Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6548
Derbyniwyd: 11/03/2026
Respondent ID: 3631
Ymatebydd: Mrs Jeanette Haigh
Cadarn? Nac Ydi
Flooding has been a problem with run off increasing into the Eastbrook, which floods often.
The transport infrastructure cannot cope with the current situation. Most home owners now have more than one car.
The emission fumes from extra vehicles will increase, affecting homes, cyclists, pedestrians and pupils and teachers at Dinas Powys Infant School.
I also have concerns over the development at the bottom of Leckwith Hill as this will impact on traffic up towards Llandough and the Merrie Harrier junction.
Pen-y-Turnpike is already a ‘rat run’ to reach Leckwith Hill, impacting traffic moving through Dinas where there are already several pinch points.
Active Travel along Cardiff Road can be treacherous at times, especially through Eastbrook, as the road is incredibly narrow and no scope for widening.
The bus lane does not make much difference to the traffic issues.
Dinas Powys as a Community will lose its identity and become part of an urban sprawl.
I cannot see how a development will enhance the green infrastructure strategy by removing part of the green belt.