Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6564
Derbyniwyd: 11/03/2026
Respondent ID: 1277
Ymatebydd: Renishaw Plc
Asiant : Turley
Renishaw Plc supports the retention of the Junction 34 (Hensol) allocation under Policy SP14.4, noting the rarity of well-connected, high-quality industrial sites. Phase 1 of the site has outline planning permission for up to 151,060.99 sqm of industrial space, a hotel/residential training centre, ancillary uses, and extensive infrastructure, with the first phase completed providing 400,000 sqft of space occupied by Renishaw. The site remains deliverable.
Future phases (Areas B, C, and D) are expected to provide over 1,000,000 sq ft of employment space, potentially creating 2,000 operational and 1,000 construction jobs, contributing significantly to regional sustainable growth.
We write on behalf of our client, Renishaw Plc, in response to the current consultation on the Vale of Glamorgan Replacement Local Development Plan (RLDP). We write to provide our comments in relation to the Vale of Glamorgan Deposit RLDP.
This letter is accompanied by the following:
• Completed Public Consultation Representation Form.
Renishaw’s comments on the Deposit RLDP policies and allocations are outlined below.
BACKGROUND
Established in 1973, Renishaw is a global leader in measurement, motion control, spectroscopy, and precision machining. The company is renowned for pioneering innovative solutions designed to enhance operational performance – optimising manufacturing efficiencies, improving product quality, advancing research capabilities, and increasing the effectiveness of medical procedures.
As part of a major redevelopment of its Miskin site in South Wales, Renishaw is investing over £50 million to expand its manufacturing capacity and reinforce its commitment to achieving net zero carbon emissions. This investment includes the construction of two new low-carbon production halls, which are designed to meet the growing domestic and international demand for its products, while also supporting research and development initiatives.
Policy SP14 – Employment Growth
Renishaw Plc supports the retention of Land to the South of Junction 34 of the M4, Hensol (36.23ha net) as a Major Employment Allocation under Policy SP14.4. The allocation of the site is crucial to ensure that the Council can meet its projected employment land needs and deliver the anticipated level of sustainable employment growth over the Plan period.
The site's continued allocation as a major employment site reflects it's importance as a key opportunity for investment and employment opportunities within the Vale of Glamorgan. The site is of strategic and regional importance as an employment site in a market where high quality, well connected industrial sites are rare.
Outline planning permission was originally granted for the proposed site (Ref no. 2014/00228/EAO) on 22 June 2016.
This permission has subsequently been renewed via a S73 application (ref: 2021/00899/EAO) which extends the period of time for the submission of reserved matters for a further 5 years from the date of the new permission (to 22 December 2030). The permission provides for the following development:
"Outline planning permission with all matters reserved except for access, for development comprising class B1, B2 and B8 uses; a hotel/residential training centre (class C1/C2); and ancillary uses within class A1, A2, A3; associated engineering and ground modelling works and infrastructure, car parking, drainage and access for all uses; provision of infrastructure (including energy centre(s)); landscaping and all ancillary enabling works) at Renishaw Plc, Miskin Business Park, Miskin."
A summary of the key elements of the outline permission are:
• Up to 151,060.99sqm of industrial floor space comprising Class B1, B2, B8 uses;
• Up to 9,290.30sqm of Hotel/Residential Training Centre (Class C1/C2);
• Up to 1,300sqm of ancillary Class A1, A2 and A3 uses;
• Up to 3,200 car parking spaces;
• 30.51ha of Green Infrastructure, comprising landscaping, water balancing areas;
• Access and servicing arrangements; and,
• Ancillary services, including power/utilities (with potential to incorporate energy centre (s)).
Reserved matters permission (reference number: 2019/01421/RES) was approved on 20 May 2021 to bring forward the first phase of the development. This phase of the development is now complete and provides 400,000 sqft of floorspace which is occupied by Renishaw as an extension to its existing operations at Miskin. In addition to employment opportunities created over the construction period, the development has created additional operational jobs for Renishaw. Significantly, many of these jobs provide high quality employment opportunities in the skilled and specialist sector, helping to create skills and provide local employment opportunities.
Renishaw will shortly bring its wider land holdings to the market with the intention of attracting major employment generating uses - further enhancing the economy of the region. The remaining phases of the site (Areas B, C and D) provide further opportunity for inward investment over the Plan period and the creation of over 1,000,000 square feet of employment space.
It is anticipated that Areas B, C and D could have the potential to create over 2,000 operational jobs. During the construction phase, the development also has the potential to create over 1,000 jobs further adding to the employment opportunities created through the development.
The recent renewal of the outline planning permission ensures that the development of the site remains deliverable over the Plan period.
EMP3 - Protection of Existing Employment Sites and Premises
Renishaw Plc support the continued allocation of the current Renishaw premises as an existing Major Employment Site under Polic EMP3.6 – Renishaw, Junction 34, M4.
The allocation of the Renishaw site recognises the importance of the established employment site for the local economy. Renishaw continue to represent an important local employer, who provide high quality, skilled and specialist employment opportunities for the local population.
The continued safeguarding of the site for B1, B2 and B8 uses is therefore supported.
EMP4 – Non-Employment Proposals on Existing Employment Areas and Premises
General support is given to Policy EMP4 which seeks to restrict the development of non-B1, B2 and B8 uses to ancillary services and facilities associated with an existing or proposed employment use.
However, the Policy should provide greater flexibility to allow for appropriate employment generating proposals which complement the existing uses and which may not clearly fall within the B1, B2 and B8 use class. This flexibility is essential in order to allow the sites to respond to changing market demand and emerging markets.
Summary
We trust that the above representations assist and are taken into account as the preparation of the Plan progresses.
We would be grateful if we could be kept informed of future stages of the emerging RLDP.
If you require any further information, please do not hesitate to contact me.
Yours sincerely