly in support of providing additional sites, such as Swn Y Coed, Wenvoe, which would provide a logical extension to the defined urban area of Wenvoe and which will facilitate the delivery of much needed full market and affordable housing to help address the significant level of demand identified across the Vale.
5.8 Swn Y Coed is promoted in the context of the concerns raised regarding the current figure of 8,660 new dwellings which is underpinned by a 10% flexible allowance in relation to housing delivery. Barratt Redrow consider it relevant to take account of recent evidence provided to other Local Planning Authorities in Wales which have either adopted or are in the latter stages of bringing forward a new Local Development Plan.
5.9 For example, in Bridgend the Council recently adopted their new Local Development Plan (covering the period 2018 to 2033) which is underpinned by a flexibility allowance of 14% equating to an additional 1,053 dwellings. This level of provision was required in order to demonstrate the Anticipated Annual Build Rate (AABR) were deliverable and ensure that the Plan remains effective in the event of changing circumstances. During the examination process the Inspector explained that an increase beyond the standard 10% was fundamental to enable the plan and its housing trajectory to be resilient and sufficiently adaptable. The overarching purpose of which is to account for any unforeseen changes and potential shortfalls/ delays to the strategic site allocations whilst still enabling the overall housing requirement to be delivered.
5.10 For Swansea, the Council published their LDP2 Pre-Deposit Plan (Preferred Strategy) for consultation last year. In terms of housing delivery this incorporates a 20% flexible allowance above the proposed housing requirement and is predicated on the basis of needing to account for certain sites not coming forward as anticipated and other unforeseen factors affecting delivery. Similar to the Vale, Swansea City Council’s latest Annual Monitoring Report (6th Edition) (October 2025) confirms that since adoption of the current LDP in February 2019 they have not met their annual housing target for any of the past six years. To date this has resulted in a shortfall of approximately 3,767 homes which is predominantly attributed to delays associated with larger strategic allocations. Therefore, in order to avoid having similar implications next time around the Council have uplifted the proposed flexible allowance within LDP2 and intend to incorporate a more diverse portfolio of sites going forward. The main purpose of which is to build in an additional margin of flexibility above the standard 10% threshold and therefore enable other sites to come forward to account for potential slippage elsewhere to ensure the plan is effective in meeting local need.
5.11 More recently in Monmouthshire, the Council submitted their proposed RLDP to PEDW in November 2025. As part of which they have identified a requirement of 6,210 homes which incorporates a 15% flexible allowance. Similar to above an increase beyond the standard 10% threshold has been justified to account for potential shortfalls/ delays due to longer lead in times needed for strategic site allocations whilst proactively addressing any historic unmet need.
5.12 Whilst Barratt Redrow appreciate that the Council intends to prioritise growth towards the higher end of the ‘medium’ range, having reviewed the Deposit Plan evidence base Barratt Redrow believe a minimum allowance of 15% would be more reflective of the Vale’s strategic position and would seek an additional 395 dwellings to the medium growth option equating to a total of 9,074 homes. The benefits of which are evident above and justification well-established from a plan-making perspective to ensure the RLDP is underpinned by a robust evidence base which incorporates a suitable level of flexibility to effectively meet local housing need from the outset.
5.13 In addition to the above the importance of increasing the RLDP’s housing target, by virtue of uplifting the proposed flexible allowance, has recently been highlighted by the findings of data published by the Welsh Government (WG). Most notably that includes the 2022-based Local authority household projections (Dated 20th November 2025) and 2025-based estimates of additional housing need (Dated 12th February 2026).
5.14 Upon publishing the former superseded the previous 2018-based demographic projections and provides updated figures from mid-2022 to mid-2032. The results show that whilst the overall number of households in Wales is projected to increase by around 98,500/ 7.2%, to a total of 1.46 million. The local authorities projected to see the largest percentage increases are the Vale of Glamorgan (up 11.7%) and Cardiff (up 11.1%).
5.15 In turn these trends are carried through into WG’s 2025-based estimates of additional housing need, which identifies an existing unmet need of 9,400 homes. This is supplemented by a requirement to deliver an average of 8,700 new homes annually over the next five years to account for newly arising need alone. The combination of which demonstrates that there is an urgent need to increase delivery rates on both a national and local level, and therefore it’s imperative that the latest position with regards to the need for affordable and full market homes are accurately reflected within the Council’s housing figures.
5.16 In terms of considering the level of housing provision for a plan, Paragraph 5.34 of the DPM is explicit in that the most up-to date suite of Welsh Government Population and Household Projections must form the foundation of any evidence base. LPAs are then required to use a household conversion factor when translating households to dwellings to establish overall need. Once again, the DPM explains that failure to include a robust conversion rate from the outset is a high-risk strategy and may undermine the overall soundness of any emerging plan. To avoid such circumstances, we believe it’s essential the LMNA is updated to reflect the latest WG datasets, which in turn is likely to provide grounds to warrant extending the proposed 15% threshold further. Ultimately this approach intends to ensure the emerging RLDP more effectively meet local need over the entire plan period and thus soundly prepared.
5.17 As mentioned above, Policy SP6 provides a high-level breakdown of how the Council’s housing growth is expected to be delivered over the plan period. For completeness this includes: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.
5.18 Whilst we do not dispute those relating to proposed site allocations and/ or windfall developments. The proportion of dwellings set to be accounted for within the Vale of Glamorgan’s existing landbank (3,837 units) is considered excessive given it represents 44.3% of the Council’s overall housing requirement.
5.19 Although Barratt Redrow acknowledge that this is partly derived on the basis that emerging plan period has technically already commenced (2021 to 2036) and therefore is made up of
Figure 2. Extract of the Welsh Government’s Calculation Method for Total Dwellings as per the Development Plan Manual Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
sites at various different stages of planning process (i.e. either already built out, being constructed or secured consent - as shown below). It is important to recognise the potential implications this approach has in terms of stifling opportunities for growth, which is contrary to the Welsh Government’s aspirations for the Vale of Glamorgan as part of a National Growth Area within Future Wales: The National Plan 2040.
5.20 From an objective standpoint this means there is only a need for 2,561 additional dwellings (3,520 dwellings minus 959 units rolled forward) to be delivered from new allocations over the emerging plan period. This reinforces the point that in reality the overall quantum of new homes will be significantly lower than the figure set out within the RLDP’s vision and strategic objectives. In turn this prevent opportunities for new sites to come forward as part of the plan-making process and in doing so hinder the Council’s ability to account for historic unmet need. Collectively this substantiates Barratt Redrow’s position that in order for the plan to be considered sound the Council must accommodate a greater flexible allowance, optimising sites such as Swn Y Coed, Wenvoe, to ensure the emerging local plan complies with the Welsh Government’s aspirations set out within Future Wales.
5.21 As illustrated above, the Council anticipate 1,303 dwellings coming forward in the form of windfall sites. This accounts for both small and large sites which in turn represents around 15% of the Council’s overall housing requirement. Once again, whilst we do not contest the overall windfall provision or the projected delivery rate of 87 dwellings per annum up to 2036. It is important to recognise that based on past trends the annual number of homes which comes forward on windfall sites varies significantly year on year.
5.22 Table 18 of the Development Plan Manual is explicit in that respect and explains that although due regard must be attributed to analysis of past delivery rates, periods of abnormally high or low completions should be considered inappropriate/anomalies when extrapolating future rates of windfall sites. On that basis ensuring the RLDP incorporates a greater flexible allowance will not only provide certainty that any shortfalls/fallow periods are offset but also enable a more consistent supply of homes to be achieved over the plan period as a whole.
5.23 Lastly, in terms of overall growth Paragraph 5.8 of the Deposit Plan states that the level of growth they have identified ‘’has been demonstrated to be deliverable and is sufficiently ambitious to reflect the Vale’s position in the Future Wales national growth area.’’ It also notes that this level of growth has been chosen so that it is ‘’complementary to, rather than competing with, the neighbouring authority of Cardiff and the wider Cardiff Capital Region (CCR).’’.
5.24 Whilst it is agreed that the level of growth may be realistic based on past trends, the claim that this is sufficiently ambitious and needs to be at this level to avoid competing with Cardiff is not substantiated by evidence to suggest that a higher level of growth could not also achieve these principles.
5.25 Cardiff, as the capital city of Wales, also demonstrated historic under delivery when publishing its deposit plan for consultation in February 2025, which was the case for allocated sites as well as generally for annual delivery rates over the adopted plan period. This resulted in a failure to meet targets over the last 10 years of their adopted plan. Whilst Cardiff has made progress in more recent years, the latest Annual Monitoring Report published in October 2025 notes that to date the region has met just 58% of its overall dwelling requirements over the plan period from 2006-2025.
5.26 Accordingly, with Cardiff opting to continue with a medium growth option for their RLDP despite these shortfalls, there is no sound basis to suggest that adopting a higher growth level within the Vale would detrimentally impact upon housing delivery or ‘compete’ with Cardiff.
5.27 In summary, Barratt Redrow acknowledge the overall medium growth strategy, however given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, Barratt Redrow maintain that the proposed RLDP should be more ambitious when it comes to housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
5.28 These steps would help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Overall, we conclude that a higher flexibility allowance and additional site allocations, such as Swn Y Coed, Wenvoe, are necessary to ensure the RLDP is able to effectively meet local need over the plan period. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
Policy SP2 – Settlement Hierarchy
5.29 Policy SP2 highlights that development will be focused with the Strategic Growth Area and that its distribution will be shaped by settlement hierarchy and seeks to direct ‘growth to locations that will provide the greatest opportunities for delivering housing to meet affordable needs, community infrastructure and enhanced sustainable transport provision’.
5.30 Accordingly, despite Wenvoe being identified as a primary settlement, Policy SP2 notes that development in this location will be limited to ‘the efficient and sustainable use of existing buildings, infill opportunities, small-scale affordable housing led schemes, and rural enterprise/ agricultural related developments.’ Similarly, it is noted that Policy SP2 does not consider Wenvoe to be an appropriate location for ‘’substantial additional growth’’.
5.31 Barratt Redrow object to the approach to Primary Settlements as set out under this Policy, as Wenvoe is inherently sustainable and the explanation for discounting it as an area to accommodate growth is considered unjustified.
5.32 First of all, the Deposit Plan acknowledges that it performs a similar function to the Primary Settlements located within the Strategic Growth Area and it is described as one of the ‘sustainable communities’ in The Vale of Glamorgan Key Characteristics section, as noted previously in Section 3.
5.33 Likewise, the site benefits from excellent accessibility the local public transport network, active travel routes and local services. These characteristics fully accord with Welsh Government’s strategic objectives and emphasise the fact that Swn Y Coed constitutes an appropriate location for future housing.
5.34 With regard to Policy SP2 discounting Wenvoe as a location to accommodate growth, this is due to the Vales’s stance that the settlement is ‘’significantly limited by the presence of Best and Most Versatile (BMV) agricultural land on the edge’’. Barratt Redrow do not consider this to be sufficient justification to discount the site from allocation as there would be limited impact on BMW agricultural land arising from the development of Swn Y Coed.
5.35 For example, as set out in the ALC report prepared by Kernon CCL and provided as part of the Candidate Submission Ref 437, the highest grade on site would be Subgrade 3a, with the site comprising a mix of Subgrades 3a and 3b. This means that in National Policy terms, development of the site would be in accordance with paragraph 3.59 of PPW 12 as the lowest grade available.
5.36 Furthermore, any perceived harm in terms of agricultural land is not considered to outweigh the benefits brought by the development in terms of contributing to both affordable and market housing need over the plan period, not least given the historic shortfalls identified earlier in this submission.
Policy SP4 - Placemaking
5.37 Policy SP4 is recognised as a key Policy in the emerging RLDP to ensure that new proposals align with existing communities and placemaking principles across the county.
5.38 Policy SP4 also requires all major development to provide a ‘Placemaking Statement’. It should be made clear in the Policy, as per Paragraph 6.34 of the Deposit Plan, that this is not expected to be a standalone statement, but will form part of a Design and Access Statement. We recommend the policy is amended as follows:
5.39 Nonetheless, the development of Swn Y Coed is considered to coincide with the objectives of Policy SP4, where the illustrative masterplan submitted as part of previous representations demonstrates its capability to deliver a range of housing types and tenures, whilst integrating key green infrastructure features.
5.40 Local services and facilities are also accessible from this location, tying in with criteria 7, and supports public transport use (as per criteria 4) given the close proximity to a frequent bus route.
5.41 Likewise, the quantum of units proposed demonstrates efficient use of the land based on the net developable area and site constraints in line with emerging Polic PGD2.
5.42 In principle Barratt Redrow supports Policy SP4 and the aim of ensuring all new development is of high-quality sustainable design.
Policy PGD1 – Creating Well Designed and Inclusive Places
5.43 Barratt Redrow question the need for both Policies SP4 and PGD1 as there is repetition. In principle the criteria as set out is as to be expected, however there is a need to recognise that not all criteria can always be accommodated on development sites. There are other environmental and economic factors need to be considered. However, if Policy PGD1 remains, then the text needs to be updated to suggest a site by site basis rather than the current blanket approach suggested.
Policy PGD2 – Residential Development Densities
5.44 Residential densities are supported as a principle, however, should not be so prescriptive as to unnecessarily restrict development. Policy PGD2 outlines that residential development over 0.5ha will be permitted where the residential density is a minimum of 35 dwellings per net hectare within Key, Service Centre and Primary Settlements and 30 dwellings per net hectare in Minor Rural Settlements.
5.45 A minor point in relation to the policy wording is the ‘dwellings per net hectare’ and the removal of non-developable space in any calculations. Whilst this is normal, the increased requirements relating to SAB, green infrastructure requirements and increased ecological mitigation all have a direct impact on the remaining available land and it is positive to see there is an allowance for some flexibility.
5.46 The density requirement appears to be reasonable in approach, and the flexibility to allow individual site adjustments (as per the remaining text within the Policy) is supported. There will be occasions where the density will need to be considered due to other on-site factors.
5.47 Policy SP5 is supported in principle insofar as it seeks to promote healthier and more inclusive places, consistent with the objectives of Planning Policy Wales and the Well-being of Future Generations (Wales) Act 2015. However, to ensure the policy is robust and effective, it is important that it is supported by an up-to-date and clearly evidenced policy framework. In this regard, the supporting evidence base, particularly BP36 – Planning Healthy Places (June 2024), should be reviewed to ensure that the datasets referenced reflect the most recent available information. For example, life expectancy data currently cited (2018–2020) and indicators based on the Welsh Index of Multiple Deprivation 2019 should be updated where possible to reflect the most recent datasets, including the Welsh Index of Multiple Deprivation 2025 and any updated public health, active travel, air quality and demographic data. Ensuring that the evidence base reflects the latest available information is necessary to demonstrate that the policy is justified and based on an accurate understanding of local health conditions and inequalities.
5.48 The policy framework should also be updated to reflect the Health Impact Assessment (Wales) Regulations 2025, which were approved by the Senedd in November 2025 and will come into force on 6 April 2027. At present, these forthcoming statutory requirements are not referenced within Policy SP5 or the supporting guidance. Given that the regulations will establish a statutory framework for the preparation of Health Impact Assessments in Wales, it will be important for the RLDP and supporting documents to clarify how the policy’s screening, checklist and Rapid HIA requirements will interact with the statutory regime once implemented. Including reference to the regulations would help ensure that the policy remains aligned with national legislation and is future-proofed over the plan period.
5.49 The supporting Rapid Participatory HIA of the Deposit RLDP (BP3, September 2025) provides useful background regarding the Council’s engagement with stakeholders in preparing the plan. However, it would be beneficial for the Council to clearly explain how the findings of that work have informed the specific requirements contained within Policy SP5. Providing a clearer link between the outcomes of the participatory HIA and the policy approach adopted in the RLDP would improve transparency and demonstrate that the policy has been shaped by the evidence gathered through the stakeholder engagement process.
Policy SP5 - Creating Healthy and Inclusive Places and Spaces
5.50 The emerging Health Placemaking Supplementary Planning Guidance (SPG) is broadly welcomed as a practical tool to support implementation of the policy. Nevertheless, a number of matters require further clarification prior to its adoption. In particular, whilst the SPG provides greater clarity regarding the use of the Healthy Placemaking Checklist and Rapid HIAs, it does not clearly identify the circumstances in which a comprehensive (full) HIA would be required. The SPG should also be updated to reflect forthcoming guidance from the Welsh Health Impact Assessment Support Unit (WHIASU) expected in 2026, and ensure alignment with other relevant policies and guidance, including those relating to design, travel plans, public transport accessibility and open space provision. Given the number of cross-references within the SPG, it will be important that these documents are fully aligned and consistent.
5.51 Finally, any requirement for a Health Impact Assessment should be applied on a proportionate basis, reflecting the scale, nature and likely impacts of the development proposed. The policy should therefore make clear that the scope and level of detail required for HIAs will be proportionate to the scale and type of development. Subject to these amendments and clarifications, the policy would provide a clearer and more effective framework for integrating health considerations into the planning process.
5.52 Please refer to Policy SP1 as written response also accounts for information proposed under this particular policy.
Policy SP6 – Housing Requirements
Policy HG1 – Housing Allocations
Policy HG1 (B) – Housing Allocations
• HG1 (3) Barry - Land at Hayes Lane 5.53 Barratt Redrow question the suitability of allocating residential development on the site known as Land at Hayes Lane, The Bendricks. These concerns are centred on the following:
• 5.54 Whilst the site is technically identified within the settlement boundary, it is clearly not a sustainable location for residential development. This is evident by virtue of the fact that Land at Hayes Lane is situated within an existing industrial estate and lacks any supporting facilities. The former reinforces the principle that as a whole the area is characterised by a mix of light industrial and heavy industrial uses which naturally conflicts with the prospect of future residential housing. Moreover, it is reasonable to assume vehicles using the local highway network will be larger in nature (such as HGV’s) and given the majority of streets do not contain dedicated pedestrian footpaths/ cycleways, this raises concerns from a highway safety perspective.
• 5.55 Although we note the Transport Statement from AECOM suggests access can theoretically be achieved to Barry and Sully. Both of these settlements remain over 2km from the site and lie outside of the distances deemed acceptable by Transport for Wales (TfW) to support resident development.
•
Unsustainable Location & Poor Connectivity Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.56 Allocating housing on Land at Hayes Lane which therefore does not comply with such criteria would clearly undermine the Council’s objective of pursuing a Transport Orientated Growth approach and by virtue of which risk promoting an unsustainable pattern of development within the emerging RLDP.
• 5.57 As outlined above given the nature of the area there are almost no existing active travel routes in this part of the region. This lack of provision would ultimately lead to future residents using alterative options and many of which would require residents to overcome physical barriers in order to travel in a more sustainable manner. For instance, due to the level of infrastructure associated with the port, the site is effectively detached from the main urban area of Barry and would involve crossing an active railway line halfway along Wimborne Road without sufficient mitigation measures in place. On the other hand, whilst Hayes Road extends further west towards Sully, it follows the southern boundary of the Polaris Industrial Estate which contains various access points that are in regular use throughout the day. Collectively these characteristics would prevent future occupants travelling in a more active manner which is in direct conflict with both local and national planning policy objectives.
• 5.58 The site’s geographic isolation means that access to modes of public transport are extremely limited. Most notably that includes railway stations with the nearest being Cadoxton Station which is located circa 3.8km north of the site. By AECOM’s own accord this is considered to equate to a minimum walking distance of 52 minutes which exceeds TFW’s standards for residential development. Again, this reinforces the fact future residents would be overly reliant on private vehicles to access local services (such as employment opportunities, schools, doctor surgeries etc) which in turn shall achieve an unsustainable pattern of growth and increase associated carbon emissions.
• 5.59 Crucially, the site remains allocated in the adopted LDP for B1/B8 employment uses. These intended to facilitate small industrial and workshop units as part of the Atlantic Trading Estate’s expansion and in turn support opportunities for local businesses/ enterprise ventures. The council’s latest Employment Land Review confirms a clear demand for such uses in Barry, with Land at Hayes Lane representing the most logical location for further growth. Reallocating this land for housing would therefore diminish the Vale of Glamorgan’s ability to attract sufficient economic investment to support the requisite levels of growth over the emerging plan period, and potentially displace businesses to other less suitable parts of the region which would not be in the interests of good placemaking as per PPW12.
• 5.60 Although the RLDP’s evidence base suggests there are other development opportunities within the region that could compensate for the proposed loss of employment land. Upon further review it is apparent these are in less favourable locations from both a strategic and operational standpoint. Reassigning Land at Hayes Lane from employment to residential would therefore undermine the Council’s objective of safeguarding existing employment land and prioritising business/ industrial uses in area’s well served by infrastructure designed to accommodate such activities (such as Barry Docks). Furthermore, it would also set a precedent for other potential losses and in doing so impact the Council’s ability to meet the region’s employment needs up to 2036.
•
Loss of Allocated Employment Land Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.61 By virtue of the above, Barratt Redrow object to the proposed allocation of residential development on Land at Hayes Lane. The principle of which is in direct conflict with the Welsh Government’s objectives set out within PPW12 & Future Wales: The National Plan 2040 and the need to ensure existing employment land is suitably protected. The latter is crucial in attracting future investment to the region and shall act as a catalyst to enable housing to be delivered elsewhere, in more sustainable locations better connected to local services/ facilities, such as Wenvoe.
• 5.62 Whilst we do not oppose the overall principle of residential development at Site C (Central Parcel), this position must be considered in the context of the wider allocation. Applications for Sites A and B (2020/00351/OUT (Site A) & 2020/00352/OUT (Site B)) are currently pending subject to respective Section 106 Agreements, with prolonged negotiations resulting in significant delays to delivery. This experience clearly demonstrates that development within this allocation is complex and subject to extended viability and legal discussions, which inevitably impacts the rate at housing is able to come forward.
• 5.63 According to the Council’s register we understand Site C has not been subject to any formal planning application, and therefore there is no detailed evidence available regarding the proposed layout design, infrastructure requirements, viability, or anticipated submission and determination timeframes. Despite this, the Council’s housing trajectory assumes development commencing in 2028/29, with 35 units initially and 45 units annually thereafter. Given the absence of a live application and the precedent of delays on Sites A and B, these delivery assumptions appear overly optimistic based on current evidence.
• 5.64 On that basis we maintain that the Council should reassess the trajectory assumptions for this particular site and identify other alternatives to help account for any unforeseen slippage on Site C. The provision of Swn Y Coed, Wenvoe represents an ideal opportunity to absorb the fallout in terms of housing numbers whilst ensuring the RLDP incorporates sufficient flexibility to consistently meet housing need over the entire plan period.
• 5.65 Although we do not necessarily dispute this sites progression, given Wates have submitted a full planning application (Ref 2024/01152/FUL) which is currently under consideration.
• 5.66 It is important to recognise that, according to the Council’s online planning register, two substantive consultation concerns remain outstanding. Firstly, the Highways response raises fundamental layout issues; and secondly, the Ecology department maintains a holding objection on the basis of insufficient supporting evidence. To date we understand both matters remain unresolved and may well require extensive design amendments, additional technical work, and potentially further consultation before the application can ultimately be determined.
• 5.67 In the absence of confirmed solutions to these issues, there remains uncertainty regarding the timeframe for determining the planning permission. Furthermore, even if consent is secured, there will be a need to discharge conditions and address any pre-commencement requirements, which will inevitably impact the lead-in time before development gets underway.
•
• HG1 (5) Llantwit Major - Land between the Northern Access Road and Eglwys Brewis Road (Site C – Central Parcel)
• HG1 (7) St Athan - Former Stadium Site, adjacent to Burley Place
Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.68 Given these outstanding matters, the assumption that development will commence in 2027/28 appears optimistic at this stage. Delivery timescales may be extended depending on the scale of amendments required and the duration of condition discharge processes. With this in mind, we believe it is prudent for the emerging RLDP to identify a broader and more diverse portfolio of site allocations to support housing delivery earlier on in the plan period. Ensuring flexibility through additional deliverable sites (such as Swn Y Coed) will reduce the Council’s overreliance on sites such as this one and provide greater certainty in maintaining a more consistent supply of homes over the plan period irrespective of potential delays that may arise on this site.
• 5.69 Whilst we understand that the proposed developer, Edenstone Homes, has recently engaged with the Council through its pre-application service. According to the Council’s planning register, no formal planning application has been submitted to date. As such, there remains no confirmed development proposal, agreed technical evidence base, or indicative determination timeframe associated with the allocation.
• 5.70 In the absence of a live application, there is a considerable degree of uncertainty surrounding the anticipated delivery programme. The housing trajectory assumes development commencing in 2027/28; however, this appears optimistic given that an application has yet to be submitted, validated or determined. Even following any grant of planning permission, there would be a requirement to discharge pre-commencement conditions and satisfy any relevant planning obligations before development could lawfully begin. From experience these processes can be time-consuming and may result in significant delays with regards to lead-in times prior to first completions.
• 5.71 Given this uncertainty, reliance on the site to deliver within the early phases of the plan period carries risk. It is therefore important that the emerging RLDP identifies a broader and more diverse portfolio of deliverable site allocations to support housing delivery, particularly in the earlier years of the plan. Incorporating additional sites with stronger prospects of short-term delivery will provide flexibility, resilience, and greater confidence in maintaining a robust housing land supply should delays arise on this allocation.
• 5.72 Barratt Redrow acknowledges the Council’s position in respect of Site HG3 (1) – Former Eagleswell Primary School, including the temporary five-year consent (2024–2029) for 90 units of short-term accommodation and their inclusion within housing completions for monitoring purposes.
• 5.73 Given their expressly temporary nature and planned relocation to other sites within the Vale by 2029, it is essential that these units are not double counted in a way. As the risk of doing so would artificially inflate the Vale’s housing numbers, thereby preventing delivery opportunities elsewhere over the plan period.
• 5.74 Although Barratt Redrow welcome the clarification provided at paragraph 6.111 which states that once the temporary units are removed and the site is redeveloped for permanent accommodation, any future dwellings will not be included within the RLDPs housing supply
•
• HG1 (8) St Athan - Clive Road, St Athan
Policy HG3 – Housing Led Redevelopment Opportunity Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• figures. In the interest of soundness, we believe this should explicitly set out within the proposed wording of Policy HG3 to avoid any potential ambiguity and thus ensure no additional net housing contributions will arise from the site upon its redevelopment later down the line.
• 5.75 This approach is critical given the Vale’s substantial existing landbank and the number of allocations being rolled forward, as cumulatively factoring in additional units from this site would further constrain opportunities to accommodate genuine growth elsewhere. Thereby limiting the Council’s ability to effectively meet local housing need up to 2036.
• 5.76 In principle, Barratt Redrow support Policy SP7’s objective to secure a minimum of 3,070 affordable homes over the plan period. That said, given the level of affordable housing is directly proportionate to the total housing provision within RLDP we believe there is scope for further uplifts in that respect.
• 5.77 As mentioned above Barratt Redrow maintain that there is sufficient evidence to justify increasing the proposed housing requirements through the Vale’s flexibility allowance in order to maximise opportunities for growth. In turn this would prevent artificially capping affordable housing provision at 3,070 homes to ensure the plan is positively prepared by incorporating measures that proactively address demand across the region.
• 5.78 National policy clearly supports this approach. Planning Policy Wales requires development plans to be positively prepared and to maximise the delivery of affordable housing as a key component of sustainable placemaking. The Development Plan Manual reinforces the need for plans to be aspirational, evidence-led and sufficiently flexible to ensure delivery. Furthermore, the Welsh Government 2025-based estimates of additional housing need report highlights the need for a step change in affordable housing delivery across Wales, recognising that continuation of past trends will not address the current affordability challenges. Collectively, this provides a clear direction of travel in that it’s imperative to uplift housing provision where affordability pressures are acute such as the Vale of Glamorgan.
• 5.79 To ensure the RLDP is sound, the Council should increase the overall housing requirement by apply a meaningful flexibility allowance that ensure sufficient contingency measures are in place to consistently meet local need over the plan period. This would directly increase the quantum of affordable housing secured through policy mechanisms, thereby aligning the Plan with national policy objectives. The latter goes to the heart of the tests of soundness within the Development Plan Manual in ensuring the plan is not only appropriate but capable of delivering the step change required to address affordable housing needs up to 2036.
• 5.80 Similarly, it is considered that Policy SP7 should be updated to allow flexibility and avoid the risk of contradicting Policy SP8. At present the blanket approach to affordable provision does not allow for site-specific delivery or viability requirements which may arise and as such, the amplification text should also include a note similar to the following:
•
Policy SP7 – Affordable Housing Provision
‘Where the target affordable housing percentage is considered unviable due to physical, financial, or other constraints, sites will be reviewed on an individual basis following submission of a detailed viability assessment and any supporting evidence as necessary’. Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.81 Barratt Redrow supports the position that residential development should help meet affordable housing need. Although to ensure Policy SP8 is effective its important the percentage requirements and site thresholds proposed must be viable across a range of site types and market areas to ensure they do not inadvertently suppress delivery.
• 5.82 On that basis we believe it would be prudent for the Deposit Plan to clarify that affordable housing targets are subject to site-specific viability considerations and can be adjusted in circumstances where comply with such parameters would render the sites viable and thus prevent delivery. Greater flexibility is also needed in tenure and mix to better reflect evolving local needs over the entire plan period including the point when planning applications are formally submitted. This would help ensure that the approach is consistent with paragraph 4.2.32 of PPW 12 which suggests that ‘site specific targets are indicative affordable housing targets which should be established for each residential site…’.
• 5.83 As noted above, the blanket approach to affordable housing requirements based on the Council’s latest needs evidence does not have due consideration for the event of unique technical complexities that many sites could face, nor viability considerations which may affect delivery, particularly early on in the plan period. As such, re-wording of the policy text to allow for sites to be reviewed on an individual basis where such circumstances apply is considered necessary for soundness.
• 5.84 Barratt Redrow support the overall objective of Policy SP10 in seeking to promote sustainable transport, increase active travel opportunities and reduce reliance on the private car in accordance with national placemaking objectives. Encouraging development in accessible locations such as Wenvoe and enhancing connectivity between settlements is welcomed. However, for soundness its important the policy recognises the different physical characteristics across the Vale of Glamorgan, particularly in edge-of-settlement and rural contexts where flexibility is necessary to ensure sustainable growth is not unduly constrained.
• 5.85 In this regard, the Swn Y Coed, Wenvoe site (Ref 437) represents a sustainable and deliverable opportunity that aligns fully with the objectives of Policy SP10.
• 5.86 The Candidate Site submission was accompanied by a Technical Note prepared by Lime Transport. Seen as the site abuts the defined urban area of Wenvoe it represents a logical extension to the existing settlement and is well served by a range of local amenities and public transport. In terms of the latter the nearest bus stop is located within 100 meters of the site whilst the majority of local amenities are situated within 1.2 kilometres walking distance. Together these factors naturally promote the principle of linked trips which fully accords with the Chartered Institution of Highways and Transportations (CIHT) guidelines and reinforces the fact the site is a sustainable location for residential development.
• 5.87 As shown within the latest illustrative masterplan the proposed site will be served by a new junction off Old Port Road. This is confirmed as being the most appropriate arrangement from a highway safety perspective and would be supported by other technical analysis to demonstrate that sufficient visibility can be achieved on to the road for all potential users.
•
Policy SP8 – Affordable Housing Requirements
Policy SP10 – Sustainable Transport Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.88 The accompanying Transport Assessment also demonstrates that there is sufficient capacity within the local highway network to accommodate the projected level of demand associated with this level of development. Where necessary, any future scheme would also facilitate other improvements which may well include widening the highway along Old Port Road and/ or Walston Road to accommodate two-way traffic and providing a dedicated pedestrian/ cycle junction to connect on to the existing active travel route which leads into the centre of Wenvoe. The existing field access would also be blocked up to create a more cohesive layout. However as shown within the latest masterplan the existing public right of way which crosses the site shall be retained and enhanced to promote better pedestrian connectivity throughout the local area.
• 5.89 In terms of active travel, dedicated pedestrian footpaths and cycleways will be incorporated throughout the scheme before filtering into the surrounding area. The site is also situated within an area which benefits from good access on to existing active travel routes and a number of which have also been identified for further improvements which reinforces the schemes sustainability. These principles fully accord with the relevant placemaking objectives set out within the National Plan 2040 and PPW12, and demonstrates that safe and suitable access can be achieved for all users.
• 5.90 Subject to proportionate application of Policy SP10 and recognition of the robust mitigation proposed, the site clearly supports and advances the sustainable transport objectives of the emerging RLDP.
• 5.91 Barratt Redrow object to Policy CC1 on the basis that it duplicates and potentially exceeds Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework. Introducing a separate and more onerous operational net zero requirement at the local level risks imposing additional cost and complexity that undermines site viability and deliverability. The Development Plans Manual for Wales is clear that development plans must avoid repeating national policy and should not introduce requirements that are more appropriately addressed through other regulatory regimes. In this respect, Policy CC1 conflicts with the principle that plans should be clear, proportionate and not duplicate national controls, raising concerns under the tests of soundness relating to coherence and consistency with national policy (Test 2) and whether the plan is justified (Test 3).
• 5.92 The proposed step change in standards from 1 April 2030 — particularly the reduction in space heating demand from 40 kWh/m²/year to 15 kWh/m²/year — represents a significant and abrupt escalation in performance expectations. Whilst reference is made to initiatives such as Tai ar y Cyd and AECB CarbonLite, these have largely been associated with grant-funded affordable housing schemes. There is no clear evidence that equivalent standards can be viably delivered across mainstream private housing schemes without public subsidy. The Development Plans Manual requires policies to be underpinned by robust evidence and deliverable over the plan period. In the absence of clear viability evidence across different site typologies and market conditions, the policy fails to demonstrate that it is justified and effective (Tests 3 and 4).
•
Policy CC1 - Residential Operational Net Zero Carbon Development Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.93 Policy CC1 also risks creating fragmented energy performance standards across different Local Planning Authorities in Wales. This undermines the benefit of a consistent national approach through Building Regulations and makes it more difficult for volume housebuilders operating across multiple authority areas to deliver homes efficiently at scale. The Manual emphasises that development plans should facilitate delivery and avoid unnecessary complexity. By introducing bespoke operational monitoring requirements, energy modelling thresholds and potential financial offset mechanisms, the policy blurs the boundary between planning and Building Control functions. This raises concerns as to whether the policy is effective and capable of consistent implementation (Test 4).Finally, the Council’s own Viability Assessment (BP42, paragraph 6.60) acknowledges uncertainty pending Welsh Government’s consultation outcome and suggests that, if national regulation progresses, it may be more appropriate for such matters to be addressed through Building Control rather than planning policy. This reinforces the concern that Policy CC1 is premature and may quickly become misaligned with national policy. As drafted, the policy risks undermining housing supply, affordable housing delivery and overall plan implementation. For these reasons, it fails to satisfy the tests of soundness in respect of coherence with national policy, justification and effectiveness, and should be deleted or fundamentally amended to align fully with the national regulatory framework.
• 5.94 Alternatively, if Policy CC1 is kept in the RLDP, there must be some flexibility introduced for the requirements of Policy CC1 to fall away should Building Regulations catch up or exceed or require different provisions than the requirements of Policy CC1 during the lifetime of the RLDP. To not provide this flexibility would mean that the ability of the RLDP to deliver the new homes in VoG needs could be compromised. Clarification is also required on how the contribution to the Council’s Project Zero fund is to be calculated and whether the timeframes in Policy CC1 relate to the date of planning approval.
• 5.95 Furthermore, the demands of Policy CC1 have to be considered in the context of all of the other demands that impact on development viability (e.g. affordable housing). The Council must provide evidence that an assessment has been undertaken to demonstrate that development, specifically the housing allocations in Policy HG1, can bear the cumulative policy costs of the RLDP, including Policy CC1.
• 5.96 The policy wording should be amended so that the performance requirements apply based on the date of planning permission rather than the RLDP adoption date. Changes in energy performance requirements can significantly affect site layout, building orientation, and design considerations. Without this amendment, approved schemes could unnecessarily require variations via Section 73 or Non Material Amendment applications.
• 5.97 As such, Policy CC1 should be amended to ensure that it is precise, measurable and enforceable and achieves the three tests of soundness. The proposed amended wording is as follows:
•
Developments that secure a planning permission from RLDP adoption to 31st March 2030 will be required to meet the following criteria:
i. Space heating demand less than or equal to 40kWh/m2/year;
ii. Energy use intensity less than or equal to 75kWh/m2/year; and Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.98 Barratt Redrow do not consider that Policy SP13 – Community Infrastructure and Planning Obligations is required. This is predicated on the basis that such matters are dealt with under separate legislative and policy frameworks. Therefore, as currently drafted the proposed policy (and supporting text) do not add anything further information for planning purposes and risk unnecessary duplication.
• 5.99 Whilst there are no comments regarding the principle, thresholds and use of the FIT standards in terms of the open space provision, Barratt Redrow do question the requirement for an Open Space Strategy for all sites that meet the thresholds.
• 5.100 The requirement within emerging Policy CI1 for applicants to prepare or submit an Open Space Strategy is not considered to be sufficiently justified or proportionate when assessed against Planning Policy Wales, which promotes access to open space and recreational provision but does not prescribe the preparation of standalone Open Space Strategies for individual planning applications. There is a lack of clarification as to what it proposed and also how the level of detail would be proportional to the size of the site, which would be addressed comprehensively in a DAS or Green Infrastructure Statement in any event.
• 5.101 Furthermore, the proposed 62.2 m² per dwelling requirement is overly prescriptive and not aligned with FiT’s methodology, which is per person and intended to be applied strategically across different open space typologies, not as a uniform per dwelling metric. FiT’s approach emphasises flexibility, multifunctionality and local context, meaning that applying a rigid per dwelling standard oversimplifies the guidance and risks generating disproportionate land take and unnecessary design constraints. When combined with the wider cumulative policy burdens of the RLDP, such an approach has the potential to impact development viability and reduce delivery.
• 5.102 In principle Barratt Redrow support the aim of this policy in ensuring proposed development incorporate measures that protect and enhance green infrastructure provision.
• 5.103 For completeness Swn Y Coed, Wenvoe exhibits a landscape led design that sensitively responds to its existing features, and provides an attractive, landscaped and high-quality public realm throughout. A number of priority habitats including a network of hedgerows have been retained throughout. Extensive landscape buffers and a continued natural edge will be provided to the site to accommodate root protection zones of existing trees and hedgerows which visually screen the development from adjacent uses. Moreover, a dedicated area of Public Open Space and Local Equipped Area of Play (LEAP) is proposed to the south of the site.
•
Developments that secure a planning permission from 1st April 2030 onwards will require:
i. Space heating demand less than or equal to 15kWh/m2/year;
ii. Energy use intensity less than or equal to 40kWh/m2/year; and
Policy SP13 - Community Infrastructure and Planning Obligations
Policy CI1 – Open Space Provision
Policy SP19 – Green Infrastructure Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.104 Barratt Redrow object to the continued inclusion of Swn Y Coed within the Dyffryn Basin & Ridge Slopes - 5 Special Landscape Area (SLA) under Policy DNP1.
• 5.105 As highlighted in Background Paper BP28 – Special Landscape Areas, Paragraph 1.8, the Council considers that the SLA as defined in the 2008 ‘Designation of Special Landscape Areas - Final Report’ remain relevant, up-to-date, and based on current best practise and have therefore not undertake a review of the report to inform the emerging Replacement Local Development Plan (RLDP).
• 5.106 Whilst the Authority have not sufficiently updated their evidence base, the site was subject to a detailed review as part of the Candidate Site submission by Soltys Brewester Landscape which highlighted that the site is located on the edge of land subject to Dyffryn Basin and Ridge Slopes SLA. This designation is ‘underpinned’ by LANDMAP Areas St Nicholas and Bonvilston Ridge Slopes, (VLFGLVS614) and St Nicholas and Bonvilston Ridge Crest (VLFGLVS271), both evaluated as High.
• 5.107 However, the vast majority of the designated land will fall outside the visual envelope for the Swn Y Coed site and there will be no change to the key characteristics of the SLA or the LANDMAP areas to the west or to the north of the site boundary.
• 5.108 A noted characteristic of the SLA relates to the prominence of the sloping edge, (i.e. St Nicholas and Bonvilston Ridge Slopes, (VLFGLVS614), within views from Wenvoe Valley to the east. The visual appraisal establishes that site development has the potential to partially change the appearance of this edge within available views.
• 5.109 However, opportunities for GI provision within the site including retention and enhancement of the existing boundary hedges and trees which has the potential to minimise any visible change. Furthermore, as illustrated on the submitted masterplan, the existing hedges and field pattern within and around the site will be key structural elements guiding and sub-dividing the development form.
• 5.110 When considered in the context of the extensively wooded nature of the slopes visible to the east, any visible change to valley slope characteristics is likely to be very marginal and visually insignificant within the study area.
• 5.111 Moreover, the illustrative masterplan includes measures that will assist with GI mitigation and enhancement, including SUDs features, accessible landscape buffers and green spaces.
• 5.112 Therefore, it was concluded that from a landscape and visual perspective the site has the ability to suitably incorporate residential development and include GI enhancements, to assist with its visual integration, as a visually appropriate extension to Wenvoe, and should be removed from the Dyffryn Basin & Ridge Slopes - 5 Special Landscape Area under Policy DNP1.
•
Policy DNP1 - Special Landscape Areas Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.113 Barratt Redrow object to the site at Swn Y Coed, Wenvoe still forming part of Green Wedge 3 - North of Wenvoe within Policy DNP2, which seeks to prevent coalescence between the western edge of Cardiff and Wenvoe.
• 5.114 Barratt Redrow have reviewed BP27 Green Wedges and consider that the assessment under NW2 does not consider nor reference the fact that the site at Swn Y Coed relates to the context of built development at Wenvoe and is very well-contained by both mature woodland and landform and possesses strong intervisibility with the northern edge of Wenvoe. Instead, BP27 looks to discuss the southern boundary of Culverhouse Cross and the association with the wider countryside.
• 5.115 As previously states Barratt Redrow consider that the site boundaries are well-defined and would provide a strong established ‘defensible’ limit to development. The topography connects with the main settlement to the extent that any new development would appear well connected to the existing settlement, physically and visually. This is a similar situation to the adjoining former Wenvoe Quarry and Vale of Glamorgan Council Depot which are considered to be ‘largely shielded from view by woodland blocks/strips’.
• 5.116 Furthermore, the existing dispersed housing and the hotel/pub along Old Port Road also provide some precedent for ‘infilling’ the site. Proposed development should seek to reflect the low density, height and well-treed character of Wenvoe to help ensure it has a coherent and visually connected relationship. GI mitigation and enhancement benefits likely to result from the site development, including placemaking, value or integration in relation to landscape and visual considerations.
• 5.117 The proposed development of the small area of the Green Wedge would not undermine the principles and would still prevent the coalescence of Wenvoe with Cardiff by maintaining a minimum 0.7km separation and would not significantly impact upon the openness of land.
• 5.118 Moreover, the illustrative masterplan provided as part of Candidate Site 437 includes measures that will assist with GI mitigation and enhancement, including SUDs features, accessible landscape buffers and green spaces. Further recommendations to maximise opportunities to reinforce GI, including placemaking, value or integration are outlined below:
• 5.119 Overall, Barratt Redrow maintain their objection to the inclusion of the Swn Y Coed site within Green Wedge 3 - North of Wenvoe under Policy DNP2. From a landscape and visual
•
Policy DNP2 – Green Wedges
• Retention, management and strengthening of structural green corridors and boundaries to the site, including the overgrown hedges and trees;
• More visible areas on elevated sections of the site should include a higher proportion of trees, including gardens and street trees and woodland to more visually integrate the development when viewed from the Wenvoe Valley to the east; and
• Footpath corridors through the site could be integrated with the development through appropriate hedge and garden vegetation to ensure attractive recreational corridors are provided. Similarly informal routes around the perimeter could continue to offer amenity value through sympathetic boundary treatments and informal planting.
Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• perspective, the site has the ability to suitably incorporate residential development and include GI enhancements, to assist with its visual integration, as a visually appropriate extension to Wenvoe. Moreover, the development of the site immediately adjoining the existing settlement boundary at Wenvoe would not detract from the purpose of the wider Green Wedge.
• 5.120 Policy DNP8 seeks to address recreational pressure on the Severn Estuary Special Area of Conservation, Special Protection Area and Ramsar Site. Whilst Barratt Redrow appreciate the overarching purpose in its current form the proposed policy lacks sufficient supporting information explaining how it will operate in practice. The supporting text suggests that key details relating to mitigation delivery, including mechanisms such as Suitable Alternative Natural Greenspace and wider access management measures, will be set out in future Supplementary Planning Guidance. Deferring these important details until later down the line creates uncertainty at the plan-making stage and makes it difficult to assess whether the policy is sound, effective and/ or capable of being implemented on a consistent basis.
• 5.121 The policy also provides no clear threshold or criteria for determining what level of activity would constitute “visitor pressure” or an “adverse impact” on the integrity of the designated sites. Similarly, the evidence demonstrating what level of impact residents moving into new homes across the Vale of Glamorgan will generate additional recreational pressure on the Severn Estuary does not appear to have been quantified to date. While a 12.6 km recreational catchment is referenced (in which Swn Y Coed, Wenvoe would technically sit within), the supporting text does not clearly explain the evidence or methodology underpinning this distance. Moreover, the proposed text also fails to set out how new residential development will be assessed in terms of measurable impacts on the European site and thus the scope of mitigation that would subsequently be required.
• 5.122 From a practical standpoint this level of uncertainty is concerning given the implication of this policy are unable to be fully assessed due to the lack of evidence. For instance, if development sites within the catchment are expected to contribute financially towards mitigation measures, then the scale and mechanism of those contributions must be clearly established as part of the plan-making process. Without this clarity, there is a risk that Policy DNP8 could introduce unforeseen costs and extensive time delays, potentially affecting the viability and overall deliverability of proposed housing sites. The cumulative impact of which would then undermining the plan’s ability to meet its housing requirements and risk finding the RLDP unsound.
• 5.123 Barratt Redrow understand the need for a sustainable provision of minerals, as per Policy SP18, however object to the continued inclusion of Swn Y Coed, Wenvoe within an area that is designated as a Category 1 Limestone mineral resource. The site should not be safeguarded from permanent development as detailed in response to Policy MIN1.
•
Policy DNP8 – Severn Estuary Recreational Pressure
SP18 - Sustainable Provision of Minerals Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 5.124 Barratt Redrow object to the continued inclusion of the land at Swn Y Coed as a Category 1 Limestone mineral resource safeguarding area.
• 5.125 A Mineral Resource Assessment, undertaken by Wardell Armstrong, was provided as part of the Candidate Site Assessment and considered the proposed development against the four criteria of Policy MG 22 of the current Adopted Local Development Plan and National Policy. Those criteria are carried forward into Policy MIN1 and the following conclusions are reiterated:
• 5.126 As the resource is constrained by sensitive development any prior extraction would have an unacceptable impact on environmental and amenity considerations.
• 5.127 Limestone extraction has the potential to give rise to unacceptable impact to the immediate residential properties and would be wholly inappropriate.
• 5.128 The extraction of limestone resources beneath the Site has the potential to have an unacceptable impact upon:
•
MIN1 - Development in Minerals Safeguarding Areas
• Criterion 1: Prior extraction of economic minerals prior to development
• Criterion 2: Demonstrating extraction would have unacceptable impact
a) Ambient noise levels,
b) Air quality,
c) Ground vibration and air overpressure from blasting,
d) Limited site access/egress onto the Old Port Road would be problematic, and
e) Increased traffic generation by HGVs.
• Criterion 3: Development would have no significant impact on the possible working of the resource by reason of its nature or size 5.129 Development would not have significant impact on mineral resources
•
• Criterion 4: Poor quality resource 5.130 The quality and quantity of the mineral resources have not been assessed given the resource is already constrained by sensitive development and any testing or extraction would not be viable nor possible.
• 5.131 As already demonstrated the Category 1 resources cannot be extracted under Criteria 1 and 2 (due to the impact upon amenity) and the proposed residential development would not have a significant impact upon the wider mineral resource (Criterion 3).
• 5.132 Therefore, it is considered unnecessary to undertake site investigations by boreholes and trial pits to determine the ratio of overburden to mineral resource, mineral quality and estimation of the gross mineral resource affected by the proposed development.
• 5.133 Overall, Barratt Redrow consider that the presence of the mineral resource does not preclude the allocation and development of the site as any extraction does not accord with the criteria
•
Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• requirements in MIN1. Therefore, the site at Swn Y Coed should be removed from the safeguarding area.
• 5.134 Barratt Redrow acknowledge the need to retain buildings in some circumstances, however consider that the wording of Policy CC2 is overly restrictive in the sense that a presumption against demolition could impact upon delivery timescales for sites, particularly those including farm buildings.
• 5.135 Accordingly, it is considered necessary to re-word the policy to allow for the demolition of buildings where they are no longer used or needed in the event that a site is proposed to be developed for residential purposes, to assist in meeting the housing need over the plan period.
• 5.136 An additional point should be added to the list of 4 criteria, to note that demolition will be acceptable where it is demonstrated that ‘The existing building occupies a minority portion of the site, and to not demolish the building would prevent and/or restrict the delivery of the wider land for the provision of housing’.
•
CC2 – Presumption Against Demolition Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
• 6.1 In summary, Barratt Redrow, remain committed to the development opportunities at ‘Swn Y Coed, Wenvoe’. By virtue of its location the site represents a sustainable extension to the existing settlement of Wenvoe, and we maintain that its inclusion within the emerging RLDP would help promote a more sustainable pattern of development in line with the Council’s vision for the VoG.
• 6.2 Although we understand the Council have opted to pursue a ‘medium growth option’. Having reviewed the accompanying evidence base there is clear justification to warrant higher levels of growth, particularly in respect of housing over the emerging plan period. This would better accommodate the identified housing requirements and align with the Welsh Government’s aspirations to prioritise future development within a National Growth Area. These principles fully accord with PPW12 and Future Wales, whilst also enabling the VoG to proactively take action in order to account for historic unmet need across the county as shown within the latest Annual Monitoring Report (7th Edition).
• 6.3 Barratt Redrow Homes’ most pertinent comments on the consultation document are summarised below:
•
6. CONCLUSION
• Barratt Redrow fully supports the proposed approach to prioritise development in sustainable locations near existing rail and bus infrastructure as depicted by the strategic growth area within the RLDP Key Diagram. However, to optimise the effectiveness of this strategy growth should be focused in areas of high demand, such as Wenvoe, which is near to Cardiff but also inherently well connected by the existing bus network.
• Barratt Redrow support the principle of the Settlement Hierarchy and the identification of Wenvoe as a Primary Settlement. Whilst the importance of which is noted, Barratt Redrow maintain that Wenvoe, in particular, is capable of a higher role and function which can be accommodated at Candidate Site Ref. No 437. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
• Barratt Redrow maintain that a higher growth option should be followed. Given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to overall housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
• In the interests of soundness these changes shall help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Barratt Redrow therefore conclude that a higher flexibility allowance and additional site allocations, such as the land at Swn Y Coed, are necessary to ensure the RLDP is able to effectively meet
Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437
local need over the plan period. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
• Whilst Barratt Redrow welcome the majority of the proposed planning policies from a development management perspective. They strongly object to Policy CC1 (Residential Operational Net Zero Carbon Development) on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework.
• Although Barratt Redrow support the requirements for affordable housing in new development. In its current form the proposed policies SP7 and SP8 lack sufficient flexibility for site specific circumstances and physical constraints which may impact upon delivery. This inevitably creates uncertainty for a number of sites, where the blanket approach to affordable housing requirements based on the Council’s latest needs evidence does not have due consideration for the event of unique technical complexities.
• From a planning perspective it is also important to recognise the additional benefits the site (Candidate Site Ref No. 437) could provide in accommodating the increased housing need generated by the suggested 15% flexibility allowance within a highly sustainable location. The principles of which clearly align with the Council’s aspirations and would maximise opportunities for linked trips, enabling residents to meet a greater proportion of their daily needs locally while benefiting from high-quality public transport