1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6122

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

Cosmestutline application as approved in March 2024 is still not final. on housing development has not been finalisd. The oEven if that outline was signed, the details are not. It’s included in the RLDP as a landbank site to be rolled forward.
The RLDP inclusion for rolling forward is contrary to the DMM requirement that site-specific allocations have delivery/viability evidence. A Stage 3: Site Specific Viability Assessment is needed, in order to ensure that sites which progress to allocation within the RLDP can satisfy new policy requirements and remain viable and deliverable.
We attach fuller argument.

Testun llawn:

Cosmestutline application as approved in March 2024 is still not final. on housing development has not been finalisd. The oEven if that outline was signed, the details are not. It’s included in the RLDP as a landbank site to be rolled forward.
The RLDP inclusion for rolling forward is contrary to the DMM requirement that site-specific allocations have delivery/viability evidence. A Stage 3: Site Specific Viability Assessment is needed, in order to ensure that sites which progress to allocation within the RLDP can satisfy new policy requirements and remain viable and deliverable.
We attach fuller argument.