Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6021

Derbyniwyd: 09/03/2026

Respondent ID: 2596

Ymatebydd: Mr Martin Edwards

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I believe the deposit RLDP should be amended to exclude this site. It is not within walking distance of the station and an additional 376 households would generate significantly more traffic in an already congested area. The A422b has its limitations which was why the assessment in 2014 concluded that the development of this Green Wedge site would be detrimental to the capacity and freeflow of traffic on this major hub road to the airport and Vale. There is no real evidence that the physical constraints of the road network have changed since that assessment and to reverse those findings without significant infrastructure improvements would be unjustified. Traffic lights at the junction and controlled pedestrian crossing will only interrupt traffic flow increasing queuing and delays.
There is a serious risk of sewage contamination to the local stream and a threat to local wildlife. Bats are very active and a protected species and urbanisation of this green wedge site would result in habitat loss, increased disturbance and long- term ecological degradation . Has a bat survey been implemented? The scale and location of this development, are inappropriate given the importance and existing pressures on the adjacent road network.

Testun llawn:

I believe the deposit RLDP should be amended to exclude this site. It is not within walking distance of the station and an additional 376 households would generate significantly more traffic in an already congested area. The A422b has its limitations which was why the assessment in 2014 concluded that the development of this Green Wedge site would be detrimental to the capacity and freeflow of traffic on this major hub road to the airport and Vale. There is no real evidence that the physical constraints of the road network have changed since that assessment and to reverse those findings without significant infrastructure improvements would be unjustified. Traffic lights at the junction and controlled pedestrian crossing will only interrupt traffic flow increasing queuing and delays.
There is a serious risk of sewage contamination to the local stream and a threat to local wildlife. Bats are very active and a protected species and urbanisation of this green wedge site would result in habitat loss, increased disturbance and long- term ecological degradation . Has a bat survey been implemented? The scale and location of this development, are inappropriate given the importance and existing pressures on the adjacent road network.