1) Loss of green wedge. Green Wedge should not be a moveable commodity to suit council policy.
2) Flooding-Weycock Cross roundabout constantly floods. The field in question also has flooding issues. There is no mitigation in the current RLDP.
3)Mitigation-This does not work, look at Culverhouse Cross.
4) Further development-Another 1600 houses prosed for Rhoose putting pressure on the main arterial route into Rhoose (at the Weycock cross roundabout)
5) Lack of public transport in the area. Doctors surgeries are over subscribed, along with schools and dentists etc.
6) Over capacity on Port Road. The road from the proposed site (onto port road) was built for approx 2,000 vehicles. The council carried out their own survey a number of years ago and it was found that over 24,000 cars were using the route.
7) The site is outside the Urban Boundary
8) Nant Talwg Way pumping station regularly breaks down and this after the supposed upgrade.
9) Loss of Agricultural Land
1) Loss of green wedge. Green Wedge should not be a moveable commodity to suit council policy.
2) Flooding-Weycock Cross roundabout constantly floods. The field in question also has flooding issues. There is no mitigation in the current RLDP.
3)Mitigation-This does not work, look at Culverhouse Cross.
4) Further development-Another 1600 houses prosed for Rhoose putting pressure on the main arterial route into Rhoose (at the Waycock cross roundabout)
5) Lack of public transport in the area. Doctors surgeries are over subscribed, along with schools and dentists etc.
6) Over capacity on Port Road. The road from the proposed site (onto port road) was built for approx 2,000 vehicles. The council carried out their own survey a number of years ago and it was found that over 24,000 cars were using the route.
7) The site is outside the Urban Boundary
8) Nant Talwg Way pumping station regularly breaks down + this after the supposed upgrade.
9) Loss of Agricultural Land