Crynodeb o'r Gynrychiolaeth:

Water Supply - A hydraulic modelling assessment (HMA) will be required. A 150mm diameter watermain and 2 x 160mm watermains cross the site.
Wastewater - The public sewerage network can accept potential foul flows from this development site. A 300mm diameter surface water sewer crosses the site.
Wastewater Treatment Works - Cog Moors WwTW has capacity to accept foul flows from the proposed development.