1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

Chwilio sylwadau

Canlyniadau chwilio Taylor Wimpey

Chwilio o’r newydd Chwilio o’r newydd

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP1 – STRATEGAETH TWF CYNALIADWY

ID sylw: 6844

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey consider that to date the growth strategy has placed disproportionate emphasis on identifying an alternative site within Barry, rather than giving due consideration to potential sites in nearby high‑performing settlements such as Sully. Taylor Wimpey therefore strongly encourage the VoG to widen the search for additional allocations beyond the administrative boundary of Barry Town Council and to consider locations that represent a logical and sustainable extension to neighbouring primary settlements that are located within the Strategic Growth Area, including Sully.

The six key elements of the Sustainable Growth Strategy are noted and Taylor Wimpey support a spatial strategy that locates major new development for the delivery of sustainable housing growth in appropriate locations, such as Sully, that are supported by the relevant infrastructure, services and facilities. Providing new homes within Phase 3 aligns with the Strategic Growth Area identified within the RLDP Strategy which forms the primary focus for housing growth.

Policy SPG1 continues to identify Sully as a location where new housing development will be concentrated, therefore establishing a principle of development for Phase 3 and help to further align the provision of new housing with the existing facilities of Sully, reducing the need to travel. Sully represents an inherently sustainable location for future growth and aligns well with the Sustainable Transport Oriented Growth Option. As identified in the Deposit RLDP, Sully is classified as a Primary Settlement and performs a complementary role to Barry as a key centre. Its position within the Strategic Growth Area further indicates that an appropriate level of development at Sully would be acceptable, with both existing housing delivery and the current allocation at Swanbridge Road supporting its established role.

With existing development ongoing to the north of the Site, at Phases 1 and 2 of Land West of Swanbridge Road, Phase 3 is considered to provide an appropriate level of growth in a sustainable location that would form a logical extension to existing allocations. The sustainability and suitability of Sully to accommodate residential development is reinforced by the allocation of 500 dwellings under Policy MG2(37) (‘Land West of Swanbridge Road, Sully’) on land directly north of the site promoted by Taylor Wimpey. The progression of this location into a phase 3 development would continue to strengthen Sully’s function as a primary settlement and would constitute a logical and coherent extension to the existing built form.

Taylor Wimpey appreciate the aspirations of the Council to deliver housing to meet the identified future housing needs of the VoG and wider growth aspirations of the South East Wales Region at a strategic level. Taylor Wimpey support the revised strategy moving away from North East Barry, however maintain the position that this level of growth should be re-allocated to those locations that are most suitable for growth, including sustainable settlements outside of Barry. Growth should not be focuses solely on Barry.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP2 – HIERARCHAETH ANEDDIADAU

ID sylw: 6845

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey support the conclusions of the Settlement Appraisal Review Background Paper which identifies Sully as a Primary Settlement, reflecting its important role in providing a level of housing growth, in addition to key local services and facilities. Within this Background Paper, Sully is recognised for its vital role as a sustainable community, scoring highly across all key principles in demonstrating its sustainability by providing for the day-to-day needs of its residents. Taylor Wimpey concur with the supporting evidence which reinforces Sully’s importance within the settlement hierarchy.

Whilst Draft Policy SP2 presents a ‘broad distribution of development within the Strategic Growth Area..’, serious concerns continue to be raised around the level of growth around Barry and the emphasis placed on it as the focus for future development. Taylor Wimpey do not dispute the identification of Barry as a Key Settlement, given its position as the largest town within the VoG, however believe Barry should not remain the sole focus for growth where there are opportunities available around primary settlements located within the Strategic Growth Area.

Put another way, it seems perverse for the Deposit RLDP to direct no new growth to a Primary Settlement within the identified Strategic Growth Area.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 KS1 - TIR YNG NGOGLEDD-ORLLEWIN Y BARRI

ID sylw: 6846

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey formally objects to the allocation of Land at North West Barry (Policy HG1 KS1) within the Replacement Local Development Plan (RLDP), asserting that the site is structurally inferior to their proposed alternative, Land West of Swanbridge Road (Phase 3), Sully. While the Vale of Glamorgan Council introduced the North West Barry site as a replacement for the undeliverable North East Barry allocation in July 2025, Taylor Wimpey maintains that this selection fails to meet the sustainability and accessibility standards required for a Key Site.

A primary concern is the site's poor performance within the Integrated Sustainability Appraisal (ISA). Taylor Wimpey’s analysis indicates that North West Barry incurs significantly more negative impacts and "unknown" outcomes than the Sully site. These unknowns introduce a level of delivery risk and uncertainty that could undermine the RLDP's housing targets. In contrast, the Land West of Swanbridge Road demonstrates a higher frequency of "significantly positive" scores, particularly regarding its capacity to deliver over 100 dwellings without encroaching on designated green wedges.

From an accessibility standpoint, Taylor Wimpey argues that North West Barry is isolated on the urban fringe. The site is separated from existing community hubs by the A4226 and B4266, which act as physical barriers to pedestrians and cyclists. Conversely, the Sully site is integrated into an established village infrastructure. It sits within 800 meters of health services and active travel routes, with the High Street’s amenities located within a 10-minute walk. Residents in Sully would benefit from a robust public transport network, including bus and rail links to Cardiff, Barry, and Penarth, all within a 15-minute catchment.

Furthermore, Taylor Wimpey highlights that the Sully site is better positioned to leverage future infrastructure investments, such as the South Wales Metro and planned active travel links between Palmerstown and Dinas Powys. While the council notes that North West Barry is slightly closer to a bus stop, Taylor Wimpey points out that the services available from Sully are more frequent and direct, offering a more genuine alternative to private car use.

In conclusion, Taylor Wimpey considers the current allocation of North West Barry to be unsound. They contend that the Land West of Swanbridge Road represents a more sustainable, accessible, and certain solution for meeting the region's housing requirements. They urge the Council to reconsider the evidence provided in the ISA comparisons and SLR Consulting’s sustainability audits to ensure the most effective sites are brought forward for development.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

CI1 – DARPARIAETH MANNAU AGORED

ID sylw: 6847

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

This policy consists of four parts which, combined, dictate how open space should be provided. These parts of the policy set expectations for the level of public open space that should be provided for, confirm that provisions for open space should also be made for commercial uses, notes that it is expected that open space will be provided onsite, and requires that an open space strategy is submitted as part of applications where open space is required to be provided.

Taylor Wimpey note that Policy CI1 (Open Space Provision) of the Deposit RLDP, when compared with Policy MD3 (Provision of Open Space) of the adopted LDP, proposes an increase in public open space provision from a total of 2.4ha / 1000 people to 2.75ha / 1000 people.

Taylor Wimpey is not clear as to what has driven the increased level of public open space that Policy CI1 (Open Space Provision) identifies as being required and would welcome clarification on this matter,

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

DNP5 – ENVIRONMENTAL PROTECTION

ID sylw: 6849

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey consider the inclusion of ‘the loss of the best and most versatile agricultural land’ to be at odds with the other elements listed, where unlike the others mentioned, the loss of agricultural land would have limited, if any, impact on people, residential amenity and property.

It is acknowledged that the loss of BMV agricultural land may impact the VoG’s overall amount of high quality agricultural land, however this should be assessed against the existing high level of BMV agricultural land within the County. The extent to which its loss is considered “unacceptable” should be subject to the planning balance against the overriding need for affordable housing and local housing need. Consideration towards the farming business case and economic viability are also required within the planning balance. In the case of Land West of Swanbridge Road, the loss of BMV agricultural land remains the only constraint that cannot be overcome, as noted in the Candidate Site Assessment. Whilst the loss of high quality agricultural land should be avoided, Taylor Wimpey consider that where the merits of the Site are overwhelmingly in favour for sustainable residential development in a suitable and logical location, Policy DNP5 should not stand in the way of housing delivery.

Whilst Taylor Wimpey support the clause within the draft policy: “Where impacts are identified the Council will require applicants to demonstrate that appropriate measures can be taken to minimise the impact identified to an acceptable level. Planning conditions may be imposed, or legal obligation entered into, to secure any necessary mitigation and monitoring processes.” However, in the context of BMV agricultural land, it is not clear how the mitigating measures, in the form of planning conditions or legal obligations, can be applied. This reinforces the earlier view that the inclusion of ‘the loss of the best and most versatile agricultural land’, as currently worded within the draft policy, is at odds with the other elements listed where mitigation strategies for pollution can be suitably conditioned.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

Sili i Cosmeston.

ID sylw: 6850

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey support the designation of an active travel route connection the eastern side of Sully with Cosmeston in the north-east. Most notably the proposed route will pass Swanbridge Road which provides direct access to Land West of Swanbridge Road Site, with Phase 3 in close proximity to the travel route. The proposal would further enhance the accessibility and sustainability of the Site as a logical extension for residential development in Sully.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

Cylchfan Weycock Cross, y

ID sylw: 6851

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey raise concerns around the proposed works at the Wyecock Cross Roundabout, compared to the other improvement works proposed. As noted in the Deposit RLDP, this roundabout forms a key connection within the wider strategic highway network and therefore of high importance for the local area and surrounding communities. The proposed options presented within the Deposit RLDP provide little certainty of the scope of works required with no preferred option identified. This raises concerns around the impacts of the highway improvements on the deliverability of the adjacent draft allocation of North West Barry. The same concerns arise when considering the roundabout improvement works in combination with the proposed access strategy contained within North West Barry’s supporting information package. The proposed road widening measures (c.11m increase) required to make the draft allocation accessible would have a significant impact on the wider transport network at this strategic junction.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

CC1 - DATBLYGIADAU CARBON SERO NET PRESWYL GWEITHREDOL

ID sylw: 6852

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey formally expresses significant concerns regarding Policy CC1 (Residential Operational Net Zero Carbon Development), which mandates that new build developments achieve net-zero operational emissions. This policy requires adherence to a specific energy hierarchy, setting stringent space heating and energy use intensity standards from the adoption of the RLDP through 2030 and beyond. It further requires on-site renewable electricity generation equivalent to a development's annual energy consumption, only allowing for off-site contributions or heat network connections when on-site solutions are technically unfeasible.

A primary objection raised by Taylor Wimpey is that setting local requirements that exceed national Building Regulations, such as the 2025 Future Homes Standard, is inappropriate and creates an uneven framework for housebuilders. They argue that Building Regulations are the proper mechanism for establishing fixed technical requirements. In the English context, a Written Ministerial Statement—which has been upheld by judicial review—clarified that local plans should not set energy efficiency standards stricter than national regulations. While Taylor Wimpey acknowledges this is a Westminster position, they contend it is incorrect to suggest there is a clear emerging trend for such localized policies in England.

Furthermore, Taylor Wimpey notes a lack of precedent within the Welsh planning landscape. They point out that two recently adopted RLDPs in South East Wales did not include such policies, leading to a lack of confidence that Policy CC1 will be found sound at examination. The company also questions the robustness of the Council’s viability evidence, noting that the cost analysis is based on only three building typologies. This narrow scope fails to account for the broad range of house types used by active developers across Wales, which Taylor Wimpey suggests leads to a significant underestimation of delivery costs.

The financial viability of these requirements is a major point of contention, as Taylor Wimpey’s experience suggests the actual cost per unit is closer to £15,000 or £20,000, far higher than the Council’s estimates. They also highlight a significant timing gap in the evidence; the cost assessments were established in early 2024, yet the housing trajectory does not forecast first completions until 2028 or 2029. This five-year lag between the cost baseline and actual delivery creates unacceptable uncertainty. Consequently, Taylor Wimpey concludes that Policy CC1 is out of step with broader planning approaches and lacks the necessary certainty to be implemented without harming the overall deliverability of housing.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP6 - GOFYNIAD TAI

ID sylw: 6853

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey maintains that the current housing requirement in the Deposit Revised Local Development Plan (RLDP) is fundamentally undervalued. By relying on a ten-year dwelling-led scenario, the methodology incorporates a period of suppressed supply caused by the delayed adoption of the previous plan. Taylor Wimpey argues that the council must instead align with Planning Policy Wales (PPW) by utilising the latest 2022-based household projections. This shift would increase the housing requirement from the proposed 7,587 units to 9,623 units to accurately reflect demographic evidence.

Regarding the flexibility allowance, Taylor Wimpey asserts that the proposed 10% buffer is insufficient. Evidence from the Annual Monitoring Report 2024-2025 reveals a 20.7% shortfall in completions against previous targets. Consequently, the firm recommends increasing the flexibility allowance to 20%, mirroring recent adjustments made by neighboring authorities like Bridgend, to ensure the housing requirement is actually met despite potential site non-delivery.

Taylor Wimpey also raises significant concerns regarding the reliability of the current land bank and windfall allowances. They suggest a 20% non-delivery discount should be applied to sites with planning permission to account for viability, site constraints, and landowner intentions. Similarly, the firm argues that windfall projections are overly optimistic; following the precedent set by Cardiff Council, they recommend reducing the windfall allowance to 75% of the ten-year average as easily developable sites become increasingly scarce.

Furthermore, Taylor Wimpey disputes the inclusion of certain "rolled forward" sites from the previous plan, specifically land at Pencoedtre Lane and Eglwys Brewis Road. These sites, totaling 370 homes, have failed to deliver despite long-standing policy support due to viability and technical constraints. Taylor Wimpey recommends their removal from the supply tables to maintain a realistic outlook on deliverability.

In conclusion, Taylor Wimpey suggests that the combination of a higher housing requirement, an increased flexibility buffer, and more cautious supply assumptions creates a significant deficit. They calculate that the RLDP must identify new allocations for an additional 3,872 homes to ensure a robust and sound development strategy for the region.

Am gyfarwyddiadau ar sut i ddefnyddio’r system ac i wneud sylwadau, gwelwch ein canllaw cymorth.