Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6530

Derbyniwyd: 11/03/2026

Respondent ID: 2024

Ymatebydd: Mr Michael Hughes

Cadarn? Heb nodi

Effeithiau ar y Gymraeg:

This all depends on who comes to live there which is an unknown factor.

Crynodeb o'r Gynrychiolaeth:

1. This will result in the loss of habitats for a large variety of wildlife which will have a detrimental affect on Dinas Powys.
2. Doctors are already over capacity with a heavy workload and additional homes with an average of 2+ homes will exacerbate the problem with catastrophic results.
3. Dinas Powys already experiences regular flooding, including on Cardiff Road. Attenuation systems still release water and rely on functioning control systems, meaning failure or capacity could result in major flooding.
4. How will the local foul sewerage system be able to cope with the increased flow from the new developments, will the developers be installing new pipes to the sewerage works digging up the main roads in Dinas Powys with months of chaos?
5. Roads are already heavily congested and any additional traffic will increase existing pollution. This is also likely to become another excuse to build a bypass which has to be avoided.
6. Eastbrook station car park is totally inadequate which results in additional car journeys. Development will make this matter worse.
7. Present schools are already over capacity.
8. Developments will enlarge the area and join it with Barry, Penarth and Llandough resulting in loss of identity.
9. While restrictions will be imposed on the contractors, these are not always adhered to and difficult to monitor resulting in more disruption to the residents of Dinas Powys.

Atodiadau: