Crynodeb o'r Gynrychiolaeth:

The site does not appear viable. The flooding problems from the land above are difficult and costly to resolve. They relate to the unresolved flooding on Llandough Hill spilling over the Penarth Road. No drainage solution has been reached so the development is on-hold. The developer already demanded reduced S.106 with small fraction of affordable homes. For "deliverability" (WGovt manual DMM), it needs to be subject to a Stage 3: Site Specific Viability Assessment, in order to ensure that sites which progress to allocation within the RLDP can satisfy new policy requirements and remain viable and deliverable.

Testun llawn:

The site does not appear viable. The flooding problems from the land above are difficult and costly to resolve. They relate to the unresolved flooding on Llandough Hill spilling over the Penarth Road. No drainage solution has been reached so the development is on-hold. The developer already demanded reduced S.106 with small fraction of affordable homes. For "deliverability" (WGovt manual DMM), it needs to be subject to a Stage 3: Site Specific Viability Assessment, in order to ensure that sites which progress to allocation within the RLDP can satisfy new policy requirements and remain viable and deliverable.