Policy HG1 KS1 - Detailed Wording - Objections

As stated, although the representations provide overarching support for the Deposit Plan and the
inclusion of Land at North West Barry as an allocation, a number of detailed matters are objected to in
relation to specific elements of the proposed KS1 policy wording.

It is acknowledged that the Key Site will need to be delivered in accordance with placemaking principles
(as set out in Policy SP4 Placemaking and Policy PGD1 Creating Well Designed Places), and masterplanning work to date has demonstrated that the site is fully capable for compliance with both Policy SP4 and PGD1.

Comments are provided on the additional requirements which the site is anticipated to comply with as set out at Policy HG1 KS1.

The policy as currently worded is considered to be overly prescriptive with regards to the positioning of affordable units on the site. It is the case the Registered Social Landlord who is responsible for the delivery and ongoing operation/management of the affordable units is best-placed to advise upon the positioning of the affordable units within the site layout. As such, it is requested that the prescriptive nature of the above bullet point is amended to allow for the RSL to advise on best practice.

With regards to the first two bullet points set out under the ‘Sustainable Transport and Highways’ section of the Policy HG1 KS1, to confirm, as part of the development of the Key Site, it is proposed (as detailed within the submitted Transport Assessment) to construct a new junction from Port Road to the west of the Weycock Cross roundabout at the location of the existing field gated access in the form of a signal-controlled junction, which would allow for the safe and timely exit of traffic from
the development onto the local highway network. Such an access would also provide enhanced Active Travel infrastructure in conjunction with the proposed Active Travel route between the Weycock Cross junction and Cardiff Airport. Traffic signals at the proposed site access would provide for dedicated demand dependent green time for pedestrians and cyclists along this section of the A4226 Port Road.

Significant work has been undertaken to date in demonstrating that the above is deliverable. However,
it is requested that further clarification is included within the policy text to confirm that the Key Site is not responsible for the delivery of any further/additional sections of the Weycock Cross to Cardiff Airport Active Travel route, over and above the section of the route which adjoins the Key Site.

As set out within the Transport Assessment (May 2025) prepared in support of the Key Site, the traffic
movements associated with the North West Barry allocation could be accommodated on the highway
network with a marginal and inconsequential impact on the conditions already experienced on the local highway network. An appraisal of the impact of committed development (as agreed with the Highways Authority) has been undertaken as part of the Transport Assessment, which identifies that committed development within the vicinity of the Weycock Cross junction would have a greater impact upon the local highway network than the North West Barry Key Site. The North West Barry development is smaller in comparison to the other committed development assessed, and would have a marginal and inconsequential impact upon the operation of the Weycock Cross junction. It is therefore considered
that the policy wording should be amended to reflect the ‘proportionate’ nature of contributions required.

.It will be important to ensure that any off-site measures are directly related to the proposed development, and are necessary to ensure the acceptability of the proposed development. The requirement for a contribution towards off-site measures ‘in the area’ is not specific enough, and it is requested that the wording is amended as per the suggested text

It is considered that the inclusion of a specified figure for the area of open space to be provided within the southern section of the site is unnecessary within the policy text. The Indicative Plan for the Key Site included at Figure 13 of the Deposit Plan illustrates the indicative extent of ‘Significant Open Space’ to be provided adjoining Porthkerry Country Park, which will be subject to further detailed masterplanning work as the Planning Application is prepared in due course. A figure for the exact area
of open space to be provided within this section of the site cannot therefore be robustly specified until the further stages of masterplanning work are completed. As such, it is requested that the figure is removed from the policy text, with the identification of ‘Significant Open Space’ on Indicative Plan being considered satisfactory. Furthermore, it is not considered appropriate that the policy wording should refer specifically to the financial contribution towards the management of this land, in addition to its transfer, as such contributions will be subject to detailed viability appraisal work at the Planning
Application stage.