Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6594
Derbyniwyd: 11/03/2026
Respondent ID: 3652
Ymatebydd: Mr Kevin Calnan
Cadarn? Heb nodi
Flooding at Cardiff Road (previously flooded railway terrace DP. 2020)
There is only one access point to the estate (2 is a necessity) for emergency access.
A green wedge (green belt) is being built on between Dinas Powys and Llandough.
Over 250 houses. too much strain on infrastructure, drainage, sewage, cars, roads, schooling, doctors surgeries etc. Building all over green belt and greenfields and our precious biodiversity. As we are in a climate emergency of decreasing biodiversity of flora and fauna that the Vale of Glamorgan and Government has announced! So uphold it.
Flooding at Cardiff Road (previously flooded railway terrace DP. 2020)
There is only one access point to the estate (2 is a necessity) for emergency access.
A green wedge (green belt) is being built on between Dinas Powys and Llandough.
Over 250 houses. too much strain on infrastructure, drainage, sewage, cars, roads, schooling, doctors surgeries etc. Building all over green belt and greenfields and our precious biodiversity. As we are in a climate emergency of decreasing biodiversity of flora and fauna that the Vale of Glamorgan and Government has announced! So uphold it.