Taylor Wimpey formally expresses significant concerns regarding Policy CC1 (Residential Operational Net Zero Carbon Development), which mandates that new build developments achieve net-zero operational emissions. This policy requires adherence to a specific energy hierarchy, setting stringent space heating and energy use intensity standards from the adoption of the RLDP through 2030 and beyond. It further requires on-site renewable electricity generation equivalent to a development's annual energy consumption, only allowing for off-site contributions or heat network connections when on-site solutions are technically unfeasible.

A primary objection raised by Taylor Wimpey is that setting local requirements that exceed national Building Regulations, such as the 2025 Future Homes Standard, is inappropriate and creates an uneven framework for housebuilders. They argue that Building Regulations are the proper mechanism for establishing fixed technical requirements. In the English context, a Written Ministerial Statement—which has been upheld by judicial review—clarified that local plans should not set energy efficiency standards stricter than national regulations. While Taylor Wimpey acknowledges this is a Westminster position, they contend it is incorrect to suggest there is a clear emerging trend for such localized policies in England.

Furthermore, Taylor Wimpey notes a lack of precedent within the Welsh planning landscape. They point out that two recently adopted RLDPs in South East Wales did not include such policies, leading to a lack of confidence that Policy CC1 will be found sound at examination. The company also questions the robustness of the Council’s viability evidence, noting that the cost analysis is based on only three building typologies. This narrow scope fails to account for the broad range of house types used by active developers across Wales, which Taylor Wimpey suggests leads to a significant underestimation of delivery costs.

The financial viability of these requirements is a major point of contention, as Taylor Wimpey’s experience suggests the actual cost per unit is closer to £15,000 or £20,000, far higher than the Council’s estimates. They also highlight a significant timing gap in the evidence; the cost assessments were established in early 2024, yet the housing trajectory does not forecast first completions until 2028 or 2029. This five-year lag between the cost baseline and actual delivery creates unacceptable uncertainty. Consequently, Taylor Wimpey concludes that Policy CC1 is out of step with broader planning approaches and lacks the necessary certainty to be implemented without harming the overall deliverability of housing.