Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7003

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - 100mm, 160mm & 300mm diameter watermains crossing the site.
Sewerage - 150mm sewer, 225mm surface water sewer & 250mm diameter pressurised rising main crossing the site.
Tredogan Sewage Pumping Station is located within the site, and we would recommend that the LPA discuss the potential allocation with their Environmental Health Department. To avoid the potential for noise or odour nuisance for future occupiers it is strongly recommended that any properties are positioned a minimum of 15 metres away from the asset.
Wastewater Treatment Works (WwTW) - The site is in Cog Moors WwTW catchment.