Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6128

Derbyniwyd: 11/03/2026

Respondent ID: 3478

Ymatebydd: Nadia Cooper

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

In order to support the role of Cardiff Airport as a strategic gateway for international connectivity the allocation of HG1 KS1 (North West Barry / Weycock Cross) needs to be removed from the RLDP. The location is on the main route to Cardiff Airport . The road is already a busy road that is often stacked up with traffic. Increasing the number of cars to the road from the proposed estate and changing the current road layout will certainly have a negative effect on the use of the airport.

Newid wedi’i awgrymu gan ymatebydd:

HG1 KS1 (North West Barry / Weycock Cross) needs to be removed from the RLDP

Testun llawn:

In order to support the role of Cardiff Airport as a strategic gateway for international connectivity the allocation of HG1 KS1 (North West Barry / Weycock Cross) needs to be removed from the RLDP. The location is on the main route to Cardiff Airport . The road is already a busy road that is often stacked up with traffic. Increasing the number of cars to the road from the proposed estate and changing the current road layout will certainly have a negative effect on the use of the airport.