Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6988

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

WAter Supply - The water network can supply the proposed development. 110mm diameter watermain crossing the site.
Wastewater - The public sewerage network can accept potential foul flows from this development site.
A 225mm diameter foul sewer crosses the site.
Wastewater Treatment Works - Llantwit Major WwTW has capacity to accept foul flows from the proposed development.