Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6979

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - Dwr Cymru Welsh Water has made representations on planning application ref 2026/00056/FUL. A hydraulic modelling assessment (HMA) will be required. A 6” diameter watermain and a 6” diameter abandoned watermain cross the site.
Wastewater - Dwr Cymru Welsh Water has made representations on planning application ref 2026/00056/FUL. The public sewerage network can accept potential foul flows from this development site.
Wastewater Treatment Works - Dwr Cymru Welsh Water has made representations on planning application ref 2026/00056/FUL. Cog Moors WwTW has capacity to accept foul flows from the proposed development.

Atodiadau: