1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6967

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

We support the provisions within the policy that the Council will secure new and improved community infrastructure where appropriate and within a timely manner, and the specific reference to utilities infrastructure. Where existing water and sewerage infrastructure requires reinforcement to serve a development it must be provided as part of the development to mitigate any adverse impacts. In circumstances where the development generates the need for infrastructure improvements that are not programmed for delivery by infrastructure providers then it must be funded by the development. Therefore, it is important for developers to engage early with relevant infrastructure providers, including the statutory sewerage and water undertaker. We welcome that the policy states that improved infrastructure must be undertaken in a timely manner. The delivery of reinforcements to the sewerage and water networks can controlled either through planning condition or a commercial agreement between the developer and Welsh Water.
Adequate potable water supply and drainage infrastructure is key to ensuring new development sites are sustainable, viable and deliverable. Hydraulic modelling assessments (HMA) may be required to determine an adequate point of connection to the water network and/or public sewers, and developers would be strongly recommended to fund investigations at pre-planning stage. Once commissioned and completed the HMA would identify suitable connection points and/or the necessary reinforcement works required to accommodate the development (for example upsizing sewers/water mains, additional storage tanks etc). In certain circumstances surface water removal could be an alternative option for allocations where foul sewer HMAs are being requested, and we would welcome early engagement with the site developer.
The reinforcements required to the network would be established by the HMA and costings would be provided at detailed design stage. The developer would need to fund a scheme by way of the requisition provisions of the Water Industry Act or via a legal/commercial agreement with Welsh Water.

Atodiadau: