Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6959

Derbyniwyd: 11/03/2026

Respondent ID: 3726

Ymatebydd: Mr Robin Woodman

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

1. Increased Congestion
Due to the lack of bypass in Dinas Powys, there is only one main road that runs from Barry to Cardiff. With the increased houses built over the Murch within the last 10 years, the traffic has increased drastically, which resulted in further congestion, so is already proving difficult to join this road from our house. The addition of 250 houses with 300-500 additional houses onto an already overburdened road, would cause significant congestion + bottle neck. The infrastructure has never expanded or improved as Dinas Powys has grown to leaves the current residents at considerable disadvantage.
2. Doctors and Schools at capacity
As Dinas Powys had grown, the infrastructure has failed to keep up. No investment has been made up to accommodate the additional families/people who now reside in. Dinas Powys and the GP/surgeries are struggling to keep up. Residents already face a delay in appointment, with 10 day for blood tests which is detrimental to their physical and mental health. With the threat of 300-500 new homes being built, the burden this will add to a struggling health service would cause further disruption and delays, which will affect peoples health.
3. Increased Flooding
Water run off from Eastbrook site will enter the Cadoxton river which has burst+flooded homes in Dinas Powys, which will only get worse.
4. Losing identity
GP has grown and continues to grow, I feel it's not in keeping it's lovely rural feel of a village.
5. School
Over subscribed currently. No improvements have been made into the existing infrastructure to accommodate more families moving to the area. With the additional homes being built, this further threatens the education system which is already struggling.

Testun llawn:

1. Increased Congestion
Due to the lack of bypass in Dinas Powys, there is only one main road that runs from Barry to Cardiff. With the increased houses built over the Murch within the last 10 years, the traffic has increased drastically, which resulted in further congestion, so is already proving difficult to join this road from our house. The addition of 250 houses with 300-500 additional houses onto an already overburdened road, would cause significant congestion + bottle neck. The infrastructure has never expanded or improved as Dinas Powys has grown to leaves the current residents at considerable disadvantage.
2. Doctors and Schools at capacity
As Dinas Powys had grown, the infrastructure has failed to keep up. No investment has been made up to accommodate the additional families/people who now reside in. Dinas Powys and the GP/surgeries are struggling to keep up. Residents already face a delay in appointment, with 10 day for blood tests which is detrimental to their physical and mental health. With the threat of 300-500 new homes being built, the burden this will add to a struggling health service would cause further disruption and delays, which will affect peoples health.
3. Increased Flooding
Water run off from Eastbrook site will enter the Cadoxton river which has burst+flooded homes in Dinas Powys, which will only get worse.
4. Losing identity
GP has grown and continues to grow, I feel it's not in keeping it's lovely rural feel of a village.
5. School
Over subscribed currently. No improvements have been made into the existing infrastructure to accommodate more families moving to the area. With the additional homes being built, this further threatens the education system which is already struggling.

Atodiadau: