Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6466
Derbyniwyd: 11/03/2026
Respondent ID: 3594
Ymatebydd: Dryw Thompson
Cadarn? Heb nodi
1. The road is currently unable to accommodate the current traffic levels and the new traffic light system will only exacerbate this. Will cause traffic problems on nearby merging places and junctions. Any access via the pen-y-turnpike will be dangerous.
2. Local schools are already over capacity, especially with the lack of teachers.
3. Local GP facilities and hospitals are overstretched which causes health deterioration.
4. Public transport is not adequate and is already struggling. Trains are a distance away and services are being reduced so will cause more traffic.
5. Disturbance to local wildlife.
6. Frequent disruptions to water and electricity, uncertainty regarding the stability of gas supply, water treatment plant stinks with current supply of waste water and will get worse.
7. Fields should be protected as more houses will result in flooding as the ground absorbs the water and helps protect the road that recently has been flooding.
Please take this into consideration and reject the planning for the houses.