Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6851

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey raise concerns around the proposed works at the Wyecock Cross Roundabout, compared to the other improvement works proposed. As noted in the Deposit RLDP, this roundabout forms a key connection within the wider strategic highway network and therefore of high importance for the local area and surrounding communities. The proposed options presented within the Deposit RLDP provide little certainty of the scope of works required with no preferred option identified. This raises concerns around the impacts of the highway improvements on the deliverability of the adjacent draft allocation of North West Barry. The same concerns arise when considering the roundabout improvement works in combination with the proposed access strategy contained within North West Barry’s supporting information package. The proposed road widening measures (c.11m increase) required to make the draft allocation accessible would have a significant impact on the wider transport network at this strategic junction.