HG1 (4)

Yn dangos sylwadau a ffurflenni 1 i 3 o 3

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5591

Derbyniwyd: 09/03/2026

Respondent ID: 1465

Ymatebydd: Mr James Brown

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This land should be utilised for employment purposes as was designated in masterplan. We should not sell the waterfront short for short term gains

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6662

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

HG1 (4) Land at Neptune Road
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6980

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - A hydraulic modelling assessment (HMA) will be required. A 150mm diameter watermain and 2 x 160mm watermains cross the site.
Wastewater - The public sewerage network can accept potential foul flows from this development site. A 300mm diameter surface water sewer crosses the site.
Wastewater Treatment Works - Cog Moors WwTW has capacity to accept foul flows from the proposed development.

Atodiadau: