Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6762
Derbyniwyd: 11/03/2026
Respondent ID: 3677
Ymatebydd: Mr Kevin Feehan
Cadarn? Heb nodi
Although understanding the requirement for additional housing, the current proposal and location is at odds with the impact of the traffic on Cardiff Road between Dinas Powys and routes to Llandough, the A4232 and also alternative traffic proceeding to Cardiff centre and M4 link.
For more housing a complete change is required in the road infrastructure of the local area, or the residents of Llandough and Dinas will be gridlocked daily. I saw this first hand when the mill development at Ely Bridge was constructed. Traffic is now at a standstill at certain hours of the day.
Although understanding the requirement for additional housing, the current proposal and location is at odds with the impact of the traffic on the Cardiff Road between Dinas Powys and routes to Llandough and follow on to the A4232 and also alternative traffic proceeding to Cardiff centre and M4 link.
If any future housing are placed in this area a complete change is required in the road infrastructure of the local area, or the residents (current) of Llandough and Dinas will be gridlocked daily by traffic congestion. I saw this first hand when the mill development at Ely Bridge was constructed. Traffic is now at a standstill at certain hours of the day.