Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5720

Derbyniwyd: 10/03/2026

Respondent ID: 920

Ymatebydd: Professor Andrew Vincent

Crynodeb o'r Gynrychiolaeth:

There is no integrated travel network or adequate bus services, and future local government funding constraints will limit development. Walking or cycling to key locations is unrealistic for many, with a 35-40 minute uphill walk from the station. Increased car use is inevitable, especially with current congestion at the Port Road roundabout. Car ownership as increased since 2015. Proposed traffic changes will cause chaos and increased congestion on A446 Port Road and Colcot Road. No evidence supports the effectiveness of signalisation, and higher car use will likely increase emissions and pollution exposure for children.

Testun llawn:

Re HG1 KS1: there is "NO" integrated travel network and "NO" adequate bus services. Future limits on local government finance will constrain any proposed developments. The idea that people will cycle or walk to the station, supermarket etc is guesswork with "NO" evidence, only vague hopes. It is 35 to 40 minutes tough up hill walk from thestation to Weycock. This is unrealistic for many. Cars WILL be used. The Port Road roundabout had exceeded its capabilities at the last 2014/15 report, the situation has just worsened. Car ownership has grown in Barry since 2015. Introducing the proposed KS1 entry/exit - immediately abutting the roundabout- is a recipe for traffic chaos. A446 Port Road will see traffic increases of up to 18%, Colcot Road up to 17% increase. Even small uplifts can cause disproportionate delay, a fact BP14A itself recognizes. There is NO evidence on proposed signalization effects from any direction. More cars entails high emissions, no quality air assessments have been carried out. Children walking to school will be exposed to higher levels of pollution.