Tir i’r de o Gyffordd 34 yr

Yn dangos sylwadau a ffurflenni 1 i 5 o 5

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5033

Derbyniwyd: 03/03/2026

Respondent ID: 3090

Ymatebydd: Hannah Elward

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Local infrastructure is already under considerable strain. Roads around the motorway junction experience congestion, particularly at peak times. Additional development would exacerbate traffic pressures, increase pollution, and heighten safety risks. There is no clear evidence that supporting infrastructure—roads, schools, healthcare, drainage, and utilities—can accommodate further demand without significant and disruptive upgrades.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5706

Derbyniwyd: 10/03/2026

Respondent ID: 3264

Ymatebydd: Mr David Entwistle

Crynodeb o'r Gynrychiolaeth:

I support these business developments in principle but fear that they will come before existing road and transport infrastructure is upgraded to cope. There needs to be substantial improvements to transport infrastructure before these sorts of developments are considered. By developing the business zones first the council also risks only attracting low quality businesses to the area as the higher quality businesses will be put off by poor infrastructure and transport links.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6564

Derbyniwyd: 11/03/2026

Respondent ID: 1277

Ymatebydd: Renishaw Plc

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

Renishaw Plc supports the retention of the Junction 34 (Hensol) allocation under Policy SP14.4, noting the rarity of well-connected, high-quality industrial sites. Phase 1 of the site has outline planning permission for up to 151,060.99 sqm of industrial space, a hotel/residential training centre, ancillary uses, and extensive infrastructure, with the first phase completed providing 400,000 sqft of space occupied by Renishaw. The site remains deliverable.

Future phases (Areas B, C, and D) are expected to provide over 1,000,000 sq ft of employment space, potentially creating 2,000 operational and 1,000 construction jobs, contributing significantly to regional sustainable growth.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6669

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

SP14 (4) Land to the South of Junction 34 of the M4, Hensol
Protected Sites: The site is located directly adjacent to Ely Valley SSSI. Given the biodiversity interest at the site, previous applications at the site include planning commitments to conserve and enhance grasslands habitats on the site. These commitments have not yet materialised and the requirement for these provisions should be noted within the LDP.
Flood Risk: The site is located partially within Flood Zone 3 for Sea. We advise that an FCA will be required at project level to determine any flood risk implications at the site.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7006

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - 450mm diameter watermain crossing the site.
Sewerage - 750mm diameter foul sewer crossing the site.
Wastewater Treatment Works (WwTW) - The site is in Coslech WwTW catchment.

Atodiadau: