Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6823

Derbyniwyd: 10/03/2026

Respondent ID: 582

Ymatebydd: National Grid Electricity Transmission

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

A significant number of NGET assets – including substations – fall within Employment Opportunity Area 1.

NGET do not consider that proposals of EMP1 are necessarily in conflict with these assets and are keen to ensure development is able to come forward even where its assets are present within or adjacent to an allocation. However, it is critical that the presence of these assets is suitably addressed within the supporting policy wording if Policy EMP1 is to be considered effective as otherwise the presence of NGET assets without appropriate acknowledgement will amount to significant constraints on site delivery. In particular, the electrical substations require 24/7 access including for ‘abnormal indivisible loads’ (AIL) and the land immediately surrounding them is also critical to their safe and secure functioning and to accommodate any change in future requirements which may arise.

It is acknowledged that, as part of masterplanning principles set out at 6.281, the policy already makes mention of existing infrastructure assets within the site and a need for a site layout to be developed that considers the sites existing infrastructure (including electrical substations) however we consider that the policy needs to go further and acknowledge the wider range of NGET assets that are within the site as well as more clearly establish how any future development needs to respond to the presence of NGET assets within the site. With this in mind, we propose the following wording, or wording to similar effect which directly references the full range of NGET assets and specific design guide and principles be added to the list of masterplanning principles as a separate point:

“Development will include a strategy for responding to the NGET Substations, Overhead and Underground Cable Routes present within the site which demonstrates how the NGET Design Guide and Principles have been applied at the masterplanning stage and how the impact of the assets has been reduced through good design.”

Without appropriate acknowledgement of the NGET assets present within the sites, Policy EMP1 should not be considered effective as it cannot be delivered as proposed; unencumbered by the constraints posed by the presence of NGET infrastructure. As such, NGET object to the policy as currently drafted.