Tir i'r de o Port Road

ID sylw: 5844

Derbyniwyd: 10/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Object to the rolling forward of Model Farm development with no viability assessment as you requires in order that "the RLDP can satisfy new policy requirements and remain viable and deliverable" (refs. DMM+PPW)
The High Court blocked the first officer-recommended approval, because the non-viability had been concealed; this was one reason for Committee rejection in March’23. To now exempt it from viability assessment deviously ignores the your prescription for rolling forward, which the RLDP team has been unable to justify.
The site had no sustainability/viability assessment for the 2015 LDP, pretending siting in the Enterprise Zone covered it.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

Tir i'r de o Port Road

ID sylw: 5854

Derbyniwyd: 10/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We submitted a "comment" but need to ensure it's taken as an objection to rolling forward this development into the RLDP. Exempting it from Site Specific Viability Assessment shows unacceptable bias - evidence shows it's unviable.
Its siting in CA&StAthan EnterpriseZone does not exempt it from sustainable development and viability requirements. 'FutureWales' recognised the EZ as a strategic economic location that complements (but does not replace) the National Growth Area structure. The EZ is not a Growth Area itself, but it supports the NGA’s economic role.
The attached document ModelFarm-failsDMMcriteria FoE09Mar'26 gives supporting evidence from DMM and FutureWales.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG2 (4)

ID sylw: 6118

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The site does not appear viable. The flooding problems from the land above are difficult and costly to resolve. They relate to the unresolved flooding on Llandough Hill spilling over the Penarth Road. No drainage solution has been reached so the development is on-hold. The developer already demanded reduced S.106 with small fraction of affordable homes. For "deliverability" (WGovt manual DMM), it needs to be subject to a Stage 3: Site Specific Viability Assessment, in order to ensure that sites which progress to allocation within the RLDP can satisfy new policy requirements and remain viable and deliverable.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG2 (1)

ID sylw: 6122

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

Cosmestutline application as approved in March 2024 is still not final. on housing development has not been finalisd. The oEven if that outline was signed, the details are not. It’s included in the RLDP as a landbank site to be rolled forward.
The RLDP inclusion for rolling forward is contrary to the DMM requirement that site-specific allocations have delivery/viability evidence. A Stage 3: Site Specific Viability Assessment is needed, in order to ensure that sites which progress to allocation within the RLDP can satisfy new policy requirements and remain viable and deliverable.
We attach fuller argument.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 (1)

ID sylw: 6135

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

An alternative site is needed for the re-build of Richard Gwyn school. Flooding is a strong constraint on the idea of rebuilding on the same site. No assessment re predicted higher flood levels; no solution for walking access via the tunnel during flooding; no assessment of completing the active travel access from Coldbrook with a tunnel to meet WGovt standards.
We anticipate the WGovt rejects the rebuild on the present site on grounds of flooding. This site at Pencoedtre is one of the few alternatives. It was school land so the education departement should reclaim it for new RichardGwyn.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 KS2- TIR I'R GOGLEDD O DDINAS POWYS

ID sylw: 6189

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The KS2 requirements say: a secondary access closer for emergencies as well as pedestrians and cycling. Highways asked the applicant to respond but they were unsuccessful
# no drawings of the sole suggested access onto Cardiff Rd using the farm gateway by Wayside cottages
# blockage of access to carparking at one side, removal of parking space at the other
# limited visibility with roadside cottages and narrow pavement, roadway too narrow for a turning lane
# reported impossible to insert cycling and pedestrian lanes on CardiffRd to meet Active travel minimum standards so gave up.
The development is unviable.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 - HOUSING ALLOCATIONS

ID sylw: 6533

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

- Essential that viability information is provided for all Candidate Sites
- We do not find this reuirement has been met for All sites
- 3.44 PPW sets out the policy …housing delivery in the development plan process. A key element of this is ensuring financial viability is assessed at the candidate site stage. The site promoter (LPA, land owner and/or developer) must carry out an initial site viability assessment and provide evidence that sites can be delivered. As required by national policy, all candidate sites are subject to a viability assessment.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

Ardal Twf Strategol

ID sylw: 6537

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

- Strategic Growth Area: Focuses on settlements with good transport links to reduce car dependency.

You say this but Rhoose to St Athan fail it
- Rhoose: Key site for 339 homes north of the railway and employment development, including land east of Cardiff Airport (16.3 ha) and south of Port Road (44.75 ha).
- St Athan & Llantwit Major: Targeted for residential development, including 235 units near Eglwys Brewis Road and 105 units at St Athan Road., Clive Rd 51, Church Farm 500, west of St Athan 600
-
- Can’t be called “good transport” without the railway – more frequent than hourly and with stations at Eglwys Brewis and St Athan. The 304 bus taking over an hour to Cardiff isn’t “good”. road transport is caught in snarl-ups at Weycock Cross and Culverhouse Cross.
- Single access key sites and others over 100 homes are not deliverable

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 KS4 - TIR YN CHURCH FARM, SAIN TATHAN

ID sylw: 6800

Derbyniwyd: 06/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

On specifics, KS4 and KS5 say of capacity limits at West Aberthaw works that "DCWW has confirmed that upgrades are planned as part of the AMP8 programme 2025 and 2030". Can you provide documents on this?
WW said in 2015 they "planned" upgrades so questions are obvious - is the W.Aberthaw upgrade still not programmed and committed? Are the plans sufficient to take the much bigger numbers of homes now planned. Will land purchase and planning consent be needed? Will the developers proposing local sites have to pay via S.106?

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 KS5 - TIR I'R GORLLEWIN O SAIN TATHAN

ID sylw: 6801

Derbyniwyd: 06/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

On specifics, KS4 and KS5 say of capacity limits at West Aberthaw works that "DCWW has confirmed that upgrades are planned as part of the AMP8 programme 2025 and 2030". Can you provide documents on this?
WW said in 2015 they "planned" upgrades so questions are obvious - is the W.Aberthaw upgrade still not programmed and committed? Are the plans sufficient to take the much bigger numbers of homes now planned. Will land purchase and planning consent be needed? Will the developers proposing local sites have to pay via S.106?