Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6423

Derbyniwyd: 10/03/2026

Respondent ID: 3345

Ymatebydd: Mr Simon Beeston

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The redrawing of the settlement boundary to include the site is unjustified.

Inclusion of this site for affordable housing, being unsustainable and unviable and likely to cause significant irreversible damage to village heritage status.

Inclusion of this site is not supported by the Integrated Site Impact Assessment .

Overdevelopment combined with recent developments in the village is not proportionate to the scale of the historic village and is damaging to its conservation status and community cohesion.

This site has been judged as unsuitable several previous occasions by the Local Authority.

There are known drainage and flooding issues in and around this site together with sewerage system capacity connectivity issues.

Increased levels of car use from the previous housing and primary school development has already adversely affected traffic flows.

This site does not meet transport sustainability objectives. Colwinston lacks direct links to public transport and active travel is inadequate.

Testun llawn:

I am objecting to the inclusion of grounds Site ID 4069 Land East of Colwinston on two principal grounds. These are:
1. The unjustified redrawing of the settlement boundary to include candidate site 4069

2. inclusion of this site for affordable housing, being unsustainable and unviable and likely to cause significant irreversible damage to village heritage status.

The inclusion of this site is it fails to reflect planning policies and LDP objectives. It fails on the majority of Impact Sustainability objectives and should not be approved for inclusion in the final LDP.

other grounds for objection include :-

3. Inclusion of this site is not supported by the Integrated Site Impact Assessment contravening almost all of the stated Sustainability Objectives within the LDP itself.
4. Overdevelopment Taken together with recent developments in the village the proposed growth of the settlement is not proportionate to the scale of the historic village and is damaging to its conservation status and community cohesion. It is not supported by evidence of settlement based housing need.
5. Inconsistency Of Site Assessment over Time This site has been judged as unsuitable several previous occasions by the Local Authority. This change in decision is not supported by the continued adverse impact assessment and non compliance with its own and national policies.
7. Flood risk There are known drainage and flooding issues in and around this site together with sewerage system capacity connectivity issues with the Cowbridge Wastewater Treatment Works.
8. Highways increased levels of car use from the previous housing and primary school development has already adversely affected traffic flows, parking, safe walking and cycling throughout the whole village.
9. Public transport and sustainable travel This site does not meet transport sustainability objectives. Colwinston lacks direct links to public transport (Greenlinks is an inadequate alternative).