Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6846

Derbyniwyd: 10/03/2026

Respondent ID: 386

Ymatebydd: Taylor Wimpey

Asiant : Savills

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Taylor Wimpey formally objects to the allocation of Land at North West Barry (Policy HG1 KS1) within the Replacement Local Development Plan (RLDP), asserting that the site is structurally inferior to their proposed alternative, Land West of Swanbridge Road (Phase 3), Sully. While the Vale of Glamorgan Council introduced the North West Barry site as a replacement for the undeliverable North East Barry allocation in July 2025, Taylor Wimpey maintains that this selection fails to meet the sustainability and accessibility standards required for a Key Site.

A primary concern is the site's poor performance within the Integrated Sustainability Appraisal (ISA). Taylor Wimpey’s analysis indicates that North West Barry incurs significantly more negative impacts and "unknown" outcomes than the Sully site. These unknowns introduce a level of delivery risk and uncertainty that could undermine the RLDP's housing targets. In contrast, the Land West of Swanbridge Road demonstrates a higher frequency of "significantly positive" scores, particularly regarding its capacity to deliver over 100 dwellings without encroaching on designated green wedges.

From an accessibility standpoint, Taylor Wimpey argues that North West Barry is isolated on the urban fringe. The site is separated from existing community hubs by the A4226 and B4266, which act as physical barriers to pedestrians and cyclists. Conversely, the Sully site is integrated into an established village infrastructure. It sits within 800 meters of health services and active travel routes, with the High Street’s amenities located within a 10-minute walk. Residents in Sully would benefit from a robust public transport network, including bus and rail links to Cardiff, Barry, and Penarth, all within a 15-minute catchment.

Furthermore, Taylor Wimpey highlights that the Sully site is better positioned to leverage future infrastructure investments, such as the South Wales Metro and planned active travel links between Palmerstown and Dinas Powys. While the council notes that North West Barry is slightly closer to a bus stop, Taylor Wimpey points out that the services available from Sully are more frequent and direct, offering a more genuine alternative to private car use.

In conclusion, Taylor Wimpey considers the current allocation of North West Barry to be unsound. They contend that the Land West of Swanbridge Road represents a more sustainable, accessible, and certain solution for meeting the region's housing requirements. They urge the Council to reconsider the evidence provided in the ISA comparisons and SLR Consulting’s sustainability audits to ensure the most effective sites are brought forward for development.