Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6973

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - A hydraulic modelling assessment (HMA) will be required. An 18” diameter watermain crosses the site.
Wastewater - The sewerage network can accommodate foul flows from the development. A 1450mm diameter foul sewer crosses the site.
Wastewater Treatment Works - Cog Moors WwTW has capacity to accept foul flows from the proposed development.

Atodiadau: