Tir i'r dwyrain o Faes Awyr

Yn dangos sylwadau a ffurflenni 1 i 8 o 8

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4690

Derbyniwyd: 16/02/2026

Respondent ID: 3758

Ymatebydd: Amstone Developments Limited

Asiant : Tetra Tech Cardiff

Crynodeb o'r Gynrychiolaeth:

Amstone Developments Limited (ADL) support the draft RLDP allocation of the Site within the ‘Major Employment Allocation – Land East of Cardiff Airport, Roose’

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4691

Derbyniwyd: 16/02/2026

Respondent ID: 3758

Ymatebydd: Amstone Developments Limited

Asiant : Tetra Tech Cardiff

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Amend Policy SP14 and its supporting text to confirm that the Major Employment Allocation at Land East of Cardiff Airport may accommodate a broad range of employment‑generating uses, consistent with the definition of economic development in PPW and TAN 23, and not restricted solely to B1, B2 or B8 uses

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5389

Derbyniwyd: 08/03/2026

Respondent ID: 2653

Ymatebydd: Emma Reed

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Developments at the airport will yet cause more traffic congestion via Weycock Cross. The Airport has poor public transport infrastructure and lots of parking thereby encouraging more car travel.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5436

Derbyniwyd: 08/03/2026

Respondent ID: 712

Ymatebydd: Mrs Susan Evans

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Unknown.

Crynodeb o'r Gynrychiolaeth:

There is already an industrial area at St Athan which in not used, had a car factory which then closed in a short period, so this is unnecessary development.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5703

Derbyniwyd: 10/03/2026

Respondent ID: 3264

Ymatebydd: Mr David Entwistle

Crynodeb o'r Gynrychiolaeth:

I support these business developments in principle but fear that they will come before existing road and transport infrastructure is upgraded to cope. There needs to be substantial improvements to transport infrastructure before these sorts of developments are considered. By developing the business zones first the council also risks only attracting low quality businesses to the area as the higher quality businesses will be put off by poor infrastructure and transport links.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6145

Derbyniwyd: 11/03/2026

Respondent ID: 3343

Ymatebydd: Mrs Jacky Williams

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

Unknown

Crynodeb o'r Gynrychiolaeth:

The current construction of the Vale College Campus will bring much additional traffic flow and delays on an already busy route that experiences significant delays at numerous times during the day. The situation will be exacerbated with the additional provision of industrial units on this site, the potential development at Model Farm and proposed housing developments in Rhoose.
Noting that Cardiff Airport is considered important as an international gateway and essential to Wales’ economy, the access route (already not ideal) will be severely compromised and could further jeopardise the airport’s future.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6666

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

SP14 (1) Land east of Cardiff Airport, Rhoose Protected Species and Protected Sites: The site is within close proximity (360m) of Barry Woodlands SSSI and there also appears to be significant potential for the site to support dormouse, GCN, otter and water vole. There are large areas of semi-natural habitats associated with this site including woodland, mature hedgerow and watercourses. These should be retained and significantly buffered from development. Connectivity between the site and the wider environment should also be maintained. It is therefore currently not possible to advise whether the full aspirations of the site could be fulfilled.
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7003

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - 100mm, 160mm & 300mm diameter watermains crossing the site.
Sewerage - 150mm sewer, 225mm surface water sewer & 250mm diameter pressurised rising main crossing the site.
Tredogan Sewage Pumping Station is located within the site, and we would recommend that the LPA discuss the potential allocation with their Environmental Health Department. To avoid the potential for noise or odour nuisance for future occupiers it is strongly recommended that any properties are positioned a minimum of 15 metres away from the asset.
Wastewater Treatment Works (WwTW) - The site is in Cog Moors WwTW catchment.

Atodiadau: