1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4555

Derbyniwyd: 10/02/2026

Respondent ID: 2852

Ymatebydd: Hayley Graham

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Development, housing or business, proposed for Hayes road AND Hayes lane should not be considered due to the proximity to the established Ty Hafan estate. The very nature of Ty Hafan, which is home to dying children, requires zero disturbance from building works, increased traffic and footfall. Vale communities and beyond have already expressed deep concern about development in this area.

Testun llawn:

Development, housing or business, proposed for Hayes road AND Hayes lane should not be considered due to the proximity to the established Ty Hafan estate. The very nature of Ty Hafan, which is home to dying children, requires zero disturbance from building works, increased traffic and footfall. Vale communities and beyond have already expressed deep concern about development in this area.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4788

Derbyniwyd: 23/02/2026

Respondent ID: 2949

Ymatebydd: Mrs Joanna Phillips

Crynodeb o'r Gynrychiolaeth:

Without substantial improvements to public transport and community facilities, every home owner living here will be reliant on owning a car and driving every time they leave the house

Testun llawn:

Without substantial improvements to public transport and community facilities, every home owner living here will be reliant on owning a car and driving every time they leave the house

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6661

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

HG1 (3) Land at Hayes Lane Land Contamination: Given previous land use at site, a Preliminary Risk Assessment
would be required at planning application stage to determine risk of land contamination.

Testun llawn:

Thank you for consulting Natural Resources Wales (NRW) on the Vale of Glamorgan Replacement Local Development Plan (RLDP) Deposit Plan, which we received on 28 January 2026.
We have reviewed the deposit plan and published documents and have recommendations on matters relating to coherence and consistency. We advise these are addressed prior to submission of the RLDP.
1. Summary
We welcome that the Vale of Glamorgan Council has declared a ‘nature emergency’ and in 2021 committed to a target of no net loss of biodiversity in the Vale of Glamorgan. The deposit plan takes this a step further through its vision, objectives and policies in seeking
the achievement of net biodiversity benefit. We also welcome the recognition within the deposit plan and supporting documents that additional growth within the Vale has the potential to lead to negative effects on nationally and locally designated biodiversity. We
appreciate that the deposit plan’s policies seek to mitigate against these potential adverse effects with detailed wording and requirements.
However, we consider that the deposit plan would benefit from more specific mention of designated conservation sites especially where these are related to specific allocations and their associated policies. We note this issue was raised within the Integrated Sustainability Assessment (ISA) (see Section 2 below) however we do not see this recommendation properly reflected within the deposit plan itself. We consider this is a gap that should be addressed to ensure clarity within the policy requirements for any future planning applications.
General Approach to Designated Sites
In line with our role in development planning and our consultation remit, we advise that where new development may occur within or be likely to affect statutory designated sites including Special Areas of Conservation (SAC), Special Protection Areas (SPA), Sites of Special Scientific Interest (SSSI), National Nature Reserves (NNR) and Marine Conservation Zones (MCZ) this could be more clearly identified as a key consideration especially with respect to site allocations (housing and employment). We consider that the issue of avoiding or mitigating potential impacts and utilising opportunities for supporting and enhancing these sites (as noted by para 6.401 of the deposit plan) could have more substantial recognition across the deposit plan and its supporting documents. This would improve the clarity of approach.
We have furthermore noted that Policy SP20 (Biodiversity and Ecosystem Resilience) currently excludes specific mention of designated sites (although it does refer to protected species and habitats) and we suggest that this is addressed – our comments on SP20 are set out in Section 3 of this letter.
By across the plan, we mean there is scope to include mention of relevant statutorily designated sites within the constraints text for the sites listed in Appendix B of document BP44 Infrastructure Delivery Plan (perhaps summarising in line with the approach taken to the Historic Environment Record) and within document BP32A Green Infrastructure Assessment of Key Sites, evidence which can then be reflected as appropriate in Key Sites Policies (HG1 KS1 to KS5) to inform their master planning. The Preliminary Ecological Appraisals already undertaken for Key Sites (Key Site Supporting Information) would appear to hold relevant information in this respect.
We note that document BP32A has a useful general paragraph on biodiversity assets at paras 3.7-3.8 linked to the evidence collated in the Green Infrastructure Assessment (GIA). In short, where designated sites are identified in proximity to allocated sites it would be
helpful to make clear reference to them in a consistent manner. This would bring the deposit plan more fully into alignment with the ISA findings. For any employment sites
within proximity of designated sites, we consider that the employment background paper BP12A could potentially be updated to similar effect.
With reference to omissions on this matter, we refer you to our comments on sites set out in Section 4 of this letter, including sites KS1, HG1 (1), SP14 1. and SP14 4.
Overall, we consider that the recognition of designated sites appears somewhat inconsistent in the deposit plan, although we recognise that much of this is done by the
Green Infrastructure Strategy (GIS) which incorporates the GIA.
It may be that Policy SP20 (please see our suggested amendments in Section 3 of this letter) together with addressing the meaning of “areas of high ecological value” will also go some way towards resolving the points we raise.
Master Planning
We welcome the illustrative master plans included in the deposit plan but would caveat that at the detailed stages schemes must be able to adapt, where necessary, to site
specific environmental constraints (including protected sites, species and habitats), for example in response to updated ecological appraisals or detailed species surveys.
Designs need to be flexible enough to ensure compliance with the stepwise approach (avoid, minimise, mitigate) in achieving Net Biodiversity Benefit (NBB) and improving the resilience of ecosystems as required by Planning Policy Wales, edition 12 (PPW12) and Policy 9 of Future Wales, the National Plan. We note the plan has good reference to this within Policy SP20 and supporting paragraph 6.405, thus enabling thorough consideration
at the project/planning application level and in master planning.
Please see our detailed site-specific comments in Section 4 in order to consider where our comments may lead to adjustments in master plans. For example, the species protection issues we highlight with regard to KS3 at Readers Way, Rhoose.
Strategic Opportunity at Bro Tathan
In addition to the above points, we advise that the Bro Tathan area of the Vale includes a number of different allocations and is already known as an important ecological area for great crested newts (GCN) and dormice, in particular. Given the commitments already
made under previous planning applications at the site and the necessary requirement for future biodiversity provisions, we advise a more strategic overview of the area should be considered and either set out within the deposit plan or secured within an updated GIS.
This will ensure that development in the area:
• does not cause detriment to the maintenance of the favourable conservation status of protected species;
• results in green spaces and infrastructure that is meaningfully spatially connected and sufficient in size.
Overall, we consider piecemeal development of the St Athan area will not lead to effective conservation delivery and will make the planning process less efficient at project level.
Areas of High Ecological Value
As previously noted within our preferred strategy response (Ref: CAS-244275-Q4F4, dated: 14th February 2024), the deposit plan continues to make reference to avoiding
areas of ‘High Ecological Value’ (criterion 1 of SP20). We have not been able to establish where these areas are or how their ecological value is being determined. We consider this issue needs to be clarified and ideally a definition provided.
2. Integrated Sustainability Assessment (ISA)
With regards to Section 9.9 of the ISA, we agree that additional growth in the Vale has the potential to lead to negative effects on nationally and locally designated biodiversity. The ISA concludes that the housing-specific policies set out within the deposit plan work well to
mitigate the potential adverse effects, through design stipulations and policy inclusions.
The ISA then goes on to recommend that Key Site policies are updated, where appropriate, to reference specific designated sites which they are in proximity to, in
order to help establish appropriate protection and/or enhancement measures.
We agree with these recommendations and would go further in advising that all allocations and their associated policies should reference specific designated sites relevant to that site. For instance, we would advise Barry Woodlands SSSI and Walters Farm SSSI is identified in relation to Key Site 1 – Land at North West of Barry, and Barry Woodlands SSSI should also be identified for Housing Allocation HG1 (1) Land to the West of
Pencoedtre Lane. Please refer to our site-specific comments in Section 4 below.

3. Plan and Policy Wording
Strategic Policies
Strategic Policy SP19 – Green Infrastructure
We welcome that the GIS and GIA has informed the master planning of the Key Site allocations (6.395). To ensure this approach is carried forward for other development proposals, we consider there should be a stronger “policy hook” within Policy SP19 to link the content and evidence of the GI work to the policy and its influence on decision-making. Without this we consider there may be a risk of a policy gap/mismatch when determining planning applications.
This could be resolved by a new criterion such as:
“the provision of green infrastructure must have regard to any adopted or emerging guidance including the Green Infrastructure Strategy/Green Infrastructure Assessment
(and the Assets listed therein), and Green Infrastructure (Action) Plan for the Vale.”
To strengthen Policy SP19 we also recommend an addition to the wording of criterion 2 to read:
“Protect and enhance connectivity between existing green infrastructure assets and be planned wherever possible to positively support areas of high ecological value”.
We furthermore note that criterion 3 of SP19 refers to achieving net benefit for biodiversity whilst the policy overall seeks to provide, protect and enhance high quality multi-functional green infrastructure. We have previously commented that multi-functional green spaces may not always be compatible with biodiversity. It should be recognised that multifunctional uses of space can be to the detriment of the natural environment and so must be carefully considered. We recommend that paragraph 6.397 wording is updated to reflect this potential conflict so that NBB required by PPW (and as promoted by para 6.396 together with Policy SP20) is able to be prioritised and not compromised.
This point could also be raised under Policy SP4 Placemaking – at para 6.32. It should not be assumed that multifunctional spaces will also be delivering for nature in every situation and in some cases separate provision of spaces to meet biodiversity goals will be essential.
Paragraph 6.401 is welcomed regarding the opportunities that exist for the protection, maintenance and further enhancement of green infrastructure assets.
Strategic Policy 20 (SP20) – Biodiversity and Ecosystem Resilience
We welcome the inclusion of SP20 which recognises the importance of natural assets and aims to protect these. We have made comments regarding the term “high ecological value” in our Summary section at the start of this letter.
We also note that whilst reference is made to sites and areas of European, national and local importance (para. 6.402), this is not distinctly carried through within SP20 or within a specific detailed policy in the deposit plan. We advise that a more detailed policy for the Natural Environment (similar to DNP4 for the Historic Environment) could be included within the deposit plan and this should include reference to the protection of statutorily designated sites. Alternatively, SP20 itself could be updated to include reference to these in a similar manner to the approach taken to non-statutory designated sites provided by criterion 5 of SP20. We consider this would strengthen the deposit plan’s alignment to
section 6.4.3 of PPW12. This issue is also reflected in our feedback to the ISA as set out in Section 2.
By adding a detailed policy for the wider protection of the natural environment, there is scope to ensure a clearer message within the deposit plan regarding the need for natural resources (including land, air, water and soils) in the Vale to be protected for themselves and the essential ecosystem services they deliver. This is opposed to merely preventing pollution (deposit plan Policy DNP5). Taking such an approach would enable an
opportunity to add the consideration of Sustainable Management of Natural Resources (SMNR) into the plan policy framework rather than confining this to the deposit plan context (para 2.11) and the policy context of the GIS (page 53).
We note that Policy CC4: Renewable, Low and Zero Carbon Energy Generation is more distinct in seeking to safeguard a range of assets (including nature conservation interests and soil conservation interests) and we consider a similar policy approach may be useful
for all development proposals. We also suggest that the placemaking strategic policy (Policy SP4) could be altered in order to highlight the Natural Environment alongside its
current reference to the Historic Environment. We note that placemaking principles (Figure 11 - Identity) includes the need for development to respond to natural physical attributes of the site. This is an issue is linked to our site-specific comments (Section 4 below) where we cite, for example, the need to buffer woodlands, hedgerows and watercourses and preserve linear corridors.
Ensuring an SMNR approach will impact positively on the ground to safeguard and improve ecological networks and protect and enhance ecosystems, essential to meeting
the nature emergency. Topics we draw your attention to include river restoration where, in particular, the removal/remediation of physical modifications can make a significant impact upon water quality. The GIS provides scope to capture various projects and wider initiatives, including those based on catchment scale improvements and we welcome the opportunity to be continually involved in this work. We note and welcome the recognition of
nature-based solutions within Policies SP16, SP19 and SP20 and in detailed Policy CC6.
With regards to natural assets and water resources, we consider that specific reference to water quality is lacking within the strategic and/or detailed policies. Whilst we note that water quality is mentioned within criterion 9 of Policy SP16, we consider the deposit plan should include more direct reference to the Water Framework Directive. We consider there is an opportunity for SP20 to be updated to ensure developments protect water quality and quantity. Alternatively, as mentioned above, this could fit within a detailed policy for the protection of the natural environment.
As a minor point, please note that the South Central Area Statement is not hyphenated (para 2.10 and 2.11). Please note also that, referring to paragraph 6.404 and 6.405, the
requirements for developments to demonstrate NBB is based on PPW12, rather than The Environment (Wales) Act 2016.

Detailed Policies

Infrastructure
Whilst we note that the infrastructure requirements (such as sewerage capacity) have been investigated for certain key sites within the deposit plan, we consider there could be scope for a detailed policy to cover infrastructure requirements for all development.

Policy DNP7
We welcome Policy DNP7 of the deposit plan, which recognises the importance of preserving the natural darkness of the night sky and minimising light pollution, which we consider to be important in limiting adverse impacts upon local biodiversity and ecological
connectivity.

Policy DPN8
Please refer to comments made with regards to this policy under Section 6: Habitats Regulation Assessment (HRA).

Policy HG5 - Affordable Housing Exception Sites
We advise that, particularly given these sites are permissible outside of settlements and could be in countryside locations, criterion 6 should be amended to:
“There is no loss of land with significant recreational, amenity, agricultural, ecological or natural heritage value”.

EMP1 – Employment Regeneration Opportunity Areas
We note that the Former Aberthaw Power Station has been identified as an employment regeneration opportunity area. There are otter and water vole records on the site and we are aware of GCN records within the local area. We would advise against the inclusion of
the Aberthaw Nature Reserve within the allocation and advise that any application on the site would need to be supported by up-to-date ecological survey information and
appropriate conservation measures. Given the nature of the site, future applications will also need to be supported by appropriate land contamination investigations.

CC3 – Renewable Energy Local Search Areas
This policy identifies several sites where the potential for wind and solar development are the greatest (known as ‘search areas’). There are significant search areas located between Llantrithyd and St Hilary; no ecological information has been provided for these search areas, however given the records for GCN, water vole and otter local to these areas, it is likely that provision in the form of suitable habitats will need to be made for these species.
This could be substantial in scale, however without further ecological information we cannot advise further at this time. Notwithstanding, given the scale of the search area in this location and the likely ecological impacts, we advise that this area would benefit from spatial planning of biodiversity provision, at a greater than individual site scale.

Paragraph 2.81 – The Vale Nature Recovery Action Plan
We note reference to ‘6 broad habitat types’ including Woodland, Freshwater, Grassland, Coastal, Agriculture and Urban. We suggest this is amended to ‘6 broad ecosystems’ to reflect correct terminology and the State of Natural Resources Report 2025.

4. Strategic Sites
Overview
We previously provided detailed comments on the RLDP’s Strategic Sites, as set out in our response ref: CAS-234819-C1V3, dated 4th October 2023, which we refer you to. We welcome the additional information provided and note the inclusion of Green Infrastructure
Strategies for each of the Key Sites. However, we note that these do not include reference to protected species specifically and as a result we are unable to confirm that the provision for each site is appropriate. We observe that the road infrastructure for many of these sites severs woodlands and other substantial linear corridors. We advise that such sites are designed to minimise fragmentation in the landscape and advise that the road layouts and consequent severance is re-visited.

KS4 and KS5 are located within the vicinity of St Athan. This area is important for (and we are aware of) multiple records of GCN and dormice. Some of the area is already secured as compensation for impacts on these species associated with previous developments. We advise that the wider St Athan area is subject to spatial planning of biodiversity provision at a greater than individual site scale (as we have referenced in the Section 1 of this letter), in order to determine that:
• It does not cause detriment to the maintenance of the favourable conservation status of both GCN and dormice (strategic conservation plans should be established for both species);
• To ensure that green spaces and infrastructure are meaningfully spatially connected and sufficient in size;
We consider piecemeal development of these areas will not lead to effective conservation delivery and will cause the delivery of these sites to be less effective during the planning process.

Spatial Planning of Biodiversity
A masterplan or spatial biodiversity or GI plan should demonstrate the retention, provision and enhancement of essential areas for protected species. It should ensure that individual site-based habitat provisions are not designed in isolation but considered in association with nearby sites to demonstrate how habitat connectivity and resilience will be provided both across the site and to the wider landscape. Note that functional separation of public
open space and areas for biodiversity compensation may be required. Suitable buffers will need to be applied to any woodland and retained or created habitats on site. A sensitive lighting strategy will also likely be required for these sites. This point was raised previously during our review of the strategic candidate sites (ref: CAS-234819-C1V3, dated 4th October 2023).

Updated Surveys and Appropriate Buffer Zones
Further to the above comments, we welcome reference within the Infrastructure Delivery Plan for the requirement for updated ecological surveys and appropriate buffer zones to watercourses and retained habitat features for KS1 and KS2. Given the various ecological
constraints for each key site, we consider this advice should be included for each of the key sites.

Site Specific Comments
KS1 – Land at North West Barry
Protected Species – Dormice and bats are present on site. We advise that the masterplan is informed by surveys to ensure that biodiversity interests are maintained and enhanced. The site may require some areas to be retained an/or provision for habitats to support them. Dark areas and/or bespoke lighting scheme may also be required at project stage.
Protected Sites – The site is located in close proximity to Walters Farm and Barry Woodlands SSSI. As raised in our previous responses (CAS-234819-C1V3, dated: 4th
October 2023 and CAS-276923-N7H6, dated 17th April 2025), we have some concerns with the potential for increased and inappropriate use of the protected sites through recreational activities. We welcome that requirements have been detailed within HG1 KS1
under Green Infrastructure, Recreation Spaces and Biodiversity, which includes reference to emerging guidance for Suitable Alternate Natural Greenspace (SANG).

KS2 – North of Dinas Powys, off Cardiff Road
Protected Species – We note the supporting Preliminary Ecological Appraisal (PEA) (13th September 2022) which identifies potential for this site to support GCN, dormouse and bats. In the absence of species specific surveys, we are unable to advise whether the housing number aspirations for the site are realistic. We advise the scheme is designed to minimise severance of ecological corridors.

KS3 – Land at Readers Way
Protected Species – GCN are known to be present on this site (Readers Way Pond). The current masterplan indicates that the pond will be surrounded by built development and therefore built upon much of the terrestrial habitat which supports this pond. It is essential
that the masterplan provides a wide corridor from this pond to the wider countryside, other than via the closely managed grassland at Cardiff Airport. Any masterplan should make provision for this and any loss of habitat should be compensated for.

KS4 – Land at Church Farm
Protected Species - There are records of dormouse and GCN in the wider area. However, the supporting PEA indicates no direct impacts on the latter of the species. There appears to be extensive green space proposed in the illustrative masterplan, which we support.

KS5 – Land to the West of St Athan
Protected Species - The St Athan area is important area for GCN and dormouse. We would generally concur with the lower risk assessed for these species in association with this site. However, this is a substantial site and this and other sites in the St Athan area would benefit from spatial planning of biodiversity provision at a greater scale as reaffirmed elsewhere in this response.

5. Housing And Employment Allocations
Housing Allocations

HG1 (1) Land to the West of Pencoedtre Lane
Protected Sites: The site is within close proximity (200m) to Barry Woodlands Site of Special Scientific Interest (SSSI) and there is a risk from increased recreational use as a result of residential development, which could lead to impacts on the SSSI. Green space design must consider any emerging guidance for SANG to reduce recreational pressure on adjacent sites of biodiversity importance.
HG1 (2) Land at the Mole
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary European Marine Site (EMS). A HRA at project level will therefore be required.

HG1 (3) Land at Hayes Lane
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.

HG1 (4) Land at Neptune Road
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.

HG1 (5) Land between the Northern Access Road and Eglwys Brewis Road (Site C - Central Parcel)
Flood Risk: The site is located partially within Flood Zone 2 and 3 for Rivers, with the southern area of the site located within Flood Zone 3. We refer you to Sections 10.20 and 10.21 of TAN 15, which state that highly vulnerable development in Zone 3 should be avoided. Notwithstanding, we acknowledge that at masterplanning stage, there is scope to locate residential development away from areas of flood risk. We also welcome that
Appendix B of your Infrastructure Delivery Plan notes the requirement for an FCA at project level for this site.
Watercourse: Boverton Brook (Main River) runs through the site and any development will need to ensure no adverse impacts to the watercourse with appropriate buffers and design considerations.

HG1 (6) Land adjoining St Athan Road
Land Contamination: The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.

Rural Affordable Housing Led Sites
HG4 (1) Land to the East of Colwinston
Land Contamination: The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.

Major Employment Allocations
SP14 (1) Land east of Cardiff Airport, Rhoose
Protected Species and Protected Sites: The site is within close proximity (360m) of Barry Woodlands SSSI and there also appears to be significant potential for the site to support dormouse, GCN, otter and water vole. There are large areas of semi-natural habitats associated with this site including woodland, mature hedgerow and watercourses. These should be retained and significantly buffered from development. Connectivity between the
site and the wider environment should also be maintained. It is therefore currently not possible to advise whether the full aspirations of the site could be fulfilled.
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.

SP14 (2) Land south of Port Road (Model Farm), Rhoose
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.

SP14 (3) Bro Tathan Aerospace and Business Park
Protected Species: The site is located within an important area for GCN and dormice. As mentioned, this area would benefit from spatial planning of biodiversity provision at a
greater scale to better inform allocation.
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.

SP14 (4) Land to the South of Junction 34 of the M4, Hensol
Protected Sites: The site is located directly adjacent to Ely Valley SSSI. Given the biodiversity interest at the site, previous applications at the site include planning
commitments to conserve and enhance grasslands habitats on the site. These commitments have not yet materialised and the requirement for these provisions should be noted within the LDP.
Flood Risk: The site is located partially within Flood Zone 3 for Sea. We advise that an FCA will be required at project level to determine any flood risk implications at the site.

Local Employment Allocations
SP14 (5) Atlantic Trading Estate, Barry
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.

SP14 (6) Windmill Park, Hayes Road, Barry
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Flood Risk: The site is located partially within Flood Zone 3 for Sea. We advise that an FCA will be required at project level to determine any flood risk implications at the site.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.

SP14 (7) Vale Business Park, Llandow
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.

SP14 (8) Land at Llandow Trading Estate
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.

6. Habitats Regulations Assessment (HRA)
Marine and Coastal Physical Processes
Coastal Squeeze
We note that coastal squeeze has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is that it “is unlikely that the Vale of Glamorgan RLDP will allocate many developments on
greenfield sites adjoining the estuary”.
We also note that Policy CC6 specifically relates to Coastal Defences and Shoreline Management, with reference to the Shoreline Management Plans. We recommend the use of NRW’s Assessment of Coastal Squeeze at the project level for anyone proposing to
undertake works to coastal structures.

Loss of Functionally Linked Habitat
As part of the Preferred Strategy consultation, we advised that consideration was given to potential impacts on migratory fish features of the Severn Estuary EMS. In particular, we referenced the River Ely and its tributaries providing supporting habitat for essential life cycle processes of some or all the diadromous fish species.
Within the deposit plan HRA, it is noted that likely significant effects to the migratory fish features of the Severn Estuary EMS has been ruled out, as none of the sites allocated in the RLDP lie in close proximity to the River Ely and connected watercourses. We therefore
agree with this conclusion.
In relation to bird features, Table 8 of the Appropriate Assessment identifies many key sites and allocations with high to medium potential for functional linkage to the Severn Estuary EMS. We note that loss of functionally linked habitat has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational
Pressure’ within the deposit plan.

Policy DNP8
We advise that clarification is needed in relation to this policy, as while we welcome the supporting text regarding functionally linked land outlined in paragraph 6.76 of the HRA, the policy is mainly focused on recreational pressure and is titled as such. We also note a discrepancy between the policy wording in paragraph 6.76 and Policy DNP8 in the deposit plan itself.

Visual and Noise Disturbance (During Construction)
Within the deposit plan HRA, visual and noise disturbance has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is through the inclusion of recommendations outlined in 6.83 of the HRA to the supporting text of Policy SP20, which we welcome.
We also welcome the recommendation in relation to potential functionally linked land as outlined in paragraph 6.84 of the HRA.

Recreational Pressure
Within the deposit plan HRA, recreational pressure has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. Again, the justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational Pressure’ within the deposit plan, which as above, we advise needs
clarification.
We note that no visitor data has been collected from access points within the Vale of Glamorgan, but we welcome reference to the visitor surveys undertaken by
Monmouthshire and Torfaen, as well as the 2022 visitor survey commissioned by Stroud District Council.
We note that paragraph 6.25 of the HRA states that “three Key Sites and several other housing allocations lie within the 12.6km core recreational catchment that has been
deemed most appropriate for the Severn Estuary SAC/SPA/Ramsar”. However, we also note that Table 6 in the HRA only includes two Key Sites requiring mitigation, with KS3 being omitted. We advise that clarification is needed at the project level as to whether developments are situated within the 12.6km catchment area.

7. Strategic Flood Consequence Assessment (SFCA)
We have reviewed the submitted SFCA and agree with the scope of the assessment made.
We note there is currently an upper catchment Natural Flood Management (NFM) / Nature Based Solutions (NbS) project on the Cadoxton to reduce flood risk to Dinas Powys, Any updated SCFA should have regard to NFM schemes being progressed in their area and
proposals should be clearly outlined in the Development Plan (in accordance with TAN 15 2025).

8. Green Infrastructure Strategy (GIS)
We understand that the published GIS has not been updated to reflect the latest stage of the deposit plan and refers only to the preferred strategy stage (para 2.2.3). We previously provided advice on the Green Infrastructure Assessment (GIA) (re: CAS-252087-F0H1, dated 14th May 2024) which is included within the GIS. We refer you to these comments, noting that the GIS will be kept under continual review (para 1.2.5).

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6779

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Boyer Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Persimmon Homes question to suitability of allocating residential development on the site known as Land at Hayes Lane, The Bendricks. These concerns are centred on the following:
Unsustainable Location & Poor Connectivity - Whilst the site is technically identified within the settlement boundary, it is clearly not a sustainable location for residential development. This is evident by virtue of the fact that Land at Hayes Lane is situated within an existing industrial estate and lacks any supporting facilities.

Given the nature of the area there are almost no existing active travel routes and access to modes of public transport are extremely limited. Most notably that includes railway stations with the nearest being Cadoxton Station which is located circa 3.8km north of the site.

Loss of allocated employment land - the site remains allocated in the adopted LDP for B1/B8 employment uses. These intended to facilitate small industrial and workshop units as part of the Atlantic Trading Estate’s expansion and in turn support opportunities for local businesses/ enterprise ventures. The council’s latest Employment Land Review confirms a clear demand for such uses in Barry, with Land at Hayes Lane representing the most logical location for further growth. Although the RLDP’s evidence base suggests there are other development opportunities within the region that could compensate for the proposed loss of employment land. Upon further review it is apparent these are in less favourable locations from both a strategic and operational standpoint.

Testun llawn:

This submission relates to the site known as ‘Land North of Dinas Powys’ and builds upon previous responses provided in respect of the Call for Sites exercise in September 2022 and more recently Preferred Strategy in February 2024.
For context the site is identified as part of Candidate Site Ref. No 444 within the latest Candidate Sites Assessment (Background Paper – BP18A) which has been published as part of the supporting evidence base.
As you are aware to date Persimmon have presented, what is in effect, two options for the development of the site with a Smaller Option (extending c13ha) and an Extended Scheme (extending to c31ha). Whilst there are significant benefits of both schemes this representation will focus on the smaller option which has been identified as a proposed site allocation for residential development within the Deposit under Policy HG1 – KS2 ‘Land North of Dinas Powys’.
Having reviewed the Deposit Plan it is evident that the document is structured around a number of key themes/ sections. For convenience this submission discusses each of which in chronological order and should be considered in conjunction with the accompanying technical reports/ plans provided to date.
The overarching purpose of which shall be to respond to the relevant draft Replacement Local Development Plan policies, with particular consideration given to the Welsh Government’s tests of soundness as set out within the Development Plan Manual for Wales (Third Edition) March 2020)):
• Test 1 – Does the Plan Fit?
• Test 2 – Is the Plan Appropriate?
• Test 3 – Will the Plan Deliver?

Section 3: Key Characteristics
Settlement Pattern
In principle, Persimmon support the Settlement Pattern as set out in Section 3 and in particularly the identification of Dinas Powys as a Primary Settlement.
Paragraph 3.9 explains that primary settlements “offer several key services and facilities, which are vital to their role as sustainable communities, as they reduce the need to travel to Barry or the Service Centre Settlements to address day-to-day needs”.
The importance of the Primary Settlements in supporting the Service Centre Settlements is noted, however Persimmon consider that Dinas Powys, in particular, is capable of a higher role/ function and thus accommodate even further levels of growth. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
Housing Market and Housing Need
In light of the Vale of Glamorgan’s strategic location in-between Cardiff and Bridgend, and the significant employment opportunities associated with these areas, the Deposit RLDP should seek to maximise housing provision to ensure a more sustainable balance is achieved between homes and jobs, and in turn reduce commuting distances/ carbon emissions.
Paragraph 3.18 clearly acknowledges the scale of affordable housing need, identifying a requirement for 1,075 affordable homes per annum between 2023–2028 and 154 per annum thereafter. Yet it remains unclear whether existing unmet need has been fully factored into the overall housing requirement presented within the Deposit RLDP. This is particularly importance in the context of the Welsh Government’s 2025-based estimates which identify 9,400 units of unmet need at a national level and a requirement for 8,700 additional homes per annum over the next five years simply to address newly arising need.
Accordingly, there is a compelling justification for a further uplift in housing numbers to ensure the Plan proactively addresses both existing and emerging need. Increasing the overall housing requirement would directly enhance the overall delivery rate for affordable homes which is crucial in a local authority area with the highest affordability ratio in Wales. Paragraph 3.17 confirms that in the Vale average house prices are 9.7 times average workplace earnings compared to the Wales average of 6.1, therefore a step change in housing targets is needed to support a more balanced housing market across the region.
Section 4: Key Themes, Vision & Objectives
Key Themes
Persimmon supports the theme ‘Homes for all’ and the need for the housing supply to respond to the growing population and provided in appropriate locations, with a mix of tenure and types. In that respect site Land north of Dinas Powys provides an opportunity to ensure future residential development aligns with such objectives to deliver high quality housing development in a sustainable location, whilst also facilitating additional services and facilities as part of the proposed offer.
In principle, Persimmon support the ‘Placemaking’ theme and consider that the proposed allocation in Dinas Powys shall ensure a strong sense of identity is achieved.
Persimmon also support the theme of ‘Promoting active travel and sustainable transport choices’, and highlight that the proposed residential development at Dinas Powys clearly further assists in ensuring that the new development be in a highly sustainable location with very good access to alternative transport, other than the private car.
Vision
In general, Persimmon support the RLDP Vision, however highlight that whilst Barry and other Sustainable Service Centres are identified as playing a vital role in delivering the strategy, the importance of the ability for Primary Settlements to deliver sustainable and high-quality residential development also needs to be suitably recognised.
The site Land north of Dinas Powys clearly aligns with the Council’s ambition to ensure future growth delivers homes which caters for all (including affordable homes) and are prioritised in areas of greatest demand. Whilst simultaneously facilitating much needed additional infrastructure improvements to further enhance Dinas Powys’ role as a Primary Settlement thereby supporting both existing and future residents.
In light of the above it is considered that Dinas Powys plays a significant part in delivering the Council’s strategy and the role, function, and ability of this settlement to accommodate growth needs to be significantly reinforced. The settlement is capable of accommodating more growth in a highly sustainable location we believe warrants greater recognition within the vision itself.
Strategic Objectives
Objective 3 – Home for All
Persimmon supports the principle of Objective 3, in particular the provision of high quality housing which includes the right mix, tenure and type. Persimmon supports the notion of providing residential development in places which people want to live, and in particular Dinas Powys as a Primary Settlement.
Objective 4 – Placemaking
As above, in principle Persimmon support the Council’s placemaking objectives which seeks to ensure all development will contribute positively toward creating a sense of place. Most notably this involves prioritising future growth in sustainable locations which are placed to create attractive, safe and accessible schemes that are equally effective from a functional standpoint.
Our site in Danis Powys aligns with such principles whilst also providing an opportunity to facilitate a logical extension to the existing urban form and in doing so meet local need in a sustainable matter. The scope of which includes full market and affordable housing in accordance with proposed policy requirements along with ample public open space, active travel links via dedicated pedestrian footpaths and cycleways and SuDS features.
Objective 8 – Promoting Active and Sustainable Travel Choices
Persimmon supports the principle of promoting active and sustainable travel choices and highlight that their residential development at Dinas Powys has been designed to ensure accessibility it’s at the heart of the scheme with regards to walking, cycling and connectivity to public transport.
Moreover, the proposed allocation would also facilitate both on-site and off-site infrastructure improvements further enhancing the existing excellent accessibility to Eastbrook Station. Therefore, providing an opportunity to encourage a modal shift towards more active forms of travel and consequently reducing dependency on private vehicle and associated carbon emissions. From a plan-making standpoint the proposed allocation at Land north of Dinas Powys (HG1 KS2) is therefore crucial to ensure growth is prioritised in such a highly sustainable location and maximise opportunities for greater connectivity at both a regional and local level.
Section 5: Sustainable Growth Strategy
RLDP Sustainable Growth Strategy comprises six key elements as follows:
1. Delivering a sustainable level of housing and employment growth supported by appropriate infrastructure that accords with the Vale’s position within the Cardiff Capital Region (CCR).
In order to meet the overarching Vision, the Vale have identified a need to deliver at least 8,679 new dwellings over the proposed plan period which responds to the identified housing requirement of 7,890 homes (526 per annum) and incorporates a 10% flexible allowance. Persimmon support the proposed approach, however maintain it should be considered a minimum figure with aspirations to achieve greater levels of growth in sustainable locations across the district.
Whilst we appreciate these figures are based on average completion rates over the first ten years of the adopted Local Development Plan. It is important to recognise that a higher rate of housing delivery is demonstrably achievable. Annual completion rates peaked at 917 dwellings, with six of the ten monitoring years exceeding the 526 per annum figure currently relied upon. This demonstrates that delivery capacity within the Vale has historically operated well above the proposed requirement and should therefore provide confidence that a higher housing target could realistically be achieved over the emerging plan period.
Furthermore, the Council’s own evidence base (BP7 - Housing and Employment Growth Options) identifies a five-year average build rate of 780 units per annum between 2016 and 2021. Again, this figure exceeds the annual delivery rate currently proposed within the emerging RLDP and reinforces the fact that the proposed housing requirement should not be unduly constrained by a lower long-term average.
Whilst Paragraph 5.8 explains that the proposed figures are based on a ten-year average delivery rate, it fails to acknowledge that this period included the Covid-19 pandemic and at a time where construction costs experienced significant inflation. These factors had a material impact on the housebuilding industry nationally and inevitably suppressed delivery rates during those years. From an objective perspective, basing the future housing requirement on an average that includes these exceptional circumstances risks skewing the figures and underestimates the district’s true delivery potential for the Vale.
In light of the above we believe a sensible response would be to incorporate a greater flexible allowance of 15% within the RLDP to demonstrate an appropriate level of growth will be achieved. Whilst also ensuring there is sufficient supply of sites to come forward early on during the plan period to proactively address housing need from the point of adoption up to 2036.
From a procedural standpoint it is also important to note that the currently adopted plan predates the publication of Future Wales: The National Plan 2040 and the Vale’s position within a national growth area. As such, pursuing an approach which seeks to maintain historic delivery rates is not considered to reflect this enhanced role and arguably lacks the level ambition set out at a national level. The proposed housing requirement should therefore be uplifted to positively respond to such matters in order to ensure conformity with Future Wales and regional aspirations.
Increasing the overall housing target would also act as a catalyst to enhance the delivery of affordable housing which is identified as a key objective for the RLDP. Each proposed site allocation is subject to a policy-compliant percentage contribution, therefore a higher level of market housing would proportionately generate a greater number of affordable homes to meet local need across the region.
As evidence above, the proposed allocation Site Ref HG1 KS2 – Land to the North of Dinas Powys, represents a suitable, available and deliverable location for residential development without any constraints preventing it from delivering units in the first five years of the emerging plan period.
Persimmon Homes remain fully committed to the development opportunities presented by the site and its progression as a proposed allocation within the RLDP. The latter is essential in assisting the Vale of Glamorgan meet local housing need which ultimately goes to the heart of the plan and ensuring it has been soundly prepared.

2. Aligning locations for new housing, employment, services and facilities to reduce the need to travel.
Persimmon supports the Vale’s objective to locate new major development in areas of the region best served by existing infrastructure and supporting services. The Settlement Appraisal Review (BP5) identifies Dinas Powys as the most sustainable primary settlement in the region with suitable local services to accommodate future growth which remains in keeping with the overall function of the existing settlement.
Whilst the settlements of Barry, Penarth, Llantwit Major and Cowbridge are deemed to score higher on certain criteria (as shown within the table below), it is clear Dinas Powys is considered to be the third most accessible settlement to modes of public transport which clearly aligns with the Council’s intension to pursue a transport orientated spatial strategy for future growth. On this basis it is evident that Dinas Powys is more sustainably located when compared to Cowbridge and Llantwit Major, and therefore warrants a higher ranking within the Settlement Appraisal Review and thus greater levels of growth within the RLDP.
Tables 1& 2. Extracts of Key Settlement, Service Centres & Primary Settlement Scores from Settlement Appraisal Review (BP5)
3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.
The Deposit RLDP explains that whilst reducing the need to travel is a key policy objective, it is recognised that there are journeys that will need to be made by other modes of transport, particularly due to the strong relationship with Cardiff as a designation for employment, retail and entertainment. As such the proposed growth strategy seeks to locate development in places that are inherently well served by sustainable transport in line with the Vale of Glamorgan’s transport hierarchy.
Persimmon supports these principles and recognises the importance of prioritising development in sustainable locations across the regions, particular those well connected to Cardiff city centre. Paragraph 5.18 of the Deposit Plan states that “Targeting new development to the settlements that are served by the rail network is a key part of the strategy, as it will facilitate journeys being made by means other than the car”. Persimmon wholly agree with this approach on the basis that this would enable the RLDP to achieve a more sustainable pattern of development and in doing so support growth over the emerging plan period.
In order to help identify suitable locations for future development Transport for Wales have produced isochrone maps which delineates different travels times for walking and cycling around each of the existing railway stations in the Vale. Most notably the site known as at ‘Land North of Dinas Powys’ is situated within 5-10 minutes walking / 0-5 minutes cycling distance to Eastbrook Station and 15-20 minutes walking/ 5-10 minutes cycling distance from the station at Dinas Powys. This evidence clearly demonstrates the proposed site represents one of the most sustainable locations for residential-led growth and thereby justified its position within the RLDP as a key allocation.
Land North of Dinas Powys further strengthens the spatial strategy by prioritising development at a location that is well served by existing rail stations. Focusing growth in settlements with established rail connectivity ensures that future residents have direct access to sustainable transport infrastructure from the outset. This approach supports a more sustainable pattern of development by reducing reliance on the private vehicle and encouraging a modal shift towards rail, alongside walking and cycling for local trips.
By directing development to locations well served by existing bus and rail infrastructure , the proposal would help reduce the need for commuting via private vehicles, particularly for journeys to key employment and service destinations. In doing so, it would make a positive contribution towards the Council’s climate change targets through the reduction of carbon emissions and promoting a modal shift within the local community.
Moreover, the proposed allocation HG1 KS2 presents a significant opportunity to support local facilities and facilitate green infrastructure provision within a highly accessible and sustainable location. The scope of which shall include ample public open space, dedicated active travel links via pedestrian footpaths and cycleways, Sustainable Drainage Systems (SuDS) features, and other associated infrastructure. Integrating these elements at the heart of the site shall enable residents to meet a greater proportion of their daily needs locally while benefiting from high-quality public transport connections.
In terms of the overall distribution of growth, Persimmon fully supports the proposed approach to prioritise development in sustainable locations near existing rail infrastructure as depicted by the strategic transport corridor within the RLDP Key Diagram (Figure 10). However, to optimise the effectiveness of this strategy it would be prudent to focus growth in areas of greatest demand.
Paragraph 3.14 of the Deposit Plan explains that a significant proportion of the population increase in the Vale over the past 10 years has been as a direct result of a people migrating from Cardiff to the Vale, with the Vale ultimately experiencing a net increase of an average of 716 people per year for the period 2011-2021. These principles should therefore be better reflected in the general pattern of development set out within the RLDP. This would be achieved by prioritising higher levels of growth in areas such as Dinas Powys, which is not only the nearest settlement geographically to Cardiff but also inherently well connected by the existing rail network and other modes of public transport.
Focussing further growth in well-connected, sustainable locations such Dinas Powys will therefore support the Council’s transport-led placemaking approach. These principles fully align with the Welsh Governments strategic objectives as set out within the Future Wales – the National Plan 2040, Planning Policy Wales Edition 12 and Llwybr Newydd: The Wales Transport Strategy, which in turn shall contribute towards achieving a more sustainable pattern of development within the RLDP.

Figure 1. Extract of Key Diagram/ Strategic Growth Area from Deposit Plan
Section 6: Policy Framework
This section identifies the strategic policies, criteria-based development management policies, site specific allocations and designated areas to be protected. These are broadly arranged by topic theme under the key policy headings set out in PPW which are reflected below.
Strategic and Spatial Choices (Placemaking)
Policy SP1 – Sustainable Growth Strategy (& Policy SP6 – Housing Requirements)
This policy states that in order to deliver the Sustainable Growth Strategy for the VoG, the emerging RLDP will make provision for 7,890 dwellings and 5,338 jobs over the plan period. In order to achieve the former Policy SP6 explains that to meet the identified housing requirement of 7,890 dwellings, provision will be made for the delivery of 8,660 homes in the Plan Period 2021 to 2036 which incorporates a 10% flexible allowance. In turn this will be distributed as follows: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.

Whilst Persimmon supports the Council’s conclusion that in principle the ‘Medium’ growth option reflected in Policy SP1 generally accords with the Welsh Government’s aspirations for the Vale of Glamorgan within the Future Wales national growth area, which is identified as a focus for strategic economic and housing growth. Given the Vale forms part of the Cardiff Capital Region, it is equally important that the overall level of growth remains suitably ambitious to support the region’s economic aspirations and continues to complement Cardiff which remains the nearest neighbouring authority.
Although we understand the proposed approach uses the Dwelling-led 10 Year scenario, which is based on the average annual build rate for the first 10 years of the adopted plan and equates to a total of 7,890 new homes or 526 dwellings per annum over the emerging plan period. The overarching intention is to ensure the projected level of growth is deliverable whilst recognising the fact there is sufficient capacity within the Vale to support further growth towards the higher end of the ‘medium’ range.
As noted, Persimmon are wholly in support of Key Housing-Led Site Ref. KS2 - North Dinas Powys, off Cardiff Road, which seeks to actively contribute towards the housing requirement.
However, the Deposit Plan also needs to recognise that there exists an opportunity to further extend the allocation to provide a logical extension to the defined urban area of Dinas Powys and which will facilitate the delivery of much needed full market and affordable housing to help address the significant level of demand identified across the Vale.
This additional land is promoted in the context of the concerns raised regarding the current figure of 8,660 new dwellings which is underpinned by a 10% flexible allowance in relation to housing delivery. Persimmon consider it relevant to take account of recent evidence provided to other Local Planning Authorities in Wales which have either adopted or are in the latter stages of bringing forward a new Local Development Plan.
For example, in Bridgend the Council recently adopted their new Local Development Plan (covering the period 2018 to 2033) which is underpinned by a flexibility allowance of 14% equating to an additional 1,053 dwellings. This level of provision was required in order to demonstrate the Anticipated Annual Build Rate (AABR) were deliverable and ensure that the Plan remains effective in the event of changing circumstances. During the examination process the Inspector explained that an increase beyond the standard 10% was fundamental to enable the plan and its housing trajectory to be resilient and sufficiently adaptable. The overarching purpose of which is to account for any unforeseen changes and potential shortfalls/ delays to the strategic site allocations whilst still enabling the overall housing requirement to be delivered.
For Swansea, the Council published their LDP2 Pre-Deposit Plan (Preferred Strategy) for consultation last year. In terms of housing delivery this incorporates a 20% flexible allowance above the proposed housing requirement and is predicated on the basis of needing to account for certain sites not coming forward as anticipated and other unforeseen factors affecting delivery. Similar to the Vale, Swansea City Council’s latest Annual Monitoring Report (6th Edition) (October 2025) confirms that since adoption of the current LDP in February 2019 they have not met their annual housing target for any of the past six years. To date this has resulted in a shortfall of approximately 3,767 homes which is predominantly attributed to delays associated with larger strategic allocations. Therefore, in order to avoid having similar implications next time around the Council have uplifted the proposed flexible allowance within LDP2 and intend to incorporate a more diverse portfolio of sites going forward. The main purpose of which is to build in an additional margin of flexibility above the standard 10% threshold, and therefore enable other sites to come forward to account for potential slippage elsewhere to ensure the plan is effective in meeting local need.
More recently in Monmouthshire, the Council submitted their proposed RLDP to PEDW in November 2025. As part of which they have identified a requirement of 6,210 homes which incorporates a 15% flexible allowance. Similar to above an increase beyond the standard 10% threshold has been justified to account for potential shortfalls/ delays due to longer lead in times needed for strategic site allocations whilst proactively addressing any historic unmet need.
Whilst Persimmon appreciate that the Council intends to prioritise growth towards the higher end of the ‘medium’ range. Having reviewed the Deposit Plan evidence base we believe a minimum allowance of 15% would be more reflective of the Vale’s strategic position and would seek an additional 395 dwellings to the medium growth option equating to a total of 9,074 homes. The benefits of which are evident above and justification well-established from a plan-making perspective to ensure the RLDP is underpinned by a robust evidence base which incorporates a suitable level of flexibility to effectively meet local housing need from the outset.
In addition to the above the importance of increasing the RLDP’s housing target, by virtue of uplifting the proposed flexible allowance, has recently been highlighted by the findings of data published by the Welsh Government (WG). Most notably that includes the 2022-based Local authority household projections (Dated 20th November 2025) and 2025-based estimates of additional housing need (Dated 12th February 2026).
Upon publishing the former superseded the previous 2018-based demographic projections and provides updated figures from mid-2022 to mid-2032. The results show that whilst the overall number of households in Wales is projected to increase by around 98,500/ 7.2%, to a total of 1.46 million. The local authorities projected to see the largest percentage increases are the Vale of Glamorgan (up 11.7%) and Cardiff (up 11.1%).
In turn these trends are carried through into WG’s 2025-based estimates of additional housing need, which identifies an existing unmet need of 9,400 homes. This is supplemented by a requirement to deliver an average of 8,700 new homes annually over the next five years to account for newly arising need alone. The combination of which demonstrates that there is an urgent need to increase delivery rates on both a national and local level, and therefore it’s imperative that the latest position with regards to the need for affordable and full market homes are accurately reflected within the Council’s housing figures.
In terms of considering the level of housing provision for a plan, Paragraph 5.34 of the DPM is explicit in that the most up-to date suite of Welsh Government Population and Household Projections must form the foundation of any evidence base. LPAs are then required to use a household conversion factor when translating households to dwellings to establish overall need.
Once again, the DPM explains that failure to include a robust conversion rate from the outset is a high-risk strategy and may undermine the overall soundness of any emerging plan. To avoid such circumstances, we believe it’s essential the LMNA is updated to reflect the latest WG datasets, which in turn is likely to provide grounds to warrant extending the proposed 15% threshold further. Ultimately this approach intends to ensure the emerging RLDP more effectively meet local need over the entire plan period and thus soundly prepared.
Figure 2. Extract of the Welsh Government’s Calculation Method for Total Dwellings as per the Development Plan Manual
As mentioned above, Policy SP6 provides a high-level breakdown of how the Council’s housing growth is expected to be delivered over the plan period. For completeness this includes: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.
Whilst we do not dispute those relating to proposed site allocations and/ or windfall developments. The proportion of dwellings set to be accounted for within the Vale of Glamorgan’s existing landbank (3,837 units) is considered excessive given it represents 44.3% of the Council’s overall housing requirement.
Although Persimmon acknowledge that this is partly derived on the basis that emerging plan period has technically already commenced (2021 to 2036), and therefore is made up of sites at various different stages of planning process (i.e. either already built out, being constructed or secured consent - as shown below). It is important to recognise the potential implications this approach has in terms of stifling opportunities for growth, which is contrary to the Welsh Government’s aspirations for the Vale of Glamorgan as part of a National Growth Area within Future Wales: The National Plan 2040.

Table 3. Extract of the Vale of Glamorgan’s Housing Supply and Housing Requirement
From an objective standpoint this means there is only a need for 2,561 additional dwellings (3,520 dwellings minus 959 units rolled forward) to be delivered from new allocations over the emerging plan period. This reinforces the point that in reality the overall quantum of new homes will be significantly lower than the figure set out within the RLDP’s vision and strategic objectives. In turn this prevent opportunities for new sites to come forward as part of the plan-making process and in doing so hinder the Council’s ability to account for historic unmet need. Collectively this substantiates Persimmon’s position that in order for the plan to be considered sound the Council must accommodate a greater flexible allowance, optimising the use of sites such as Land north of Dinas Powys, to ensure the emerging local plan complies with the Welsh Government’s aspirations set out within Future Wales.
As illustrated above, the Council anticipate 1,303 dwellings coming forward in the form of windfall sites. This accounts for both small and large sites which in turn represents around 15% of the Council’s overall housing requirement. Once again, whilst we do not contest the overall windfall provision or the projected delivery rate of 87 dwellings per annum up to 2036. It is important to recognise that based on past trends the annual number of homes which comes forward on windfall sites varies significantly year on year.
Table 18 of the Development Plan Manual (DPM) is explicit in that respect and explains that although due regard must be attributed to analysis of past delivery rates, periods of abnormally high or low completions should be considered inappropriate/anomalies when extrapolating future rates of windfall sites. On that basis ensuring the RLDP incorporates a greater flexible allowance will not only provide certainty that any shortfalls/fallow periods are offset, but also enable a more consistent supply of homes to be achieved over the plan period as a whole.
Lastly, in terms of overall growth Paragraph 5.8 of the Deposit Plan states that the level of growth they have identified ‘’has been demonstrated to be deliverable and is sufficiently ambitious to reflect the Vale’s position in the Future Wales national growth area.’’ It also notes that this level of growth has been chosen so that it is ‘’complementary to, rather than competing with, the neighbouring authority of Cardiff and the wider Cardiff Capital Region (CCR).’’.
Whilst it is agreed that the level of growth may be realistic based on past trends, the claim that this is sufficiently ambitious and needs to be at this level to avoid competing with Cardiff is not substantiated by evidence to suggest that a higher level of growth could not also achieve these principles.
Cardiff, as the capital city of Wales, also demonstrated historic under delivery when publishing its deposit plan for consultation in February 2025, which was the case for allocated sites as well as generally for annual delivery rates over the adopted plan period. This resulted in a failure to meet targets over the last 10 years of their adopted plan. Whilst Cardiff has made progress in more recent years, the latest Annual Monitoring Report published in October 2025 notes that to date the region has met just 58% of its overall dwelling requirements over the plan period from 2006-2025.
Accordingly, with Cardiff opting to continue with a medium growth option for their RLDP despite these shortfalls, there is no sound basis to suggest that adopting a higher growth level within the VoG would detrimentally impact upon housing delivery or ‘compete’ with Cardiff.
In summary, Persimmon supports the overall medium growth strategy and key allocations such as North Dinas Powys. Although given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
These steps would help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Overall, we conclude that a higher flexibility allowance is necessary to the ensure the RLDP is able to effectively meet local need over the plan period. From a practical standpoint whilst further sites may well be required to accommodate the additional growth, it is important the current proposed allocations are safeguarded and therefore supplemented accordingly. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
Policy SP2 – Settlement Hierarchy
In principle, Persimmon supports the Settlement Pattern set out in Policy SP2, particularly the identification of Dinas Powys as a Primary Settlement.
Whilst the role of Primary Settlements is acknowledged, in that they contain several key services and facilities, vital to supporting sustainable communities including primary schools, small convenience shops, food and drink outlets and employment opportunities.
Persimmon considers that Dinas Powys is capable of fulfilling an enhanced role given its proximity to strategic transport infrastructure which provide regular services to key designations throughout the region and Cardiff city centre. Whilst the proposed allocation HG1 KS2 undoubtedly supports such principles, given the area is inherently well served by existing infrastructure we maintain that it has the capacity to accommodate even further levels of growth, which could be delivered through the extended Candidate Site (Ref. No. 444). This approach would align with the Council’s spatial strategy given that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally subject to greater physical and environmental constraints.
Policy SSC1 – Development within Settlement Boundaries
Persimmon Homes support the premise of Policy SSC1, and the objective of directing development to areas within defined settlement boundaries. This approach will help reinforce sustainable growth patterns and prioritise development in locations well served by both existing and planned infrastructure. Collectively these principles align with the Councils ambitions for Land north of Dinas Powys (HG1 KS2) and supporting local services and facilities to reduce overreliance on private vehicle travel.
Policy SP4 – Placemaking
In principle Persimmon Homes supports Policy SP4 and the aim of ensuring all new development is of high-quality sustainable design.
The proposed allocation Land north of Dinas Powys has been designed with landscape led approach and therefore clearly aligns with the placemaking principles set out in Policy SP4 and the sustainable placemaking framework of PPW12. The site’s location on the edge of Dinas Powys enables the scheme to positively responds to the character of the local area whilst remaining in keeping with the wider landscape setting. The layout reflects the prevailing scale and form of surrounding neighbourhoods, incorporating similar architectural cues and a coherent street hierarchy. Green infrastructure forms the structural framework of the masterplan, integrating retained landscape features, new planting, and sustainable drainage measures to ensure climate resilience and biodiversity enhancement. The density proposed makes efficient use of land in accordance with national policy while remaining sensitive to local character and the edge-of-settlement context.
In line with PPW12’s emphasis on health and well-being, the scheme promotes active travel that connects to existing pedestrian routes, public transport links and community facilities within Dinas Powys. The development prioritises walking and cycling, supports access to local schools, shops and services, and reduces reliance on the private car. Public open spaces have been prioritised towards the centre of the scheme and homes orientated accordingly to promote natural surveillance, thereby creating a safe area that encourage recreation, social interaction and community cohesion. The integrated green network delivers benefits such as improving general air quality and strengthening ecological connectivity within the Vale of Glamorgan.
The proposal also reflects the design principles set down within the Design Commission for Wales in respect of quality architectural design, contextual response and multifunctional spaces. This will be achieved through a balanced mix of housing types and tenures responds to local need. Careful consideration has also been given to the wider landscape setting of Dinas Powys, ensuring that key views, settlement edges and local character are respected and enhanced.
Policy PGD1 – Creating Well Designed and Inclusive Places
Persimmon question the need for both Policies SP4 and PGD1 as there is notable repetition between the two. In principle the criteria set out within the proposed policy aligns with our expectations, however there is a need to recognise that not all criteria will be able to be accommodated on development sites. Particularly given the need to accommodate other legislative requirements relating to environmental and economic matters that warrant equal consideration as part of the planning process.
On that basis if the Council are minded to continue with this particular policy’s inclusion, we request the proposed wording be updated to clarify that such the merit of such principles will be considered on a site-by-site basis rather than the current blanket approach suggested.
Policy PGD2 – Residential Development Densities
Residential densities are supported as a principle, however, should not be so prescriptive as to unnecessarily restrict development. Policy PGD2 outlines that residential development over 0.5ha will be permitted where the proposed density achieves a minimum of 35 dwellings per net hectare within Key, Service Centre and Primary Settlements and 30 dwellings per net hectare in Minor Rural Settlements.
From a planning standpoint, Persimmon support the Councils approach to prioritise higher density development in Key Settlements, Service Centres and Primary Settlements. These locations are naturally better connected to existing transport infrastructure, modes of public transport, Active Travel routes and local services/facilities to accommodate future growth.
A minor point in relation to the policy wording is the ‘dwellings per net hectare’ and the removal of non-developable space in any calculations. Whilst this is normal, the increased requirements relating to SAB, green infrastructure requirements and increased ecological mitigation all have a direct impact on the remaining available land and it is positive to see there is an allowance for some flexibility.
The density requirement appears to be reasonable in its approach, and the flexibility to allow individual site adjustments (as per the remaining text within the Policy) is welcomed. As there will undoubtedly be occasions where the density will need to be considered in further detail due to other on-site factors/ mitigation measures.
Possibly update to highlight support for higher net densities being prioritised in Key, Service Centres and Primary Settlements which are naturally well served by regular public transport provision and Active Travel routes, or near to services and facilities.
Policy SP5 – Creating Healthy & Inclusive Places and Spaces
Policy SP5 is supported in principle insofar as it seeks to promote healthier and more inclusive places, consistent with the objectives of Planning Policy Wales and the Well-being of Future Generations (Wales) Act 2015. However, to ensure the policy is robust and effective, it is important that it is supported by an up-to-date and clearly evidenced policy framework. In this regard, the supporting evidence base, particularly BP36 – Planning Healthy Places (June 2024), should be reviewed to ensure that the datasets referenced reflect the most recent available information. For example, life expectancy data currently cited (2018–2020) and indicators based on the Welsh Index of Multiple Deprivation 2019 should be updated where possible to reflect the most recent datasets, including the Welsh Index of Multiple Deprivation 2025 and any updated public health, active travel, air quality and demographic data. Ensuring that the evidence base reflects the latest available information is necessary to demonstrate that the policy is justified and based on an accurate understanding of local health conditions and inequalities.
The policy framework should also be updated to reflect the Health Impact Assessment (Wales) Regulations 2025, which were approved by the Senedd in November 2025 and will come into force on 6 April 2027. At present, these forthcoming statutory requirements are not referenced within Policy SP5 or the supporting guidance. Given that the regulations will establish a statutory framework for the preparation of Health Impact Assessments in Wales, it will be important for the RLDP and supporting documents to clarify how the policy’s screening, checklist and Rapid HIA requirements will interact with the statutory regime once implemented. Including reference to the regulations would help ensure that the policy remains aligned with national legislation and is future-proofed over the plan period.
The supporting Rapid Participatory HIA of the Deposit RLDP (BP3, September 2025) provides useful background regarding the Council’s engagement with stakeholders in preparing the plan. However, it would be beneficial for the Council to clearly explain how the findings of that work have informed the specific requirements contained within Policy SP5. Providing a clearer link between the outcomes of the participatory HIA and the policy approach adopted in the RLDP would improve transparency and demonstrate that the policy has been shaped by the evidence gathered through the stakeholder engagement process.
Table 4. Extract of Proposed Criteria for HIA Assessments
The emerging Health Placemaking Supplementary Planning Guidance (SPG) is broadly welcomed as a practical tool to support implementation of the policy. Nevertheless, a number of matters require further clarification prior to its adoption. In particular, whilst the SPG provides greater clarity regarding the use of the Healthy Placemaking Checklist and Rapid HIAs, it does not clearly identify the circumstances in which a comprehensive (full) HIA would be required. The SPG should also be updated to reflect forthcoming guidance from the Welsh Health Impact Assessment Support Unit (WHIASU) expected in 2026, and ensure alignment with other relevant policies and guidance, including those relating to design, travel plans, public transport accessibility and open space provision. Given the number of cross-references within the SPG, it will be important that these documents are fully aligned and consistent.
Finally, any requirement for a Health Impact Assessment should be applied on a proportionate basis, reflecting the scale, nature and likely impacts of the development proposed. The policy should therefore make clear that the scope and level of detail required for HIAs will be proportionate to the scale and type of development. Subject to these amendments and clarifications, the policy would provide a clearer and more effective framework for integrating health considerations into the planning process.

Active and Social Places
Policy SP6 – Housing Requirements
Please refer to Policy SP1 as written response also accounts for information proposed under this particular policy.
Policy HG1 – Housing Allocations
HG1 KS2 – Land to the North of Dinas Powys
Persimmon wholly support the inclusion of Land to the North of Dinas Powys (HG1 KS2) as a proposed site allocation within the emerging RLDP. The site represents a logical extension to the existing settlement of Dinas Powys and provides an opportunity to address local housing needs within a highly accessible and well-connected location. Given its position adjacent to the existing settlement boundary of Dinas Powys, the site also is also well served by existing services, public transport links, schools and community facilities, thereby reducing reliance on private car travel and supporting national and local placemaking objectives.
The proposed scheme has also been designed to make effective use of land that is both logically related to the existing urban form and clearly aligns with the Council’s growth strategy. Given the level of demand in the area, a particularly significant benefit of proposed allocation HG1- KS2 is the commitment to deliver a minimum of 100 affordable homes, representing 40% of the total provision. The site will therefore make a meaningful contribution to meeting locally needs and incorporate a mix of tenures that directly responds to the Vale’s LHMA/evidance base. These principles align with the Councils aspirations to foster more inclusive communities and thus remain consistent with Policy SP4 and Policy PGD1. From a design perspective the proposed scheme has also informed by a comprehensive masterplanning process ensuring that high quality design, integrated green infrastructure, and sustainable transport connections integrated throughout the proposed layout.
Ecological considerations have similarly informed the proposed layout for the site. Technical work, including the Preliminary Ecological Appraisal and subsequent strategy documents, have confirmed suitable biodiversity enhancements can be delivered through a network of retained and reinforced green corridors, historic woodland protection, and supplementary planting. The masterplan prioritises ecological connectivity, incorporating wildlife corridors, dark routes for nocturnal species, and extensive areas of multifunctional open space. These measures not only mitigate potential impacts on identified species, such as dormice, but provide clear opportunities for biodiversity net gain in accordance with the Environment (Wales) Act 2016. The integration of Sustainable Drainage Systems within landscaped areas further demonstrates how flood attenuation, habitat creation and recreational provision can be delivered in a cohesive manner. Thereby ensuring that environmental enhancements are incorporated throughout the scheme from the outset which fully accord with the RLDP’s objectives in that respect.
In transport and community infrastructure terms, the site’s sustainable credentials are equally compelling. The proposed access arrangements onto Cardiff Road have been refined in response to feedback from the highway department, whilst demonstrating deliverability and promoting safe access for all users to avoid having any adverse impacts on local highway network. Geographically the site also lies within immediate walking distance of Eastbrook and Dinas Powys rail stations, which inevitably aligns with the Council’s transport-orientated growth strategy. In turn these principles accord with national placemaking objectives set out in PPW12 and shall actively encouraging a modal shift away from private vehicles to incentivise more active forms of travel. Most notably this includes dedicated pedestrian and cycle links through the site providing connectivity with a range of local services and facilities.
By virtue of the above we fully support the proposed allocation of Land to the North of Dinas Powys (HG1 KS2). As the proposed developer Persimmon Homes remain committed to development opportunities the site presents and its ability to help deliver much needed full market and affordable homes in a highlight sustainable location, which clearly accord with the Council’s proposed growth strategy.
Policy HG1 (B) – Housing Allocations
HG1 (3) Barry - Land at Hayes Lane
Persimmon Homes question to suitability of allocating residential development on the site known as Land at Hayes Lane, The Bendricks. These concerns are centred on the following:
Unsustainable Location & Poor Connectivity
Whilst the site is technically identified within the settlement boundary, it is clearly not a sustainable location for residential development. This is evident by virtue of the fact that Land at Hayes Lane is situated within an existing industrial estate and lacks any supporting facilities. The former reinforces the principle that as a whole the area is characterised by a mix of light industrial and heavy industrial uses which naturally conflicts with the prospect of future residential housing. Moreover, it is reasonable to assume vehicles using the local highway network will be larger in nature (such as HGV’s), and given the majority of streets do not contain dedicated pedestrian footpaths/ cycleways, this raises concerns from a highway safety perspective.
Although we note the Transport Statement from AECOM suggests access can theoretically be achieved to Barry and Sully. Both of these settlements remain over 2km from the site and lie outside of the distances deemed acceptable by Transport for Wales (TfW) to support resident development. Allocating housing on Land at Hayes Lane which therefore does not comply with such criteria would clearly undermine the Council’s objective of pursuing a Transport Orientated Growth approach and by virtue of which risk promoting an unsustainable pattern of development within the emerging RLDP.
As outlined above given the nature of the area there are almost no existing active travel routes in this part of the region. This lack of provision would ultimately lead to future residents using alterative options and many of which would require residents to overcome physical barriers in order to travel in a more sustainable manner. For instance, due to the level of infrastructure associated with the port, the site is effectively detached from the main urban area of Barry and would involve crossing an active railway line halfway along Wimborne Road without sufficient mitigation measures in place. On the other hand, whilst Hayes Road extends further west towards Sully, it follows the southern boundary of the Polaris Industrial Estate which contains various access points that are in regular use throughout the day. Collectively these characteristics would prevent future occupants travelling in a more active manner which is in direct conflict with both local and national planning policy objectives.
The site’s geographic isolation means that access to modes of public transport are extremely limited. Most notably that includes railway stations with the nearest being Cadoxton Station which is located circa 3.8km north of the site. By AECOM’s own accord this is considered to equate to a minimum walking distance of 52 minutes which exceeds TFW’s standards for residential development. Again, this reinforces the fact future residents would be overly reliant on private vehicles to access local services (such as employment opportunities, schools, doctor surgeries etc) which in turn shall achieve an unsustainable pattern of growth and increase associated carbon emissions.
Loss of Allocated Employment Land
Crucially, the site remains allocated in the adopted LDP for B1/B8 employment uses. These intended to facilitate small industrial and workshop units as part of the Atlantic Trading Estate’s expansion and in turn support opportunities for local businesses/ enterprise ventures. The council’s latest Employment Land Review confirms a clear demand for such uses in Barry, with Land at Hayes Lane representing the most logical location for further growth. Reallocating this land for housing would therefore diminish the Vale of Glamorgan’s ability to attract sufficient economic investment to support the requisite levels of growth over the emerging plan period, and potentially displace businesses to other less suitable parts of the region which would not be in the interests of good placemaking as per PPW12.
Although the RLDP’s evidence base suggests there are other development opportunities within the region that could compensate for the proposed loss of employment land. Upon further review it is apparent these are in less favourable locations from both a strategic and operational standpoint. Reassigning Land at Hayes Lane from employment to residential would therefore undermine the Council’s objective of safeguarding existing employment land and prioritising business/ industrial uses in area’s well served by infrastructure designed to accommodate such activities (such as Barry Docks). Furthermore, it would also set a precedent for other potential losses and in doing so impact the Council’s ability to meet the region’s employment needs up to 2036.
By virtue of the above, Persimmon Homes object to the proposed allocation of residential development on Land at Hayes Lane. The principle of which is in direct conflict with the Welsh Government’s objectives set out within PPW12 & Future Wales: The National Plan 2040 and the need to ensure existing employment land is suitably protected. The latter is crucial in attracting future investment to the region and shall act as a catalyst to enable housing to be delivered elsewhere, in more sustainable locations better connected to local services/ facilities, such as Dinas Powys.

HG1 (5) Llantwit Major - Land between the Northern Access Road and Eglwys Brewis Road (Site C – Central Parcel)
Whilst we do not oppose the overall principle of residential development at Site C (Central Parcel), this position must be considered in the context of the wider allocation. Applications for Sites A and B (2020/00351/OUT (Site A) & 2020/00352/OUT (Site B)) are currently pending subject to respective Section 106 Agreements, with prolonged negotiations resulting in significant delays to delivery. This experience clearly demonstrates that development within this allocation is complex and subject to extended viability and legal discussions, which inevitably impacts the rate at housing is able to come forward.
According to the Council’s register we understand Site C has not been subject to any formal planning application, and therefore there is no detailed evidence available regarding the proposed layout design, infrastructure requirements, viability, or anticipated submission and determination timeframes. Despite this, the Council’s housing trajectory assumes development commencing in 2028/29, with 35 units initially and 45 units annually thereafter. Given the absence of a live application and the precedent of delays on Sites A and B, these delivery assumptions appear overly optimistic based on current evidence.
On that basis we maintain that the Council should reassess the trajectory assumptions for this particular site and identify other alternatives to help account for any unforeseen slippage on Site C. The overarching purpose of which shall be to ensure the RLDP incorporates sufficient flexibility to consistently meet housing need over the entire plan period.
Policy HG3 – Housing Led Redevelopment Opportunity
Persimmon Homes acknowledges the Council’s position in respect of Site HG3 (1) – Former Eagleswell Primary School, including the temporary five-year consent (2024–2029) for 90 units of short-term accommodation and their inclusion within housing completions for monitoring purposes.
Given their expressly temporary nature and planned relocation to other sites within the Vale by 2029, it is essential that these units are not double counted in a way. As the risk of doing so would artificially inflate the Vale’s housing numbers, thereby preventing delivery opportunities elsewhere over the plan period.
Although we welcome the clarification provided at paragraph 6.111 which states that once the temporary units are removed and the site is redeveloped for permanent accommodation, any future dwellings will not be included within the RLDPs housing supply figures. In the interest of soundness, we believe this should explicitly set out within the proposed wording of Policy HG3 to avoid any potential ambiguity and thus ensure no additional net housing contributions will arise from the site upon its redevelopment later down the line.
This approach is critical given the Vale’s substantial existing landbank and the number of allocations being rolled forward, as cumulatively factoring in additional units from this site would further constrain opportunities to accommodate genuine growth elsewhere. Thereby limiting the Council’s ability to effectively meet local housing need up to 2036.
Policy SP7 – Affordable Housing Provision
In principle, Persimmon support Policy SP7’s objective to secure a minimum of 3,070 affordable homes over the plan period. That said, given the level of affordable housing is directly proportionate to the total housing provision within RLDP we believe there is scope for further uplifts in that respect.
As mentioned above Persimmon maintain that there is sufficient evidence to justify increasing the proposed housing requirements through the Vale’s flexible allowance in order to maximise opportunities for growth. In turn this would prevent artificially capping affordable housing provision at 3,070 homes to ensure the plan is positively prepared by incorporating measures that proactively address demand across the region.
National policy clearly supports this approach. Planning Policy Wales requires development plans to be positively prepared and to maximise the delivery of affordable housing as a key component of sustainable placemaking. The Development Plan Manual reinforces the need for plans to be aspirational, evidence-led and sufficiently flexible to ensure delivery. Furthermore, the Welsh Government 2025-based estimates of additional housing need report highlights the need for a step change in affordable housing delivery across Wales, recognising that continuation of past trends will not address the current affordability challenges. Collectively, this provides a clear direction of travel in that it’s imperative to uplift housing provision where affordability pressures are acute such as the Vale of Glamorgan.
To ensure the RLDP is sound, the Council should increase the overall housing requirement by apply a meaningful flexibility allowance that ensure sufficient contingency measures are in place to consistently meet local need over the plan period. This would directly increase the quantum of affordable housing secured through policy mechanisms, thereby aligning the Plan with national policy objectives. The latter goes to the heart of the tests of soundness within the Development Plan Manual in ensuring the plan is not only appropriate but capable of delivering the step change required to address affordable housing needs up to 2036.
Policy SP8 – Affordable Housing Requirements
Persimmon supports the position that residential development should help meet affordable housing need. Although to ensure Policy SP8 is effective its important the percentage requirements and site thresholds proposed are viable across a range of site types and market areas to ensure they do not inadvertently suppress delivery.
On that basis we believe it would be prudent for the Deposit Plan to clarify that affordable housing targets are subject to site-specific viability considerations and can be adjusted in circumstances where comply with such parameters would render the sites viable and thus prevent delivery. Greater flexibility is also needed in tenure and mix to better reflect evolving local needs over the entire plan period including the point when planning applications are formally submitted.
Policy SP10 – Sustainable Transport
Persimmon support the overall objective of Policy SP10 in seeking to promote sustainable transport, increase active travel opportunities and reduce reliance on the private car in accordance with national placemaking objectives. Encouraging development in accessible locations such as Dinas Powys and enhancing connectivity between settlements is welcomed. However, for soundness its important the policy recognises the different physical characteristics across the Vale of Glamorgan, particularly in edge-of-settlement and rural contexts where flexibility is necessary to ensure sustainable growth is not unduly constrained.
In this regard, the extend site at Dinas Powys represents a suitable and deliverable opportunity that aligns fully with the objectives of Policy SP10. The Authority will be aware that Transport Strategies were submitted at earlier plan-making stages, and these have now been refined through a Technical Note prepared by Vectos (now SLR) in direct response to the Candidate Sites Assessment. The scope of which confirms the proposed access arrangements presented within Policy HG1 KS2 with regards to the primary and secondary vehicular entry/ egress points on to Cardiff Road are acceptable. The former includes the creation of a new signalised junction on to the A4055/ Cardiff Road which has been modelled by Vectos (now SLR) to confirms there will be no adverse impacts with regards to the overall capacity of the local highway network. Furthermore, these measures shall be supplemented by financial contribution towards off-site improvements to help alleviate any existing connection issues/ pinch points and thus enable traffic to flow more freely within Dinas Powys and the wider surrounding area.
In addition, the scheme will deliver significant active travel benefits, including dedicated pedestrian footpaths and cycleways throughout the site that connect seamlessly into the surrounding network. The site lies within immediate walking distance of Eastbrook and Dinas Powys railway stations and therefore aligning with the Vale’s transport-orientated growth strategy. Overall, the refined Transport Strategy demonstrates that the development would not result in any significant adverse impact on the highway network, while actively promoting sustainable travel choices. Subject to proportionate application of Policy SP10 and recognition of the robust mitigation proposed, the site clearly supports and advances the sustainable transport objectives of the emerging RLDP.
Policy TR1 – Transport Proposals
Persimmon supports the overarching objectives of Policy TR1, which seeks to protect and enhance strategic transport infrastructure across the Vale of Glamorgan, including active travel routes, public transport schemes and highway improvements. Land north of Dinas Powys aligns with these objectives by directing growth to a sustainable settlement capable of supporting integrated transport solutions. The scheme has also been designed to incorporate dedicated pedestrian and cycle routes that ensures development sympathetically integrates with the surrounding area. Most notably that includes measures to enhance pedestrian permeability whilst also encouraging a shift towards more sustainable modes of travel.
In addition to the above, allocation future growth at Land North of Dinas Powys will support planned improvements between the Barry/Biglis roundabout and Dinas Powys Active Travel Route by providing on-site pedestrian and cycle infrastructure that links directly to the proposed 2 km shared walking and cycling corridor. By aligning the site layout and access points with this strategic route the scheme shall naturally maximise the route’s functionality, safety and long-term success.
Finally, the site’s highly sustainable location reinforces its accordance with the Council’s transport-led growth strategy. The development is within immediate walking distance of both Eastbrook and Dinas Powys railway stations, which provide frequent services to Cardiff and Barry other key destinations. Prioritising residential growth in such locations continues towards the Vale of Glamorgan’s aim of creating a more sustainable pattern of development, maximising the use of public transport, supporting active travel and reducing reliance on private cars.
Policy SP13 – Community Infrastructure and Planning Obligations
Persimmon Homes do not consider that Policy SP13 – Community Infrastructure and Planning Obligations is required. This is predicated on the basis that such matters are dealt with under separate legislative and policy frameworks. Therefore, as currently drafted the proposed policy (and supporting text) do not add anything further information for planning purposes and risk unnecessary duplication.
Policy CI1 – Open Space Provision
Whilst there are no comments regarding the principle, thresholds and use of the FIT standards in terms of the open space provision. As such Persimmon query the requirement for an Open Space Strategy for all sites that meet the thresholds.
The requirement within emerging Policy CI1 for applicants to prepare or submit an Open Space Strategy is not considered to be sufficiently justified or proportionate when assessed against Planning Policy Wales, which promotes access to open space and recreational provision but does not prescribe the preparation of standalone Open Space Strategies for individual planning applications. There is a lack of clarification as to what it proposed and also how the level of detail would be proportional to the size of the site.
Productive and Enterprising Places
Policy CC1 – Residential Operational Net Zero Carbon Development
Persimmon Homes, strongly object to Policy CC1 on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework.
Building Regulations Part L currently sets the requirements for energy efficiency in new homes, with the current dwellings built by Persimmon Homes being designed to exceed the minimum requirements of Part L by incorporating enhanced insultation and improved building fabric performance. This includes low U-values for key elements such as walls, roofs, floors and windows to minimise heat loss and improve overall energy efficiency. As a result, Persimmon Homes are achieving a high rating under the Energy Performance Certificate (EPC) System, typically within the A-B range.
Introducing a separate and potentially more onerous operational net zero requirement at the local level risks imposing additional cost and complexity that undermines site viability and deliverability. The Development Plans Manual for Wales is clear that development plans must avoid repeating national policy and should not introduce requirements that are more appropriately addressed through other regulatory regimes. In this respect, Policy CC1 is not considered justified or appropriate and thereby conflicts with the second test of soundness set out within the DPM.
The proposed step change in standards from 1 April 2030 (particularly the reduction in space heating demand from 40 kWh/m²/year to 15 kWh/m²/year) represents a significant and abrupt step change in performance expectations. Whilst reference is made to initiatives such as Tai ar y Cyd and AECB CarbonLite, these have largely been associated with grant-funded affordable housing schemes. There is no clear evidence that equivalent standards are able to be delivered on mainstream housing sites without compromising their overall viability. On that note the Development Plans Manual requires policies to be underpinned by robust evidence and deliverable over the plan period. In the absence of which the proposed policy could well prevent housing delivery and undermines the emerging RLDP’s ability to effectively meet housing need.
Further to the above Policy CC1 also risks creating fragmented energy performance standards across different Local Planning Authorities in Wales. This contradicts the benefit of a consistent national approach through Building Regulations and makes it significantly more difficult for mainstream housebuilders operating across multiple authority areas to deliver homes efficiently. The DPM emphasises the need for development plans to create policy frameworks that encourage housing delivery and avoid unnecessary complications. By introducing bespoke operational monitoring requirements and energy modelling thresholds the policy as currently worded blurs the boundary between planning and Building Control functions. In turn this raises concerns as to whether the policy is justified and capable of being applied consistently across the board.
Finally, the Council’s own Viability Assessment (Paragraph 6.60 of BP42) acknowledges current uncertainty given the outcome of Welsh Government’s consultation on this topic are still unknown at the time of writing. In the event the Welsh Government decide to peruse national regulation progresses, it may be more appropriate for such matters to be addressed through Building Control rather than planning policy. Once again, this reinforces Persimmon’s concern that Policy CC1 is premature and not in general conformity with national policy. As drafted, the policy risks undermining the council’s proposed housing supply, affordable housing delivery rate and general implementation over the plan period. For these reasons, we believe it fails to meet the relevant tests of soundness and should be omitted from the proposed RLDP.
Distinctive and Natural Places
Policy SP19 – Green Infrastructure
In principle Persimmon Homes support the aim of this policy in ensuring proposed development incorporate measures that protect and enhance green infrastructure provision.
For completeness the proposed allocation (Land at north Dinas Powys) has been informed by a comprehensive Green Infrastructure Strategy and Landscape Summary Note prepared by Tir Collective (August 2023). The reports demonstrate that the site has been designed in a manner consistent with the objectives of Policy SP19. While future development of the site technically requires a release from the locally designated Green Wedge between Dinas Powys, Penarth and Llandough, the scope of which is limited in nature. Paragraph 3.70 of PPW12 states that Green Wedge boundaries should only include land that is required to remain open for the longer term. In this context, the Council’s Green Wedge Background Paper indicates that proposed allocation HG1 KS2 shall not result in any coalescence between settlements and nor does it make a significant contribution to the overall integrity of the designation. These factors confirm that the site is suitable for accommodating future residential development.
The emerging masterplan adopts a landscape-led approach that responds to the site’s physical characteristics and surrounding context. Development has therefore been excluded from the most visually sensitive parts of the site which will instead be retained as public open space to avoid having any adverse impact in that respect. This approach is reinforced through the retention and enhancement of existing hedgerows, woodland and field boundaries, alongside supplementary planting to naturally integrate the site into the wider landscape framework.
Policy SP20 – Biodiversity and Ecosystem Resilience
In principle, Persimmon support the objective of Policy SP20 which intends to protect and enhance biodiversity and ecosystem resilience. However, in the interests of soundness we believe the proposed requirement relating to biodiversity enhancement should be reframed to ensure it remains consistent with national policy. In particular, the policy should clarify that development proposals are expected to deliver biodiversity betterment in a manner that is proportionate to the scale and nature of development and consistent with national guidance. The wording should avoid introducing a requirement for a specific or quantified biodiversity net gain approach that goes beyond the national policy framework. Ensuring that the policy reflects the approach set out in Planning Policy Wales 12 will provide greater certainty for applicants and decision-makers while still providing sufficient comfort in securing the requisite biodiversity improvements.
Policy DNP1 – Special Landscape Areas
Persimmon support the revision of the Cwrt-yr-Ala Basin Special Landscape Area (SLA) to reflect the allocation of key site (HG1KS2 North of Dinas Powys off Cardiff Road) as per Policy DNP1. As indicated in Background Paper BP28 – Special Landscape Areas, the future development proposals for the site will be required to incorporate mitigation to reduce the impact of the site on the SLA. These works are incorporated into the proposed masterplan.
Policy DNP2 – Green Wedges
Persimmon support the revision to the green wedge between Dinas Powys, Penarth and Llandough, at Policy DNP2 (1) which has been amended to reflect the key site allocation HG1KS2 North of Dinas Powys.
Policy DNP8 – Severn Estuary Recreational Pressure
Policy DNP8 seeks to address recreational pressure on the Severn Estuary Special Area of Conservation, Special Protection Area and Ramsar Site. Whilst Persimmon appreciate the overarching purpose in its current form the proposed policy lacks sufficient supporting information explaining how it will operate in practice. The supporting text suggests that key details relating to mitigation delivery, including mechanisms such as Suitable Alternative Natural Greenspace and wider access management measures, will be set out in future Supplementary Planning Guidance. Deferring these important details until later down the line creates uncertainty at the plan-making stage and makes it difficult to assess whether the policy is sound, effective and/ or capable of being implemented on a consistent basis.
The policy also provides no clear threshold or criteria for determining what level of activity would constitute “visitor pressure” or an “adverse impact” on the integrity of the designated sites. Similarly, the evidence demonstrating what level of impact residents moving into new homes across the Vale of Glamorgan will generate additional recreational pressure on the Severn Estuary does not appear to have been quantified to date. While a 12.6 km recreational catchment is referenced, the supporting text does not clearly explain the evidence or methodology underpinning this distance. Moreover, the proposed text also fails to set out how new residential development will be assessed in terms of measurable impacts on the European site and thus the scope of mitigation that would subsequently be required.
From a practical standpoint this level of uncertainty is concerning given the implication of this policy are unable to be fully assessed due to the lack of evidance. For instance, if development sites within the catchment are expected to contribute financially towards mitigation measures, then the scale and mechanism of those contributions must be clearly established as part of the plan-making process. Without this clarity, there is a risk that Policy DNP8 could introduce unforeseen costs and extensive time delays, potentially affecting the viability and overall deliverability of proposed housing sites. The cumulative impact of which would then undermining the plan’s ability to meet its housing requirements and risk finding the RLDP unsound.
Conclusion
Subject to the comments within this response, Persimmon are broadly supportive of the Deposit RLDP put forward. Persimmon Homes’ most pertinent comments on the consultation document are summarised below:
• Persimmon fully supports the proposed approach to prioritise development in sustainable locations near existing rail and bus infrastructure as depicted by the strategic growth area within the RLDP Key Diagram. However, to optimise the effectiveness of this strategy growth should be focused in areas of greatest demand, such as Dinas Powys, which is not only the nearest settlement geographically to Cardiff but also inherently well connected by the existing rail network and other modes of public transport.
• Persimmon support the principle of the Settlement Hierarchy and the identification of Dinas Powys as a Primary Settlement. Whilst the importance of which is noted, Persimmon maintain that Dinas Powys, in particular, is capable of a higher role and function which can be accommodated in the extended Candidate Site Ref. No 444. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
• Whilst Persimmon supports the overall principle of a medium growth strategy and key allocations such as North Dinas Powys. Given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to overall housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
• In the interests of soundness these changes shall help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Persimmon therefore conclude that a higher flexibility allowance and additional site allocations, such as the extended option at Dinas Powys, are necessary to ensure the RLDP is able to effectively meet local need over the plan period. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
• Whilst Persimmon welcome the majority of the proposed planning policies from a development management perspective. They strongly object to Policy CC1 (Residential Operational Net Zero Carbon Development) on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework.
• Although Persimmon appreciate the overarching purpose of Policy DNP8 (Severn Estuary Recreational Pressure). In its current form the proposed policy lacks sufficient information to understand how it will operate in practice. Whilst supporting text suggests that key details relating to mitigation delivery will be set out in future Supplementary Planning Guidance. Deferring these important details until later down the line creates uncertainty at the plan-making stage and makes it difficult to assess whether the policy is sound, effective and/ or capable of being implemented on a consistent basis.
• Persimmon are wholly supportive of Land North of Dinas Powys’ (HG1 KS2) position as a proposed allocation within the emerging RLDP. The site represents a suitable, available and deliverable location for residential development without any constraints preventing it from delivering much needed homes in line with the Council’s proposed housing trajectory. Furthermore, its position as a key site is crucial to ensure growth is prioritised in such a highly sustainable location, adjacent to the defined urban area of Dinas Powys, and maximise opportunities for greater connectivity at both a regional and local level.
Persimmon would welcome the opportunity to continue on-going conversations with Officers and subsequently support the site’s progression through the next stages of the plan-making process.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6912

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Boyer Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Barratt Redrow question to suitability of allocating residential development on the site known as Land at Hayes Lane, The Bendricks. These concerns are centred on the following:
Unsustainable Location & Poor Connectivity - Whilst the site is technically identified within the settlement boundary, it is clearly not a sustainable location for residential development. This is evident by virtue of the fact that Land at Hayes Lane is situated within an existing industrial estate and lacks any supporting facilities.

Given the nature of the area there are almost no existing active travel routes and access to modes of public transport are extremely limited. Most notably that includes railway stations with the nearest being Cadoxton Station which is located circa 3.8km north of the site.

Loss of allocated employment land - the site remains allocated in the adopted LDP for B1/B8 employment uses. These intended to facilitate small industrial and workshop units as part of the Atlantic Trading Estate’s expansion and in turn support opportunities for local businesses/ enterprise ventures. The council’s latest Employment Land Review confirms a clear demand for such uses in Barry, with Land at Hayes Lane representing the most logical location for further growth. Although the RLDP’s evidence base suggests there are other development opportunities within the region that could compensate for the proposed loss of employment land. Upon further review it is apparent these are in less favourable locations from both a strategic and operational standpoint.

Testun llawn:

1. INTRODUCTION
1.1 These representations build upon the responses previously provided to the Call for Sites Consultation, additional information submission, and more recently the Barry Growth Paper in July 2025. For the avoidance of doubt these representations relate to Barratt Redrow Homes’ land interest know as ‘Swn Y Coed, Wenvoe’. The site has previously been identified as Ref No 437 within the Council’s Candidate Site Assessments including the Preferred Strategy Stage, which has been published as part of the technical evidence base and background papers alongside the Deposit Plan.
1.2 Having reviewed the Deposit Plan it is evident that the document is structured around a number of key sections including:
• Section 3 – The Vale of Glamorgan Key Characteristics;
• Section 4 – RLDP Key Themes, Vision, and Objectives;
• Section 5 – Sustainable Growth Strategy; and
• Section 6 – Policy Framework.

1.3 For completeness this submission shall discuss each section in turn.
1.4 The overarching purpose of which shall be to respond to the relevant draft Replacement Local Development Plan policies, with particular consideration given to the Welsh Government’s tests of soundness as set out within the Development Plan Manual for Wales (Third Edition) March 2020)):
• Test 1 – Does the Plan Fit?
• Test 2 – Is the Plan Appropriate?
• Test 3 – Will the Plan Deliver?

2. THE VALE OF GLAMORGAN KEY CHARACTERISTICS
Settlement Pattern
2.1 Barratt Redrow support, in principle, the Settlement Pattern as set out in Section 3 of the Deposit Plan and in particular the identification of Wenvoe as a Primary Settlement.
2.2 Paragraph 3.9 explains that primary settlements “offer several key services and facilities, which are vital to their role as sustainable communities, as they reduce the need to travel to Barry or the Service Centre Settlements to address day-to-day needs”.
2.3 The importance of the Primary Settlements in supporting the Service Centre Settlements is noted, however Barratt Redrow consider that Wenvoe, in particular, is capable of a higher role and function and can accommodate a higher level of growth over and above affordable led exception sites, which can be accommodated at Candidate Site Ref. No 437. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
Housing Need
2.4 In light of the Vale of Glamorgan’s strategic location in-between Cardiff and Bridgend, and the significant employment opportunities associated with these areas, the Deposit RLDP should seek to maximise housing provision to ensure a more sustainable balance is achieved between homes and jobs, and in turn reduce commuting distances/ carbon emissions.
2.5 Paragraph 3.18 clearly acknowledges the scale of affordable housing need, identifying a requirement for 1,075 affordable homes per annum between 2023–2028 and 154 per annum thereafter. Yet it remains unclear whether existing unmet need has been fully factored into the overall housing requirement presented within the Deposit RLDP. This is particularly importance in the context of the Welsh Government’s 2025-based estimates which identify 9,400 units of unmet need at a national level and a requirement for 8,700 additional homes per annum over the next five years simply to address newly arising need.
2.6 Accordingly, there is a compelling justification for a further uplift in housing numbers to ensure the Plan proactively addresses both existing and emerging need. Increasing the overall housing requirement would directly enhance the overall delivery rate for affordable homes which is crucial in a local authority area with the highest affordability ratio in Wales. Paragraph 3.17 confirms that in the Vale average house prices are 9.7 times average workplace earnings compared to the Wales average of 6.1, therefore a step change in housing targets is needed to support a more balanced housing market across the region.
3. RLDP KEY THEMES, VISION, AND OBJECTIVES
3.1 Section 4 of the Deposit RLDP sets out the Council’s vision over the emerging plan period. The vision establishes a series of strategic goals the Council intends to work towards and in doing so provides an insight into how the Vale of Glamorgan is envisioned to develop up to 2036.
Key Themes
3.2 Barratt Redrow supports the theme ‘Homes for all’ and the need for the housing supply to respond to the growing population and provided in appropriate locations, with a mix of tenure and types. In that respect the site at Swn Y Coed, Wenvoe offers a sustainable and deliverable opportunity to ensure future residential development aligns with such objectives to deliver high quality housing development in a sustainable location.
3.3 In principle, Barratt Redrow support the ‘Placemaking’ theme and consider that development in Swn Y Coed, Wenvoe would ensure a strong sense of identity and that the scheme is capable of providing a well designed and sustainable development.
3.4 Barratt Redrow also support the theme of ‘Promoting active travel and sustainable transport choices’, and in particular the need to ensure that the new development will be in a highly sustainable location with very good access to alternative transport, such as bus services, rather than a reliance on the rail network. This is clearly evident at Swn Y Coed, Wenvoe.
Vision
3.5 In general, Barratt Redrow support the RLDP Vision, however highlight that whilst Barry and other Sustainable Service Centres are identified as playing a vital role in delivering the strategy, the importance of the ability for Primary Settlements, such as Wenvoe, to deliver sustainable and high-quality residential development also needs to be suitably recognised.
3.6 The allocation of Swn Y Coed (Candidate Site Ref: 437) is capable of providing a comprehensive residential development in a highly sustainable location and within an important Primary Settlement. The principle of which aligns with the Council’s ambition to ensure future growth delivers homes which caters for all (including affordable homes) and are prioritised in areas of greatest demand.
3.7 In light of the above it is considered that Wenvoe plays a significant part in delivering the Council’s strategy and the role, function, and ability of this settlement to accommodate growth needs to be significantly reinforced. The settlement is capable of accommodating more growth in a highly sustainable location we believe warrants greater recognition within the vision itself.
Strategic Objectives
Objective 3 – Home for All

3.8 Barratt Redrow supports the principle of Objective 3, in particular the provision of high quality housing which includes the right mix, tenure and type. Barratt Redrow supports the notion of providing residential development in places which people want to live, and in particular Wenvoe as a Primary Settlement.
Objective 4 – Placemaking
3.9 As above, in principle Barratt Redrow support the Council’s placemaking objectives which seeks to ensure all development will contribute positively toward creating a sense of place. Most notably this involves prioritising future growth in sustainable locations which are placed to create attractive, safe and accessible schemes that are equally effective from a functional standpoint.
3.10 The proposed allocation at Swn Y Coed (Ref 437) at Wenvoe aligns with such principles whilst also providing an opportunity to facilitate a high quality, mixed tenure residential development of circa 80+ open market & affordable homes, with a high-quality distinct character responding to the site context and creating a sense of place.
Objective 8 – Promoting Active and Sustainable Travel Choices
3.11 Barratt Redrow supports the principle of promoting active and sustainable travel choices and highlight that their residential development at Wenvoe has been designed to ensure accessibility it’s at the heart of the scheme with regards to walking, cycling and connectivity to public transport.
3.12 Given the site abuts the defined urban area of Wenvoe it represents a logical extension to the existing settlement and is well served by a range of local amenities and public transport. In terms of the latter the nearest bus stop is located within 100 meters of the site whilst the majority of local amenities are situated within 1.2 kilometres walking distance. Together these factors naturally promote the principle of linked trips which fully accords with the Chartered Institution of Highways and Transportations (CIHT) guidelines and reinforces the fact the site is a sustainable location for residential development.
3.13 Therefore, the site provides an opportunity to promote a modal shift towards more active forms of travel and consequently reducing dependency on private vehicle and associated carbon emissions. From a plan-making standpoint allocating further growth in this highly sustainable location would help achieve greater connect at both a regional and local level.

4. SUSTAINABLE GROWTH STRATEGY
Growth Strategy
4.1 RLDP Sustainable Growth Strategy comprises six key elements as follows:
1. Delivering a sustainable level of housing and employment growth supported by appropriate infrastructure that accords with the Vale’s position within the Cardiff Capital Region (CCR).
4.2 In order to meet the overarching Vision, the Vale have identified a need to deliver at least 8,679 new dwellings over the proposed plan period which responds to the identified housing requirement of 7,890 homes (526 per annum) and incorporates a 10% flexible allowance. Barratt Redrow acknowledge the proposed approach, however, maintain it should be considered a minimum figure with aspirations to achieve greater levels of growth in sustainable locations across the district.
4.3 Whilst Barratt Redrow appreciate these figures are based on average completion rates over the first ten years of the adopted Local Development Plan, it is important to recognise that a higher rate of housing delivery is demonstrably achievable. Annual completion rates peaked at 917 dwellings, with six of the ten monitoring years exceeding the 526 per annum figure currently relied upon. This demonstrates that delivery capacity within the Vale has historically operated well above the proposed requirement and should therefore provide confidence that a higher housing target could realistically be achieved over the emerging plan period.
4.4 Furthermore, the Council’s own evidence base (BP7 - Housing and Employment Growth Options) identifies a five-year average build rate of 780 units per annum between 2016 and 2021. Again, this figure exceeds the annual delivery rate currently proposed within the emerging RLDP and reinforces the fact that the proposed housing requirement should not be unduly constrained by a lower long-term average.
4.5 Whilst Paragraph 5.8 explains that the proposed figures are based on a ten-year average delivery rate, it fails to acknowledge that this period included the Covid-19 pandemic and at a time where construction costs experienced significant inflation. These factors had a material impact on the housebuilding industry nationally and inevitably suppressed delivery rates during those years. From an objective perspective, basing the future housing requirement on an average that includes these exceptional circumstances risks skewing the figures and underestimates the district’s true delivery potential for the Vale.
4.6 In light of the above Barratt Redrow believe a sensible response would be to incorporate a greater flexible allowance of 15% within the RLDP to demonstrate an appropriate level of growth will be achieved. Whilst also ensuring there is sufficient supply of sites to come forward early on during the plan period to proactively address housing need from the point of adoption up to 2036.
4.7 From a procedural standpoint it is also important to note that the currently adopted plan predates the publication of Future Wales: The National Plan 2040 and the Vale’s position within a national growth area. As such, pursuing an approach which seeks to maintain historic delivery rates is not considered to reflect this enhanced role and arguably lacks the level ambition set out at a national level. The proposed housing requirement should therefore be uplifted to positively respond to such matters in order to ensure conformity with Future Wales and regional aspirations.
4.8 Increasing the overall housing target would also act as a catalyst to enhance the delivery of affordable housing which is identified as a key objective for the RLDP. Each proposed site allocation is subject to a policy-compliant percentage contribution, therefore a higher level of market housing would proportionately generate a greater number of affordable homes to meet local need across the region.
2. Aligning locations for new housing, employment, services and facilities to reduce the need to travel.
4.9 Barratt Redrow supports the Vale’s objective to locate new major development in areas of the region best served by existing infrastructure and supporting services. The Settlement Appraisal Review (BP5) identifies Wenvoe as primary settlement in the region with suitable local services to accommodate future growth which remains in keeping with the overall function of the existing settlement.
4.10 Whilst the settlements of Barry, Penarth, Llantwit Major and Cowbridge are deemed to score higher on certain criteria it is clear that Wenvoe has a role and function providing both local key facilities and also acceptable linkages and distance to wider key and daily facilities.
3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.
4.11 The Deposit RLDP explains that whilst reducing the need to travel is a key policy objective, it is recognised that there are journeys that will need to be made by other modes of transport, particularly due to the strong relationship with Cardiff as a designation for employment, retail and entertainment. As such the proposed growth strategy seeks to locate development in places that are inherently well served by sustainable transport in line with the Vale of Glamorgan’s transport hierarchy.
4.12 Barratt Redrow supports these principles and recognises the importance of prioritising development in sustainable locations across the regions, particular those well connected to Cardiff city centre. Paragraph 5.18 of the Deposit Plan states that “Targeting new development to the settlements that are served by the rail network is a key part of the strategy, as it will facilitate journeys being made by means other than the car”. Barratt Redrow consider that the rail network is an important way to facilitate journeys other than by car, however it is not the only option available and that other sustainable sites, such as Swn Y Coed, are also accessible by public transport – namely bus services.
4.13 Whilst Barratt Redrow support the principle of prioritising growth within the Council’s sustainable transport corridor, it is important to recognise that there is not an infinite supply of land within close proximity to railway stations across the Vale of Glamorgan. Physical constraints, settlement patterns and environmental designations mean that the availability of suitable and deliverable sites within immediate walking distance of rail infrastructure is somewhat limited. Therefore, relying solely on these locations risks unnecessarily constraining the overall supply of land for housing and may limit the Council’s ability to maintain a consistent supply of homes up to 2036.
4.14 In this context, Barratt Redrow believe the RLDP should be updated to also identify opportunities for growth in locations that are well served by the strategic bus network. From a procedural standpoint this approach would remain consistent with the overarching objective of a transport-orientated growth strategy, whilst recognising the wider role bus corridors can play in facilitating a sustainable pattern of development. The benefits of which would provide greater certainty that local housing needs can be met over the proposed plan period and in turn strengthen the council’s ability to demonstrate the plan has been soundly prepared.
4.15 By directing development to locations well served by existing bus infrastructure, the proposal would help reduce the need for commuting via private vehicles, particularly for journeys to key employment and service destinations. In doing so, it would make a positive contribution towards the Council’s climate change targets through the reduction of carbon emissions and promoting a modal shift within the local community.
4.16 In relation to Swn Y Coed, bus stops are conveniently located at Walston Castle and Station Road approximately 95m and 440m from the site off the A4050, providing regular services to Cardiff City and surrounding settlements.
4.17 Furthermore, to the north of the site Culverhouse Cross is easily accessed by cycling, walking or via bus routes which can be caught just 100m east of the site. Culverhouse Cross Retail Park has an extensive range of facilities and employment opportunities that are within 2km of the site (easy walking and cycling distance).
4.18 Overall, it is considered that the site is in a relatively sustainable location and is within easy walking distance of public transport and Wenvoe village centre, which provides some basic facilities approximately 600m south of the site. For the reasons set out above, the site is considered to offer an opportunity for residential development in a suitable location that would facilitate and encourage sustainable travel, with no major highway related concerns.
4.19 Focussing further growth in well-connected, sustainable locations such Wenvoe will therefore support the Council’s transport-led placemaking approach. These principles fully align with the Welsh Governments strategic objectives as set out within the Future Wales – the National Plan 2040, Planning Policy Wales Edition 12 and Llwybr Newydd: The Wales Transport Strategy, which in turn shall contribute towards achieving a more sustainable pattern of development within the RLDP.

5. POLICY FRAMEWORK
5.1 Section 6 of the Deposit Plan outlines the policy framework for delivering the plan, including both Strategic and Development Management Policies following revisions pursuant to the Preferred Strategy consultation.
5.2 The Deposit Plan has arranged these policies into the four themes of Planning Policy Wales as follows:
• Strategic and Spatial Choices
• Active and Social Places
• Productive and Enterprising Places
• Distinctive and Natural Places
5.3 Whilst some of the technical details overlap, each of the policies considered to be of relevance are discussed in further detail below.
Policy SP1 – Sustainable Growth Strategy (& Policy SP6 – Housing Requirements)

5.4 This policy states that in order to deliver the Sustainable Growth Strategy for the Vale, the emerging RLDP will make provision for 7,890 dwellings and 5,338 jobs over the plan period. In order to achieve the former Policy SP6 explains that to meet the identified housing requirement of 7,890 dwellings, provision will be made for the delivery of 8,660 homes in the Plan Period 2021 to 2036 which incorporates a 10% flexible allowance. In turn this will be distributed as follows: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.
5.5 Barratt Redrow acknowledge the Council’s conclusion that in principle the ‘Medium’ growth option reflected in Policy SP1 generally accords with the Welsh Government’s aspirations for the Vale of Glamorgan within the Future Wales national growth area, which is identified as a focus for strategic economic and housing growth. Given the Vale forms part of the Cardiff Capital Region, it is equally important that the overall level of growth remains suitably ambitious to support the region’s economic aspirations and continues to complement Cardiff which remains the nearest neighbouring authority.
5.6 Although we understand the proposed approach uses the Dwelling-led 10 Year scenario, which is based on the average annual build rate for the first 10 years of the adopted plan and equates to a total of 7,890 new homes or 526 dwellings per annum over the emerging plan period. The overarching intention is to ensure the projected level of growth is deliverable whilst recognising the fact there is sufficient capacity within the Vale to support further growth towards the higher end of the ‘medium’ range.
5.7 As noted, Barratt Redrow are wholly in support of providing additional sites, such as Swn Y Coed, Wenvoe, which would provide a logical extension to the defined urban area of Wenvoe and which will facilitate the delivery of much needed full market and affordable housing to help address the significant level of demand identified across the Vale.
5.8 Swn Y Coed is promoted in the context of the concerns raised regarding the current figure of 8,660 new dwellings which is underpinned by a 10% flexible allowance in relation to housing delivery. Barratt Redrow consider it relevant to take account of recent evidence provided to other Local Planning Authorities in Wales which have either adopted or are in the latter stages of bringing forward a new Local Development Plan.
5.9 For example, in Bridgend the Council recently adopted their new Local Development Plan (covering the period 2018 to 2033) which is underpinned by a flexibility allowance of 14% equating to an additional 1,053 dwellings. This level of provision was required in order to demonstrate the Anticipated Annual Build Rate (AABR) were deliverable and ensure that the Plan remains effective in the event of changing circumstances. During the examination process the Inspector explained that an increase beyond the standard 10% was fundamental to enable the plan and its housing trajectory to be resilient and sufficiently adaptable. The overarching purpose of which is to account for any unforeseen changes and potential shortfalls/ delays to the strategic site allocations whilst still enabling the overall housing requirement to be delivered.
5.10 For Swansea, the Council published their LDP2 Pre-Deposit Plan (Preferred Strategy) for consultation last year. In terms of housing delivery this incorporates a 20% flexible allowance above the proposed housing requirement and is predicated on the basis of needing to account for certain sites not coming forward as anticipated and other unforeseen factors affecting delivery. Similar to the Vale, Swansea City Council’s latest Annual Monitoring Report (6th Edition) (October 2025) confirms that since adoption of the current LDP in February 2019 they have not met their annual housing target for any of the past six years. To date this has resulted in a shortfall of approximately 3,767 homes which is predominantly attributed to delays associated with larger strategic allocations. Therefore, in order to avoid having similar implications next time around the Council have uplifted the proposed flexible allowance within LDP2 and intend to incorporate a more diverse portfolio of sites going forward. The main purpose of which is to build in an additional margin of flexibility above the standard 10% threshold and therefore enable other sites to come forward to account for potential slippage elsewhere to ensure the plan is effective in meeting local need.
5.11 More recently in Monmouthshire, the Council submitted their proposed RLDP to PEDW in November 2025. As part of which they have identified a requirement of 6,210 homes which incorporates a 15% flexible allowance. Similar to above an increase beyond the standard 10% threshold has been justified to account for potential shortfalls/ delays due to longer lead in times needed for strategic site allocations whilst proactively addressing any historic unmet need.
5.12 Whilst Barratt Redrow appreciate that the Council intends to prioritise growth towards the higher end of the ‘medium’ range, having reviewed the Deposit Plan evidence base Barratt Redrow believe a minimum allowance of 15% would be more reflective of the Vale’s strategic position and would seek an additional 395 dwellings to the medium growth option equating to a total of 9,074 homes. The benefits of which are evident above and justification well-established from a plan-making perspective to ensure the RLDP is underpinned by a robust evidence base which incorporates a suitable level of flexibility to effectively meet local housing need from the outset.
5.13 In addition to the above the importance of increasing the RLDP’s housing target, by virtue of uplifting the proposed flexible allowance, has recently been highlighted by the findings of data published by the Welsh Government (WG). Most notably that includes the 2022-based Local authority household projections (Dated 20th November 2025) and 2025-based estimates of additional housing need (Dated 12th February 2026).
5.14 Upon publishing the former superseded the previous 2018-based demographic projections and provides updated figures from mid-2022 to mid-2032. The results show that whilst the overall number of households in Wales is projected to increase by around 98,500/ 7.2%, to a total of 1.46 million. The local authorities projected to see the largest percentage increases are the Vale of Glamorgan (up 11.7%) and Cardiff (up 11.1%).
5.15 In turn these trends are carried through into WG’s 2025-based estimates of additional housing need, which identifies an existing unmet need of 9,400 homes. This is supplemented by a requirement to deliver an average of 8,700 new homes annually over the next five years to account for newly arising need alone. The combination of which demonstrates that there is an urgent need to increase delivery rates on both a national and local level, and therefore it’s imperative that the latest position with regards to the need for affordable and full market homes are accurately reflected within the Council’s housing figures.
5.16 In terms of considering the level of housing provision for a plan, Paragraph 5.34 of the DPM is explicit in that the most up-to date suite of Welsh Government Population and Household Projections must form the foundation of any evidence base. LPAs are then required to use a household conversion factor when translating households to dwellings to establish overall need. Once again, the DPM explains that failure to include a robust conversion rate from the outset is a high-risk strategy and may undermine the overall soundness of any emerging plan. To avoid such circumstances, we believe it’s essential the LMNA is updated to reflect the latest WG datasets, which in turn is likely to provide grounds to warrant extending the proposed 15% threshold further. Ultimately this approach intends to ensure the emerging RLDP more effectively meet local need over the entire plan period and thus soundly prepared.
5.17 As mentioned above, Policy SP6 provides a high-level breakdown of how the Council’s housing growth is expected to be delivered over the plan period. For completeness this includes: i) 3,837 dwellings from the existing land supply; ii) 3,520 dwellings on allocated sites; & iii) 1,303 dwellings from large and small windfall developments.
5.18 Whilst we do not dispute those relating to proposed site allocations and/ or windfall developments. The proportion of dwellings set to be accounted for within the Vale of Glamorgan’s existing landbank (3,837 units) is considered excessive given it represents 44.3% of the Council’s overall housing requirement.
5.19 Although Barratt Redrow acknowledge that this is partly derived on the basis that emerging plan period has technically already commenced (2021 to 2036) and therefore is made up of


Figure 2. Extract of the Welsh Government’s Calculation Method for Total Dwellings as per the Development Plan Manual Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


sites at various different stages of planning process (i.e. either already built out, being constructed or secured consent - as shown below). It is important to recognise the potential implications this approach has in terms of stifling opportunities for growth, which is contrary to the Welsh Government’s aspirations for the Vale of Glamorgan as part of a National Growth Area within Future Wales: The National Plan 2040.
5.20 From an objective standpoint this means there is only a need for 2,561 additional dwellings (3,520 dwellings minus 959 units rolled forward) to be delivered from new allocations over the emerging plan period. This reinforces the point that in reality the overall quantum of new homes will be significantly lower than the figure set out within the RLDP’s vision and strategic objectives. In turn this prevent opportunities for new sites to come forward as part of the plan-making process and in doing so hinder the Council’s ability to account for historic unmet need. Collectively this substantiates Barratt Redrow’s position that in order for the plan to be considered sound the Council must accommodate a greater flexible allowance, optimising sites such as Swn Y Coed, Wenvoe, to ensure the emerging local plan complies with the Welsh Government’s aspirations set out within Future Wales.
5.21 As illustrated above, the Council anticipate 1,303 dwellings coming forward in the form of windfall sites. This accounts for both small and large sites which in turn represents around 15% of the Council’s overall housing requirement. Once again, whilst we do not contest the overall windfall provision or the projected delivery rate of 87 dwellings per annum up to 2036. It is important to recognise that based on past trends the annual number of homes which comes forward on windfall sites varies significantly year on year.
5.22 Table 18 of the Development Plan Manual is explicit in that respect and explains that although due regard must be attributed to analysis of past delivery rates, periods of abnormally high or low completions should be considered inappropriate/anomalies when extrapolating future rates of windfall sites. On that basis ensuring the RLDP incorporates a greater flexible allowance will not only provide certainty that any shortfalls/fallow periods are offset but also enable a more consistent supply of homes to be achieved over the plan period as a whole.
5.23 Lastly, in terms of overall growth Paragraph 5.8 of the Deposit Plan states that the level of growth they have identified ‘’has been demonstrated to be deliverable and is sufficiently ambitious to reflect the Vale’s position in the Future Wales national growth area.’’ It also notes that this level of growth has been chosen so that it is ‘’complementary to, rather than competing with, the neighbouring authority of Cardiff and the wider Cardiff Capital Region (CCR).’’.
5.24 Whilst it is agreed that the level of growth may be realistic based on past trends, the claim that this is sufficiently ambitious and needs to be at this level to avoid competing with Cardiff is not substantiated by evidence to suggest that a higher level of growth could not also achieve these principles.
5.25 Cardiff, as the capital city of Wales, also demonstrated historic under delivery when publishing its deposit plan for consultation in February 2025, which was the case for allocated sites as well as generally for annual delivery rates over the adopted plan period. This resulted in a failure to meet targets over the last 10 years of their adopted plan. Whilst Cardiff has made progress in more recent years, the latest Annual Monitoring Report published in October 2025 notes that to date the region has met just 58% of its overall dwelling requirements over the plan period from 2006-2025.
5.26 Accordingly, with Cardiff opting to continue with a medium growth option for their RLDP despite these shortfalls, there is no sound basis to suggest that adopting a higher growth level within the Vale would detrimentally impact upon housing delivery or ‘compete’ with Cardiff.
5.27 In summary, Barratt Redrow acknowledge the overall medium growth strategy, however given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, Barratt Redrow maintain that the proposed RLDP should be more ambitious when it comes to housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
5.28 These steps would help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Overall, we conclude that a higher flexibility allowance and additional site allocations, such as Swn Y Coed, Wenvoe, are necessary to ensure the RLDP is able to effectively meet local need over the plan period. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
Policy SP2 – Settlement Hierarchy
5.29 Policy SP2 highlights that development will be focused with the Strategic Growth Area and that its distribution will be shaped by settlement hierarchy and seeks to direct ‘growth to locations that will provide the greatest opportunities for delivering housing to meet affordable needs, community infrastructure and enhanced sustainable transport provision’.
5.30 Accordingly, despite Wenvoe being identified as a primary settlement, Policy SP2 notes that development in this location will be limited to ‘the efficient and sustainable use of existing buildings, infill opportunities, small-scale affordable housing led schemes, and rural enterprise/ agricultural related developments.’ Similarly, it is noted that Policy SP2 does not consider Wenvoe to be an appropriate location for ‘’substantial additional growth’’.
5.31 Barratt Redrow object to the approach to Primary Settlements as set out under this Policy, as Wenvoe is inherently sustainable and the explanation for discounting it as an area to accommodate growth is considered unjustified.
5.32 First of all, the Deposit Plan acknowledges that it performs a similar function to the Primary Settlements located within the Strategic Growth Area and it is described as one of the ‘sustainable communities’ in The Vale of Glamorgan Key Characteristics section, as noted previously in Section 3.
5.33 Likewise, the site benefits from excellent accessibility the local public transport network, active travel routes and local services. These characteristics fully accord with Welsh Government’s strategic objectives and emphasise the fact that Swn Y Coed constitutes an appropriate location for future housing.
5.34 With regard to Policy SP2 discounting Wenvoe as a location to accommodate growth, this is due to the Vales’s stance that the settlement is ‘’significantly limited by the presence of Best and Most Versatile (BMV) agricultural land on the edge’’. Barratt Redrow do not consider this to be sufficient justification to discount the site from allocation as there would be limited impact on BMW agricultural land arising from the development of Swn Y Coed.




5.35 For example, as set out in the ALC report prepared by Kernon CCL and provided as part of the Candidate Submission Ref 437, the highest grade on site would be Subgrade 3a, with the site comprising a mix of Subgrades 3a and 3b. This means that in National Policy terms, development of the site would be in accordance with paragraph 3.59 of PPW 12 as the lowest grade available.
5.36 Furthermore, any perceived harm in terms of agricultural land is not considered to outweigh the benefits brought by the development in terms of contributing to both affordable and market housing need over the plan period, not least given the historic shortfalls identified earlier in this submission.
Policy SP4 - Placemaking
5.37 Policy SP4 is recognised as a key Policy in the emerging RLDP to ensure that new proposals align with existing communities and placemaking principles across the county.
5.38 Policy SP4 also requires all major development to provide a ‘Placemaking Statement’. It should be made clear in the Policy, as per Paragraph 6.34 of the Deposit Plan, that this is not expected to be a standalone statement, but will form part of a Design and Access Statement. We recommend the policy is amended as follows:
5.39 Nonetheless, the development of Swn Y Coed is considered to coincide with the objectives of Policy SP4, where the illustrative masterplan submitted as part of previous representations demonstrates its capability to deliver a range of housing types and tenures, whilst integrating key green infrastructure features.
5.40 Local services and facilities are also accessible from this location, tying in with criteria 7, and supports public transport use (as per criteria 4) given the close proximity to a frequent bus route.
5.41 Likewise, the quantum of units proposed demonstrates efficient use of the land based on the net developable area and site constraints in line with emerging Polic PGD2.
5.42 In principle Barratt Redrow supports Policy SP4 and the aim of ensuring all new development is of high-quality sustainable design.
Policy PGD1 – Creating Well Designed and Inclusive Places
5.43 Barratt Redrow question the need for both Policies SP4 and PGD1 as there is repetition. In principle the criteria as set out is as to be expected, however there is a need to recognise that not all criteria can always be accommodated on development sites. There are other environmental and economic factors need to be considered. However, if Policy PGD1 remains, then the text needs to be updated to suggest a site by site basis rather than the current blanket approach suggested.
Policy PGD2 – Residential Development Densities
5.44 Residential densities are supported as a principle, however, should not be so prescriptive as to unnecessarily restrict development. Policy PGD2 outlines that residential development over 0.5ha will be permitted where the residential density is a minimum of 35 dwellings per net hectare within Key, Service Centre and Primary Settlements and 30 dwellings per net hectare in Minor Rural Settlements.
5.45 A minor point in relation to the policy wording is the ‘dwellings per net hectare’ and the removal of non-developable space in any calculations. Whilst this is normal, the increased requirements relating to SAB, green infrastructure requirements and increased ecological mitigation all have a direct impact on the remaining available land and it is positive to see there is an allowance for some flexibility.
5.46 The density requirement appears to be reasonable in approach, and the flexibility to allow individual site adjustments (as per the remaining text within the Policy) is supported. There will be occasions where the density will need to be considered due to other on-site factors.
5.47 Policy SP5 is supported in principle insofar as it seeks to promote healthier and more inclusive places, consistent with the objectives of Planning Policy Wales and the Well-being of Future Generations (Wales) Act 2015. However, to ensure the policy is robust and effective, it is important that it is supported by an up-to-date and clearly evidenced policy framework. In this regard, the supporting evidence base, particularly BP36 – Planning Healthy Places (June 2024), should be reviewed to ensure that the datasets referenced reflect the most recent available information. For example, life expectancy data currently cited (2018–2020) and indicators based on the Welsh Index of Multiple Deprivation 2019 should be updated where possible to reflect the most recent datasets, including the Welsh Index of Multiple Deprivation 2025 and any updated public health, active travel, air quality and demographic data. Ensuring that the evidence base reflects the latest available information is necessary to demonstrate that the policy is justified and based on an accurate understanding of local health conditions and inequalities.
5.48 The policy framework should also be updated to reflect the Health Impact Assessment (Wales) Regulations 2025, which were approved by the Senedd in November 2025 and will come into force on 6 April 2027. At present, these forthcoming statutory requirements are not referenced within Policy SP5 or the supporting guidance. Given that the regulations will establish a statutory framework for the preparation of Health Impact Assessments in Wales, it will be important for the RLDP and supporting documents to clarify how the policy’s screening, checklist and Rapid HIA requirements will interact with the statutory regime once implemented. Including reference to the regulations would help ensure that the policy remains aligned with national legislation and is future-proofed over the plan period.
5.49 The supporting Rapid Participatory HIA of the Deposit RLDP (BP3, September 2025) provides useful background regarding the Council’s engagement with stakeholders in preparing the plan. However, it would be beneficial for the Council to clearly explain how the findings of that work have informed the specific requirements contained within Policy SP5. Providing a clearer link between the outcomes of the participatory HIA and the policy approach adopted in the RLDP would improve transparency and demonstrate that the policy has been shaped by the evidence gathered through the stakeholder engagement process.


Policy SP5 - Creating Healthy and Inclusive Places and Spaces


5.50 The emerging Health Placemaking Supplementary Planning Guidance (SPG) is broadly welcomed as a practical tool to support implementation of the policy. Nevertheless, a number of matters require further clarification prior to its adoption. In particular, whilst the SPG provides greater clarity regarding the use of the Healthy Placemaking Checklist and Rapid HIAs, it does not clearly identify the circumstances in which a comprehensive (full) HIA would be required. The SPG should also be updated to reflect forthcoming guidance from the Welsh Health Impact Assessment Support Unit (WHIASU) expected in 2026, and ensure alignment with other relevant policies and guidance, including those relating to design, travel plans, public transport accessibility and open space provision. Given the number of cross-references within the SPG, it will be important that these documents are fully aligned and consistent.
5.51 Finally, any requirement for a Health Impact Assessment should be applied on a proportionate basis, reflecting the scale, nature and likely impacts of the development proposed. The policy should therefore make clear that the scope and level of detail required for HIAs will be proportionate to the scale and type of development. Subject to these amendments and clarifications, the policy would provide a clearer and more effective framework for integrating health considerations into the planning process.
5.52 Please refer to Policy SP1 as written response also accounts for information proposed under this particular policy.


Policy SP6 – Housing Requirements
Policy HG1 – Housing Allocations
Policy HG1 (B) – Housing Allocations
• HG1 (3) Barry - Land at Hayes Lane 5.53 Barratt Redrow question the suitability of allocating residential development on the site known as Land at Hayes Lane, The Bendricks. These concerns are centred on the following:
• 5.54 Whilst the site is technically identified within the settlement boundary, it is clearly not a sustainable location for residential development. This is evident by virtue of the fact that Land at Hayes Lane is situated within an existing industrial estate and lacks any supporting facilities. The former reinforces the principle that as a whole the area is characterised by a mix of light industrial and heavy industrial uses which naturally conflicts with the prospect of future residential housing. Moreover, it is reasonable to assume vehicles using the local highway network will be larger in nature (such as HGV’s) and given the majority of streets do not contain dedicated pedestrian footpaths/ cycleways, this raises concerns from a highway safety perspective.
• 5.55 Although we note the Transport Statement from AECOM suggests access can theoretically be achieved to Barry and Sully. Both of these settlements remain over 2km from the site and lie outside of the distances deemed acceptable by Transport for Wales (TfW) to support resident development.


Unsustainable Location & Poor Connectivity Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.56 Allocating housing on Land at Hayes Lane which therefore does not comply with such criteria would clearly undermine the Council’s objective of pursuing a Transport Orientated Growth approach and by virtue of which risk promoting an unsustainable pattern of development within the emerging RLDP.
• 5.57 As outlined above given the nature of the area there are almost no existing active travel routes in this part of the region. This lack of provision would ultimately lead to future residents using alterative options and many of which would require residents to overcome physical barriers in order to travel in a more sustainable manner. For instance, due to the level of infrastructure associated with the port, the site is effectively detached from the main urban area of Barry and would involve crossing an active railway line halfway along Wimborne Road without sufficient mitigation measures in place. On the other hand, whilst Hayes Road extends further west towards Sully, it follows the southern boundary of the Polaris Industrial Estate which contains various access points that are in regular use throughout the day. Collectively these characteristics would prevent future occupants travelling in a more active manner which is in direct conflict with both local and national planning policy objectives.
• 5.58 The site’s geographic isolation means that access to modes of public transport are extremely limited. Most notably that includes railway stations with the nearest being Cadoxton Station which is located circa 3.8km north of the site. By AECOM’s own accord this is considered to equate to a minimum walking distance of 52 minutes which exceeds TFW’s standards for residential development. Again, this reinforces the fact future residents would be overly reliant on private vehicles to access local services (such as employment opportunities, schools, doctor surgeries etc) which in turn shall achieve an unsustainable pattern of growth and increase associated carbon emissions.
• 5.59 Crucially, the site remains allocated in the adopted LDP for B1/B8 employment uses. These intended to facilitate small industrial and workshop units as part of the Atlantic Trading Estate’s expansion and in turn support opportunities for local businesses/ enterprise ventures. The council’s latest Employment Land Review confirms a clear demand for such uses in Barry, with Land at Hayes Lane representing the most logical location for further growth. Reallocating this land for housing would therefore diminish the Vale of Glamorgan’s ability to attract sufficient economic investment to support the requisite levels of growth over the emerging plan period, and potentially displace businesses to other less suitable parts of the region which would not be in the interests of good placemaking as per PPW12.
• 5.60 Although the RLDP’s evidence base suggests there are other development opportunities within the region that could compensate for the proposed loss of employment land. Upon further review it is apparent these are in less favourable locations from both a strategic and operational standpoint. Reassigning Land at Hayes Lane from employment to residential would therefore undermine the Council’s objective of safeguarding existing employment land and prioritising business/ industrial uses in area’s well served by infrastructure designed to accommodate such activities (such as Barry Docks). Furthermore, it would also set a precedent for other potential losses and in doing so impact the Council’s ability to meet the region’s employment needs up to 2036.


Loss of Allocated Employment Land Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.61 By virtue of the above, Barratt Redrow object to the proposed allocation of residential development on Land at Hayes Lane. The principle of which is in direct conflict with the Welsh Government’s objectives set out within PPW12 & Future Wales: The National Plan 2040 and the need to ensure existing employment land is suitably protected. The latter is crucial in attracting future investment to the region and shall act as a catalyst to enable housing to be delivered elsewhere, in more sustainable locations better connected to local services/ facilities, such as Wenvoe.
• 5.62 Whilst we do not oppose the overall principle of residential development at Site C (Central Parcel), this position must be considered in the context of the wider allocation. Applications for Sites A and B (2020/00351/OUT (Site A) & 2020/00352/OUT (Site B)) are currently pending subject to respective Section 106 Agreements, with prolonged negotiations resulting in significant delays to delivery. This experience clearly demonstrates that development within this allocation is complex and subject to extended viability and legal discussions, which inevitably impacts the rate at housing is able to come forward.
• 5.63 According to the Council’s register we understand Site C has not been subject to any formal planning application, and therefore there is no detailed evidence available regarding the proposed layout design, infrastructure requirements, viability, or anticipated submission and determination timeframes. Despite this, the Council’s housing trajectory assumes development commencing in 2028/29, with 35 units initially and 45 units annually thereafter. Given the absence of a live application and the precedent of delays on Sites A and B, these delivery assumptions appear overly optimistic based on current evidence.
• 5.64 On that basis we maintain that the Council should reassess the trajectory assumptions for this particular site and identify other alternatives to help account for any unforeseen slippage on Site C. The provision of Swn Y Coed, Wenvoe represents an ideal opportunity to absorb the fallout in terms of housing numbers whilst ensuring the RLDP incorporates sufficient flexibility to consistently meet housing need over the entire plan period.
• 5.65 Although we do not necessarily dispute this sites progression, given Wates have submitted a full planning application (Ref 2024/01152/FUL) which is currently under consideration.
• 5.66 It is important to recognise that, according to the Council’s online planning register, two substantive consultation concerns remain outstanding. Firstly, the Highways response raises fundamental layout issues; and secondly, the Ecology department maintains a holding objection on the basis of insufficient supporting evidence. To date we understand both matters remain unresolved and may well require extensive design amendments, additional technical work, and potentially further consultation before the application can ultimately be determined.
• 5.67 In the absence of confirmed solutions to these issues, there remains uncertainty regarding the timeframe for determining the planning permission. Furthermore, even if consent is secured, there will be a need to discharge conditions and address any pre-commencement requirements, which will inevitably impact the lead-in time before development gets underway.


• HG1 (5) Llantwit Major - Land between the Northern Access Road and Eglwys Brewis Road (Site C – Central Parcel)
• HG1 (7) St Athan - Former Stadium Site, adjacent to Burley Place
Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.68 Given these outstanding matters, the assumption that development will commence in 2027/28 appears optimistic at this stage. Delivery timescales may be extended depending on the scale of amendments required and the duration of condition discharge processes. With this in mind, we believe it is prudent for the emerging RLDP to identify a broader and more diverse portfolio of site allocations to support housing delivery earlier on in the plan period. Ensuring flexibility through additional deliverable sites (such as Swn Y Coed) will reduce the Council’s overreliance on sites such as this one and provide greater certainty in maintaining a more consistent supply of homes over the plan period irrespective of potential delays that may arise on this site.
• 5.69 Whilst we understand that the proposed developer, Edenstone Homes, has recently engaged with the Council through its pre-application service. According to the Council’s planning register, no formal planning application has been submitted to date. As such, there remains no confirmed development proposal, agreed technical evidence base, or indicative determination timeframe associated with the allocation.
• 5.70 In the absence of a live application, there is a considerable degree of uncertainty surrounding the anticipated delivery programme. The housing trajectory assumes development commencing in 2027/28; however, this appears optimistic given that an application has yet to be submitted, validated or determined. Even following any grant of planning permission, there would be a requirement to discharge pre-commencement conditions and satisfy any relevant planning obligations before development could lawfully begin. From experience these processes can be time-consuming and may result in significant delays with regards to lead-in times prior to first completions.
• 5.71 Given this uncertainty, reliance on the site to deliver within the early phases of the plan period carries risk. It is therefore important that the emerging RLDP identifies a broader and more diverse portfolio of deliverable site allocations to support housing delivery, particularly in the earlier years of the plan. Incorporating additional sites with stronger prospects of short-term delivery will provide flexibility, resilience, and greater confidence in maintaining a robust housing land supply should delays arise on this allocation.
• 5.72 Barratt Redrow acknowledges the Council’s position in respect of Site HG3 (1) – Former Eagleswell Primary School, including the temporary five-year consent (2024–2029) for 90 units of short-term accommodation and their inclusion within housing completions for monitoring purposes.
• 5.73 Given their expressly temporary nature and planned relocation to other sites within the Vale by 2029, it is essential that these units are not double counted in a way. As the risk of doing so would artificially inflate the Vale’s housing numbers, thereby preventing delivery opportunities elsewhere over the plan period.
• 5.74 Although Barratt Redrow welcome the clarification provided at paragraph 6.111 which states that once the temporary units are removed and the site is redeveloped for permanent accommodation, any future dwellings will not be included within the RLDPs housing supply


• HG1 (8) St Athan - Clive Road, St Athan

Policy HG3 – Housing Led Redevelopment Opportunity Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• figures. In the interest of soundness, we believe this should explicitly set out within the proposed wording of Policy HG3 to avoid any potential ambiguity and thus ensure no additional net housing contributions will arise from the site upon its redevelopment later down the line.
• 5.75 This approach is critical given the Vale’s substantial existing landbank and the number of allocations being rolled forward, as cumulatively factoring in additional units from this site would further constrain opportunities to accommodate genuine growth elsewhere. Thereby limiting the Council’s ability to effectively meet local housing need up to 2036.
• 5.76 In principle, Barratt Redrow support Policy SP7’s objective to secure a minimum of 3,070 affordable homes over the plan period. That said, given the level of affordable housing is directly proportionate to the total housing provision within RLDP we believe there is scope for further uplifts in that respect.
• 5.77 As mentioned above Barratt Redrow maintain that there is sufficient evidence to justify increasing the proposed housing requirements through the Vale’s flexibility allowance in order to maximise opportunities for growth. In turn this would prevent artificially capping affordable housing provision at 3,070 homes to ensure the plan is positively prepared by incorporating measures that proactively address demand across the region.
• 5.78 National policy clearly supports this approach. Planning Policy Wales requires development plans to be positively prepared and to maximise the delivery of affordable housing as a key component of sustainable placemaking. The Development Plan Manual reinforces the need for plans to be aspirational, evidence-led and sufficiently flexible to ensure delivery. Furthermore, the Welsh Government 2025-based estimates of additional housing need report highlights the need for a step change in affordable housing delivery across Wales, recognising that continuation of past trends will not address the current affordability challenges. Collectively, this provides a clear direction of travel in that it’s imperative to uplift housing provision where affordability pressures are acute such as the Vale of Glamorgan.
• 5.79 To ensure the RLDP is sound, the Council should increase the overall housing requirement by apply a meaningful flexibility allowance that ensure sufficient contingency measures are in place to consistently meet local need over the plan period. This would directly increase the quantum of affordable housing secured through policy mechanisms, thereby aligning the Plan with national policy objectives. The latter goes to the heart of the tests of soundness within the Development Plan Manual in ensuring the plan is not only appropriate but capable of delivering the step change required to address affordable housing needs up to 2036.
• 5.80 Similarly, it is considered that Policy SP7 should be updated to allow flexibility and avoid the risk of contradicting Policy SP8. At present the blanket approach to affordable provision does not allow for site-specific delivery or viability requirements which may arise and as such, the amplification text should also include a note similar to the following:


Policy SP7 – Affordable Housing Provision
‘Where the target affordable housing percentage is considered unviable due to physical, financial, or other constraints, sites will be reviewed on an individual basis following submission of a detailed viability assessment and any supporting evidence as necessary’. Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.81 Barratt Redrow supports the position that residential development should help meet affordable housing need. Although to ensure Policy SP8 is effective its important the percentage requirements and site thresholds proposed must be viable across a range of site types and market areas to ensure they do not inadvertently suppress delivery.
• 5.82 On that basis we believe it would be prudent for the Deposit Plan to clarify that affordable housing targets are subject to site-specific viability considerations and can be adjusted in circumstances where comply with such parameters would render the sites viable and thus prevent delivery. Greater flexibility is also needed in tenure and mix to better reflect evolving local needs over the entire plan period including the point when planning applications are formally submitted. This would help ensure that the approach is consistent with paragraph 4.2.32 of PPW 12 which suggests that ‘site specific targets are indicative affordable housing targets which should be established for each residential site…’.
• 5.83 As noted above, the blanket approach to affordable housing requirements based on the Council’s latest needs evidence does not have due consideration for the event of unique technical complexities that many sites could face, nor viability considerations which may affect delivery, particularly early on in the plan period. As such, re-wording of the policy text to allow for sites to be reviewed on an individual basis where such circumstances apply is considered necessary for soundness.
• 5.84 Barratt Redrow support the overall objective of Policy SP10 in seeking to promote sustainable transport, increase active travel opportunities and reduce reliance on the private car in accordance with national placemaking objectives. Encouraging development in accessible locations such as Wenvoe and enhancing connectivity between settlements is welcomed. However, for soundness its important the policy recognises the different physical characteristics across the Vale of Glamorgan, particularly in edge-of-settlement and rural contexts where flexibility is necessary to ensure sustainable growth is not unduly constrained.
• 5.85 In this regard, the Swn Y Coed, Wenvoe site (Ref 437) represents a sustainable and deliverable opportunity that aligns fully with the objectives of Policy SP10.
• 5.86 The Candidate Site submission was accompanied by a Technical Note prepared by Lime Transport. Seen as the site abuts the defined urban area of Wenvoe it represents a logical extension to the existing settlement and is well served by a range of local amenities and public transport. In terms of the latter the nearest bus stop is located within 100 meters of the site whilst the majority of local amenities are situated within 1.2 kilometres walking distance. Together these factors naturally promote the principle of linked trips which fully accords with the Chartered Institution of Highways and Transportations (CIHT) guidelines and reinforces the fact the site is a sustainable location for residential development.
• 5.87 As shown within the latest illustrative masterplan the proposed site will be served by a new junction off Old Port Road. This is confirmed as being the most appropriate arrangement from a highway safety perspective and would be supported by other technical analysis to demonstrate that sufficient visibility can be achieved on to the road for all potential users.


Policy SP8 – Affordable Housing Requirements
Policy SP10 – Sustainable Transport Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.88 The accompanying Transport Assessment also demonstrates that there is sufficient capacity within the local highway network to accommodate the projected level of demand associated with this level of development. Where necessary, any future scheme would also facilitate other improvements which may well include widening the highway along Old Port Road and/ or Walston Road to accommodate two-way traffic and providing a dedicated pedestrian/ cycle junction to connect on to the existing active travel route which leads into the centre of Wenvoe. The existing field access would also be blocked up to create a more cohesive layout. However as shown within the latest masterplan the existing public right of way which crosses the site shall be retained and enhanced to promote better pedestrian connectivity throughout the local area.
• 5.89 In terms of active travel, dedicated pedestrian footpaths and cycleways will be incorporated throughout the scheme before filtering into the surrounding area. The site is also situated within an area which benefits from good access on to existing active travel routes and a number of which have also been identified for further improvements which reinforces the schemes sustainability. These principles fully accord with the relevant placemaking objectives set out within the National Plan 2040 and PPW12, and demonstrates that safe and suitable access can be achieved for all users.
• 5.90 Subject to proportionate application of Policy SP10 and recognition of the robust mitigation proposed, the site clearly supports and advances the sustainable transport objectives of the emerging RLDP.
• 5.91 Barratt Redrow object to Policy CC1 on the basis that it duplicates and potentially exceeds Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework. Introducing a separate and more onerous operational net zero requirement at the local level risks imposing additional cost and complexity that undermines site viability and deliverability. The Development Plans Manual for Wales is clear that development plans must avoid repeating national policy and should not introduce requirements that are more appropriately addressed through other regulatory regimes. In this respect, Policy CC1 conflicts with the principle that plans should be clear, proportionate and not duplicate national controls, raising concerns under the tests of soundness relating to coherence and consistency with national policy (Test 2) and whether the plan is justified (Test 3).
• 5.92 The proposed step change in standards from 1 April 2030 — particularly the reduction in space heating demand from 40 kWh/m²/year to 15 kWh/m²/year — represents a significant and abrupt escalation in performance expectations. Whilst reference is made to initiatives such as Tai ar y Cyd and AECB CarbonLite, these have largely been associated with grant-funded affordable housing schemes. There is no clear evidence that equivalent standards can be viably delivered across mainstream private housing schemes without public subsidy. The Development Plans Manual requires policies to be underpinned by robust evidence and deliverable over the plan period. In the absence of clear viability evidence across different site typologies and market conditions, the policy fails to demonstrate that it is justified and effective (Tests 3 and 4).


Policy CC1 - Residential Operational Net Zero Carbon Development Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.93 Policy CC1 also risks creating fragmented energy performance standards across different Local Planning Authorities in Wales. This undermines the benefit of a consistent national approach through Building Regulations and makes it more difficult for volume housebuilders operating across multiple authority areas to deliver homes efficiently at scale. The Manual emphasises that development plans should facilitate delivery and avoid unnecessary complexity. By introducing bespoke operational monitoring requirements, energy modelling thresholds and potential financial offset mechanisms, the policy blurs the boundary between planning and Building Control functions. This raises concerns as to whether the policy is effective and capable of consistent implementation (Test 4).Finally, the Council’s own Viability Assessment (BP42, paragraph 6.60) acknowledges uncertainty pending Welsh Government’s consultation outcome and suggests that, if national regulation progresses, it may be more appropriate for such matters to be addressed through Building Control rather than planning policy. This reinforces the concern that Policy CC1 is premature and may quickly become misaligned with national policy. As drafted, the policy risks undermining housing supply, affordable housing delivery and overall plan implementation. For these reasons, it fails to satisfy the tests of soundness in respect of coherence with national policy, justification and effectiveness, and should be deleted or fundamentally amended to align fully with the national regulatory framework.
• 5.94 Alternatively, if Policy CC1 is kept in the RLDP, there must be some flexibility introduced for the requirements of Policy CC1 to fall away should Building Regulations catch up or exceed or require different provisions than the requirements of Policy CC1 during the lifetime of the RLDP. To not provide this flexibility would mean that the ability of the RLDP to deliver the new homes in VoG needs could be compromised. Clarification is also required on how the contribution to the Council’s Project Zero fund is to be calculated and whether the timeframes in Policy CC1 relate to the date of planning approval.
• 5.95 Furthermore, the demands of Policy CC1 have to be considered in the context of all of the other demands that impact on development viability (e.g. affordable housing). The Council must provide evidence that an assessment has been undertaken to demonstrate that development, specifically the housing allocations in Policy HG1, can bear the cumulative policy costs of the RLDP, including Policy CC1.
• 5.96 The policy wording should be amended so that the performance requirements apply based on the date of planning permission rather than the RLDP adoption date. Changes in energy performance requirements can significantly affect site layout, building orientation, and design considerations. Without this amendment, approved schemes could unnecessarily require variations via Section 73 or Non Material Amendment applications.
• 5.97 As such, Policy CC1 should be amended to ensure that it is precise, measurable and enforceable and achieves the three tests of soundness. The proposed amended wording is as follows:


Developments that secure a planning permission from RLDP adoption to 31st March 2030 will be required to meet the following criteria:
i. Space heating demand less than or equal to 40kWh/m2/year;
ii. Energy use intensity less than or equal to 75kWh/m2/year; and Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.98 Barratt Redrow do not consider that Policy SP13 – Community Infrastructure and Planning Obligations is required. This is predicated on the basis that such matters are dealt with under separate legislative and policy frameworks. Therefore, as currently drafted the proposed policy (and supporting text) do not add anything further information for planning purposes and risk unnecessary duplication.
• 5.99 Whilst there are no comments regarding the principle, thresholds and use of the FIT standards in terms of the open space provision, Barratt Redrow do question the requirement for an Open Space Strategy for all sites that meet the thresholds.
• 5.100 The requirement within emerging Policy CI1 for applicants to prepare or submit an Open Space Strategy is not considered to be sufficiently justified or proportionate when assessed against Planning Policy Wales, which promotes access to open space and recreational provision but does not prescribe the preparation of standalone Open Space Strategies for individual planning applications. There is a lack of clarification as to what it proposed and also how the level of detail would be proportional to the size of the site, which would be addressed comprehensively in a DAS or Green Infrastructure Statement in any event.
• 5.101 Furthermore, the proposed 62.2 m² per dwelling requirement is overly prescriptive and not aligned with FiT’s methodology, which is per person and intended to be applied strategically across different open space typologies, not as a uniform per dwelling metric. FiT’s approach emphasises flexibility, multifunctionality and local context, meaning that applying a rigid per dwelling standard oversimplifies the guidance and risks generating disproportionate land take and unnecessary design constraints. When combined with the wider cumulative policy burdens of the RLDP, such an approach has the potential to impact development viability and reduce delivery.
• 5.102 In principle Barratt Redrow support the aim of this policy in ensuring proposed development incorporate measures that protect and enhance green infrastructure provision.
• 5.103 For completeness Swn Y Coed, Wenvoe exhibits a landscape led design that sensitively responds to its existing features, and provides an attractive, landscaped and high-quality public realm throughout. A number of priority habitats including a network of hedgerows have been retained throughout. Extensive landscape buffers and a continued natural edge will be provided to the site to accommodate root protection zones of existing trees and hedgerows which visually screen the development from adjacent uses. Moreover, a dedicated area of Public Open Space and Local Equipped Area of Play (LEAP) is proposed to the south of the site.


Developments that secure a planning permission from 1st April 2030 onwards will require:
i. Space heating demand less than or equal to 15kWh/m2/year;
ii. Energy use intensity less than or equal to 40kWh/m2/year; and
Policy SP13 - Community Infrastructure and Planning Obligations
Policy CI1 – Open Space Provision
Policy SP19 – Green Infrastructure Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.104 Barratt Redrow object to the continued inclusion of Swn Y Coed within the Dyffryn Basin & Ridge Slopes - 5 Special Landscape Area (SLA) under Policy DNP1.
• 5.105 As highlighted in Background Paper BP28 – Special Landscape Areas, Paragraph 1.8, the Council considers that the SLA as defined in the 2008 ‘Designation of Special Landscape Areas - Final Report’ remain relevant, up-to-date, and based on current best practise and have therefore not undertake a review of the report to inform the emerging Replacement Local Development Plan (RLDP).
• 5.106 Whilst the Authority have not sufficiently updated their evidence base, the site was subject to a detailed review as part of the Candidate Site submission by Soltys Brewester Landscape which highlighted that the site is located on the edge of land subject to Dyffryn Basin and Ridge Slopes SLA. This designation is ‘underpinned’ by LANDMAP Areas St Nicholas and Bonvilston Ridge Slopes, (VLFGLVS614) and St Nicholas and Bonvilston Ridge Crest (VLFGLVS271), both evaluated as High.
• 5.107 However, the vast majority of the designated land will fall outside the visual envelope for the Swn Y Coed site and there will be no change to the key characteristics of the SLA or the LANDMAP areas to the west or to the north of the site boundary.
• 5.108 A noted characteristic of the SLA relates to the prominence of the sloping edge, (i.e. St Nicholas and Bonvilston Ridge Slopes, (VLFGLVS614), within views from Wenvoe Valley to the east. The visual appraisal establishes that site development has the potential to partially change the appearance of this edge within available views.
• 5.109 However, opportunities for GI provision within the site including retention and enhancement of the existing boundary hedges and trees which has the potential to minimise any visible change. Furthermore, as illustrated on the submitted masterplan, the existing hedges and field pattern within and around the site will be key structural elements guiding and sub-dividing the development form.
• 5.110 When considered in the context of the extensively wooded nature of the slopes visible to the east, any visible change to valley slope characteristics is likely to be very marginal and visually insignificant within the study area.
• 5.111 Moreover, the illustrative masterplan includes measures that will assist with GI mitigation and enhancement, including SUDs features, accessible landscape buffers and green spaces.
• 5.112 Therefore, it was concluded that from a landscape and visual perspective the site has the ability to suitably incorporate residential development and include GI enhancements, to assist with its visual integration, as a visually appropriate extension to Wenvoe, and should be removed from the Dyffryn Basin & Ridge Slopes - 5 Special Landscape Area under Policy DNP1.


Policy DNP1 - Special Landscape Areas Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.113 Barratt Redrow object to the site at Swn Y Coed, Wenvoe still forming part of Green Wedge 3 - North of Wenvoe within Policy DNP2, which seeks to prevent coalescence between the western edge of Cardiff and Wenvoe.
• 5.114 Barratt Redrow have reviewed BP27 Green Wedges and consider that the assessment under NW2 does not consider nor reference the fact that the site at Swn Y Coed relates to the context of built development at Wenvoe and is very well-contained by both mature woodland and landform and possesses strong intervisibility with the northern edge of Wenvoe. Instead, BP27 looks to discuss the southern boundary of Culverhouse Cross and the association with the wider countryside.
• 5.115 As previously states Barratt Redrow consider that the site boundaries are well-defined and would provide a strong established ‘defensible’ limit to development. The topography connects with the main settlement to the extent that any new development would appear well connected to the existing settlement, physically and visually. This is a similar situation to the adjoining former Wenvoe Quarry and Vale of Glamorgan Council Depot which are considered to be ‘largely shielded from view by woodland blocks/strips’.
• 5.116 Furthermore, the existing dispersed housing and the hotel/pub along Old Port Road also provide some precedent for ‘infilling’ the site. Proposed development should seek to reflect the low density, height and well-treed character of Wenvoe to help ensure it has a coherent and visually connected relationship. GI mitigation and enhancement benefits likely to result from the site development, including placemaking, value or integration in relation to landscape and visual considerations.
• 5.117 The proposed development of the small area of the Green Wedge would not undermine the principles and would still prevent the coalescence of Wenvoe with Cardiff by maintaining a minimum 0.7km separation and would not significantly impact upon the openness of land.
• 5.118 Moreover, the illustrative masterplan provided as part of Candidate Site 437 includes measures that will assist with GI mitigation and enhancement, including SUDs features, accessible landscape buffers and green spaces. Further recommendations to maximise opportunities to reinforce GI, including placemaking, value or integration are outlined below:
• 5.119 Overall, Barratt Redrow maintain their objection to the inclusion of the Swn Y Coed site within Green Wedge 3 - North of Wenvoe under Policy DNP2. From a landscape and visual


Policy DNP2 – Green Wedges
• Retention, management and strengthening of structural green corridors and boundaries to the site, including the overgrown hedges and trees;
• More visible areas on elevated sections of the site should include a higher proportion of trees, including gardens and street trees and woodland to more visually integrate the development when viewed from the Wenvoe Valley to the east; and
• Footpath corridors through the site could be integrated with the development through appropriate hedge and garden vegetation to ensure attractive recreational corridors are provided. Similarly informal routes around the perimeter could continue to offer amenity value through sympathetic boundary treatments and informal planting.
Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• perspective, the site has the ability to suitably incorporate residential development and include GI enhancements, to assist with its visual integration, as a visually appropriate extension to Wenvoe. Moreover, the development of the site immediately adjoining the existing settlement boundary at Wenvoe would not detract from the purpose of the wider Green Wedge.
• 5.120 Policy DNP8 seeks to address recreational pressure on the Severn Estuary Special Area of Conservation, Special Protection Area and Ramsar Site. Whilst Barratt Redrow appreciate the overarching purpose in its current form the proposed policy lacks sufficient supporting information explaining how it will operate in practice. The supporting text suggests that key details relating to mitigation delivery, including mechanisms such as Suitable Alternative Natural Greenspace and wider access management measures, will be set out in future Supplementary Planning Guidance. Deferring these important details until later down the line creates uncertainty at the plan-making stage and makes it difficult to assess whether the policy is sound, effective and/ or capable of being implemented on a consistent basis.
• 5.121 The policy also provides no clear threshold or criteria for determining what level of activity would constitute “visitor pressure” or an “adverse impact” on the integrity of the designated sites. Similarly, the evidence demonstrating what level of impact residents moving into new homes across the Vale of Glamorgan will generate additional recreational pressure on the Severn Estuary does not appear to have been quantified to date. While a 12.6 km recreational catchment is referenced (in which Swn Y Coed, Wenvoe would technically sit within), the supporting text does not clearly explain the evidence or methodology underpinning this distance. Moreover, the proposed text also fails to set out how new residential development will be assessed in terms of measurable impacts on the European site and thus the scope of mitigation that would subsequently be required.
• 5.122 From a practical standpoint this level of uncertainty is concerning given the implication of this policy are unable to be fully assessed due to the lack of evidence. For instance, if development sites within the catchment are expected to contribute financially towards mitigation measures, then the scale and mechanism of those contributions must be clearly established as part of the plan-making process. Without this clarity, there is a risk that Policy DNP8 could introduce unforeseen costs and extensive time delays, potentially affecting the viability and overall deliverability of proposed housing sites. The cumulative impact of which would then undermining the plan’s ability to meet its housing requirements and risk finding the RLDP unsound.
• 5.123 Barratt Redrow understand the need for a sustainable provision of minerals, as per Policy SP18, however object to the continued inclusion of Swn Y Coed, Wenvoe within an area that is designated as a Category 1 Limestone mineral resource. The site should not be safeguarded from permanent development as detailed in response to Policy MIN1.


Policy DNP8 – Severn Estuary Recreational Pressure
SP18 - Sustainable Provision of Minerals Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 5.124 Barratt Redrow object to the continued inclusion of the land at Swn Y Coed as a Category 1 Limestone mineral resource safeguarding area.
• 5.125 A Mineral Resource Assessment, undertaken by Wardell Armstrong, was provided as part of the Candidate Site Assessment and considered the proposed development against the four criteria of Policy MG 22 of the current Adopted Local Development Plan and National Policy. Those criteria are carried forward into Policy MIN1 and the following conclusions are reiterated:
• 5.126 As the resource is constrained by sensitive development any prior extraction would have an unacceptable impact on environmental and amenity considerations.
• 5.127 Limestone extraction has the potential to give rise to unacceptable impact to the immediate residential properties and would be wholly inappropriate.
• 5.128 The extraction of limestone resources beneath the Site has the potential to have an unacceptable impact upon:


MIN1 - Development in Minerals Safeguarding Areas
• Criterion 1: Prior extraction of economic minerals prior to development
• Criterion 2: Demonstrating extraction would have unacceptable impact

a) Ambient noise levels,
b) Air quality,
c) Ground vibration and air overpressure from blasting,
d) Limited site access/egress onto the Old Port Road would be problematic, and
e) Increased traffic generation by HGVs.
• Criterion 3: Development would have no significant impact on the possible working of the resource by reason of its nature or size 5.129 Development would not have significant impact on mineral resources

• Criterion 4: Poor quality resource 5.130 The quality and quantity of the mineral resources have not been assessed given the resource is already constrained by sensitive development and any testing or extraction would not be viable nor possible.
• 5.131 As already demonstrated the Category 1 resources cannot be extracted under Criteria 1 and 2 (due to the impact upon amenity) and the proposed residential development would not have a significant impact upon the wider mineral resource (Criterion 3).
• 5.132 Therefore, it is considered unnecessary to undertake site investigations by boreholes and trial pits to determine the ratio of overburden to mineral resource, mineral quality and estimation of the gross mineral resource affected by the proposed development.
• 5.133 Overall, Barratt Redrow consider that the presence of the mineral resource does not preclude the allocation and development of the site as any extraction does not accord with the criteria

Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• requirements in MIN1. Therefore, the site at Swn Y Coed should be removed from the safeguarding area.
• 5.134 Barratt Redrow acknowledge the need to retain buildings in some circumstances, however consider that the wording of Policy CC2 is overly restrictive in the sense that a presumption against demolition could impact upon delivery timescales for sites, particularly those including farm buildings.
• 5.135 Accordingly, it is considered necessary to re-word the policy to allow for the demolition of buildings where they are no longer used or needed in the event that a site is proposed to be developed for residential purposes, to assist in meeting the housing need over the plan period.
• 5.136 An additional point should be added to the list of 4 criteria, to note that demolition will be acceptable where it is demonstrated that ‘The existing building occupies a minority portion of the site, and to not demolish the building would prevent and/or restrict the delivery of the wider land for the provision of housing’.


CC2 – Presumption Against Demolition Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


• 6.1 In summary, Barratt Redrow, remain committed to the development opportunities at ‘Swn Y Coed, Wenvoe’. By virtue of its location the site represents a sustainable extension to the existing settlement of Wenvoe, and we maintain that its inclusion within the emerging RLDP would help promote a more sustainable pattern of development in line with the Council’s vision for the VoG.
• 6.2 Although we understand the Council have opted to pursue a ‘medium growth option’. Having reviewed the accompanying evidence base there is clear justification to warrant higher levels of growth, particularly in respect of housing over the emerging plan period. This would better accommodate the identified housing requirements and align with the Welsh Government’s aspirations to prioritise future development within a National Growth Area. These principles fully accord with PPW12 and Future Wales, whilst also enabling the VoG to proactively take action in order to account for historic unmet need across the county as shown within the latest Annual Monitoring Report (7th Edition).
• 6.3 Barratt Redrow Homes’ most pertinent comments on the consultation document are summarised below:


6. CONCLUSION
• Barratt Redrow fully supports the proposed approach to prioritise development in sustainable locations near existing rail and bus infrastructure as depicted by the strategic growth area within the RLDP Key Diagram. However, to optimise the effectiveness of this strategy growth should be focused in areas of high demand, such as Wenvoe, which is near to Cardiff but also inherently well connected by the existing bus network.
• Barratt Redrow support the principle of the Settlement Hierarchy and the identification of Wenvoe as a Primary Settlement. Whilst the importance of which is noted, Barratt Redrow maintain that Wenvoe, in particular, is capable of a higher role and function which can be accommodated at Candidate Site Ref. No 437. This is particularly relevant given the fact that the Service Centres at Cowbridge, Llantwit Major and Penarth are generally more constrained physically and environmentally.
• Barratt Redrow maintain that a higher growth option should be followed. Given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to overall housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.
• In the interests of soundness these changes shall help account for any potential overreliance on existing landbanks and variable windfall delivery rates which could in theory limit the plan’s ability to address unmet housing need. Barratt Redrow therefore conclude that a higher flexibility allowance and additional site allocations, such as the land at Swn Y Coed, are necessary to ensure the RLDP is able to effectively meet
Vale of Glamorgan Deposit Plan Representations | Swn Y Coed, Wenvoe – Site 437


local need over the plan period. The benefits of which shall also demonstrate the emerging RLDP is supported by a robust, proportionate and credible evidence base to accord with the requirements of the Development Plan Manual for Wales and national growth objectives.
• Whilst Barratt Redrow welcome the majority of the proposed planning policies from a development management perspective. They strongly object to Policy CC1 (Residential Operational Net Zero Carbon Development) on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework.
• Although Barratt Redrow support the requirements for affordable housing in new development. In its current form the proposed policies SP7 and SP8 lack sufficient flexibility for site specific circumstances and physical constraints which may impact upon delivery. This inevitably creates uncertainty for a number of sites, where the blanket approach to affordable housing requirements based on the Council’s latest needs evidence does not have due consideration for the event of unique technical complexities.
• From a planning perspective it is also important to recognise the additional benefits the site (Candidate Site Ref No. 437) could provide in accommodating the increased housing need generated by the suggested 15% flexibility allowance within a highly sustainable location. The principles of which clearly align with the Council’s aspirations and would maximise opportunities for linked trips, enabling residents to meet a greater proportion of their daily needs locally while benefiting from high-quality public transport

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6979

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - Dwr Cymru Welsh Water has made representations on planning application ref 2026/00056/FUL. A hydraulic modelling assessment (HMA) will be required. A 6” diameter watermain and a 6” diameter abandoned watermain cross the site.
Wastewater - Dwr Cymru Welsh Water has made representations on planning application ref 2026/00056/FUL. The public sewerage network can accept potential foul flows from this development site.
Wastewater Treatment Works - Dwr Cymru Welsh Water has made representations on planning application ref 2026/00056/FUL. Cog Moors WwTW has capacity to accept foul flows from the proposed development.

Testun llawn:

Vale of Glamorgan Replacement Local Development Plan (RLDP) 2022-2037
Thank you for consulting Welsh Water on the Vale of Glamorgan Deposit LDP, we appreciate and welcome the opportunity to engage in the Local Development Plan process.
Settlement boundaries
SSC1 – development within settlement boundaries
We welcome the requirement for new development to make efficient use of land and benefit from existing infrastructure provision or, where necessary, make provision for new infrastructure without any unacceptable effect on the natural environment (10).
Housing delivery
HG1 - housing allocations
A. Key sites (Policy HG1 KS1-5)
Our representation on the above sites are included in appendix 1.
B. Housing allocations (HG1 (1) to HG1 (9))
Our representation on the above sites are included in appendix 1.
C. Major landbank sites (HG2 (1) to HG2 (5))
These sites are existing commitments and Dwr Cymru Welsh Water has made representations on the planning applications submitted for these sites.
D. Housing led redevelopment opportunity (HG3 (1))
Our representation on the above site is included in appendix 1.
E. Rural affordable housing led sites (HG4 (1) to HG4(4))
Our representations on the above sites are included in appendix 1.
Our representations on the proposed allocated sites are included in appendix 1. Where planning applications have already been submitted and are pending a decision, we have made representations during the planning application consultation process regarding the capability of our infrastructure to accommodate the proposed development. If capacity does not exist within our infrastructure to accommodate the demands arising from a development site, the planning authority can make planning permission conditional upon there being adequate infrastructure available to cater for the development. A developer has a right to connect to our sewerage networks provided that a development site benefits from planning permission and there are no overriding planning conditions attached to the permission that controls the location or timing of that physical connection.
Gypsy and traveller accommodation (GT)
SP9 - gypsy and traveller site provision
Our representation on the site allocation is included in appendix 1.
Retail, commercial and service centres (RCS)
SP12 - retail floorspace provision
Our representations on the site allocations are included in appendix 2.
Community infrastructure (CI)
SP13 - community infrastructure and planning obligations
We support the provisions within the policy that the Council will secure new and improved community infrastructure where appropriate and within a timely manner, and the specific reference to utilities infrastructure. Where existing water and sewerage infrastructure requires reinforcement to serve a development it must be provided as part of the development to mitigate any adverse impacts. In circumstances where the development generates the need for infrastructure improvements that are not programmed for delivery by infrastructure providers then it must be funded by the development. Therefore, it is important for developers to engage early with relevant infrastructure providers, including the statutory sewerage and water undertaker. We welcome that the policy states that improved infrastructure must be undertaken in a timely manner. The delivery of reinforcements to the sewerage and water networks can controlled either through planning condition or a commercial agreement between the developer and Welsh Water.
Adequate potable water supply and drainage infrastructure is key to ensuring new development sites are sustainable, viable and deliverable. Hydraulic modelling assessments (HMA) may be required to determine an adequate point of connection to the water network and/or public sewers, and developers would be strongly recommended to fund investigations at pre-planning stage. Once commissioned and completed the HMA would identify suitable connection points and/or the necessary reinforcement works required to accommodate the development (for example upsizing sewers/water mains, additional storage tanks etc). In certain circumstances surface water removal could be an alternative option for allocations where foul sewer HMAs are being requested, and we would welcome early engagement with the site developer.
The reinforcements required to the network would be established by the HMA and costings would be provided at detailed design stage. The developer would need to fund a scheme by way of the requisition provisions of the Water Industry Act or via a legal/commercial agreement with Welsh Water.
Community facilities
CI3 – new community facilities
Our representations on the site allocations are included in appendix 2.
CI5 - cemetery and crematorium provision
Our representation on the site allocation is included in appendix 2.
Productive and enterprising places
SP14 - employment growth
Our representations on the site allocations are included in appendix 2.
We support sustainable economic development, however the LPA and potential developers should be aware that the obligations of a water and sewerage undertaker only extend to the ‘domestic’ supply part of an employment development (sinks, toilets, kitchen facilities etc). We are not obliged to provide potable water for use in any industrial process. Where an employment development results in higher demands of water supply and/or trade effluent discharge consent, under Section 118 of the Water Industry Act 1991, we recommend and welcome early consultation with developers. The capability of our infrastructure to service future employment allocations will be assessed when the potential demands arising from the developments are known.
EMP1 - employment regeneration opportunity areas
Our representations on the site allocations are included in appendix 2.
Climate change and transition towards net zero (CC)
SP16 - climate change mitigation and adaptation
We are supportive of this policy as the protection of water resources are key in ensuring we maintain a safe, healthy and reliable water supply. Incorporating water efficiency measures into developments will help minimise adverse impacts on localised and wider water supply networks including the quality of water resources.
We are also pleased that the policy includes particular emphasis on the importance of sustainable urban drainage systems (SuDS), in conjunction with Schedule 3 of the Flood and Water Management Act 2010. The tackling of surface water at source is a vital component of sustainable development and will mitigate against overloaded sewers which can ultimately lead to flooding. Disposing of surface water in a sustainable manner by ensuring that it does not communicate with the public sewerage network, including rainwater harvesting systems, protects the environment and assists in ensuring that there is sufficient capacity in the public sewerage network for foul-only flows from development sites.
SP19 – Green Infrastructure
In conjunction with SAB applications, under Schedule 3 of the Flood and Water Management Act 2010, we welcome provision within this policy to integrate green infrastructure with sustainable drainage systems.
Environmental protection
DNP5 – environmental protection
We welcome provisions within the policy to protect the natural environment from unacceptable impact from pollution of land, surface water, ground water and the air as well as flooding risks.
We hope that the above will assist you as you continue to progress the LDP. If you require any further information, then please do not hesitate to contact us on 0800 917 2652 or forward.plans@dwrcymru.com.

Appendix 1 – HG1 Housing Allocations, SP9 Gypsy & Traveller Site
Our representations on site allocations are provided in the table below. The following caveats are applicable to all sites:
• In accordance with the Water Industry Act 1991, Welsh Water retains rights of access to its assets at all times. Where there are sewers and/or water mains crossing sites then protection measures in respect of these assets will be required, usually in the form of an easement width or in some instances a diversion.
• Where insufficient hydraulic capacity exists within the public sewerage network or water supply network to accommodate/serve a development site, hydraulic modelling assessments (HMA) may be required, and developers would be strongly recommended to fund investigations during pre-planning stages. The findings of the HMA will identify the extent of any reinforcement required to accommodate the development, which can be procured via the requisition provisions of the Water Industry Act 1991 (as amended). If the sewerage network system in the locality is currently at capacity, there may be an opportunity to overcome our concerns by delivering a surface water removal scheme. This approach would ensure that there is no net increase in volume of flows communicating with the public sewer network, and therefore no further detriment to the public sewer network downstream of the development.
• In some instances, off-site water mains or public sewers may be required to connect to a suitable point on the existing networks at the developers’ cost. We may seek to control points of connection to the public sewerage network via appropriate planning conditions. Where assets need to be laid over private land, developers will need to comply with the requisition provisions of the Water Industry Act 1991.
• If there is limited or no capacity available at a Wastewater Treatment Works (WwTW), developers may need to fund a Developer Impact Assessment (DIA) to identify required reinforcement works. In these instances, a commercial agreement would be required between the developer and Welsh Water to deliver the necessary reinforcement works.
• Where capacity is currently available in the water supply network to accommodate development, we reserve the right to reassess our position at the time of the formal application for the provision of new water mains under Section 41 and Section 51 of the Water Industry Act (1991) to ensure there is sufficient capacity available to serve the development without causing detriment to existing customers’ supply as demands upon our water systems change continually.
• Please note the below comments are subject to change as the LDP progresses and/or as planning applications are submitted.

See tables in attachment for site specific comments.

Appendix 2 - Employment sites & other uses
Capacity comments for employment allocations can only be provided once the type of development and occupier/end-user of a site is known. Once requirements are confirmed, usually through the planning application process, further assessments will be undertaken. High-level comments are provided in the table below regarding any watermains/sewers crossing the proposed allocations, and the WwTW catchment that the sites are located within.
The following provisions are applicable to all allocated employment sites:
• the obligations of a water and sewerage undertaker extend to ‘domestic’ supplies only. We are not obliged to provide potable water for use in any industrial process. Where an employment allocation results in higher demands of water supply and/or trade effluent discharges we recommend and welcome early consultation with Welsh Water.
• The individual plots available for development can represent a substantial area of land for which the potential demands upon our assets are unknown at present. It is essential that we understand these demands to allow us to assess the impact on our assets. It may be necessary for water and/or sewerage hydraulic modelling assessments (HMAs) to be undertaken at the developer’s expense to establish where the proposed development could connect to the existing networks, and to identify any required infrastructure reinforcement works. Water mains and/or sewerage infrastructure required for any potential development site can be acquired through the requisition provisions of the Water Industry Act 1991 (as amended).
• In accordance with the Water Industry Act 1991, Welsh Water retains rights of access to its assets at all times. Where there are water mains and/or sewers crossing sites then protection measures in respect of these assets will be required, usually in the form of an easement width or in some instances a diversion of the asset.
• Where there is limited or no capacity at a WwTW, dependant on the scale and pace of development, developers may need to fund a Developer Impact Assessment (DIA) to identify required reinforcement works. In these instances, a commercial agreement would be required between the developer and Welsh Water to deliver the necessary reinforcements.
• If any development site gives rise to a new discharge (or alters an existing discharge) of trade effluent, directly or indirectly to the public sewerage system, then a Discharge Consent under Section 118 of the Water Industry Act 1991 is required from Welsh Water. Please note that the issuing of a discharge consent is independent of the planning process and a consent may be refused despite planning permission being granted.

See tables in attachments for site specific comments