Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5461

Derbyniwyd: 09/03/2026

Respondent ID: 920

Ymatebydd: Professor Andrew Vincent

Crynodeb o'r Gynrychiolaeth:

The RLDP significantly underplays the KS1 site's Green infrastructural importance as part of a wider connected landscape. The RLDP underestimates the Green infrastructure importance of the KS1 site, describing it as “unremarkable” or “low sensitivity,” which completely contradicts the 2014/15 Inspector’s view of it as part of a continuous landscape corridor. The RLDP also treats KS1 as isolated, ignoring its role in the Green land continuum between Barry and Rhoose. Further, the adjacent ancient Millwood is vulnerable to lighting, trampling, pollution, and potentially destructive hydrological changes. This nearby development risks damaging this protected ancient woodland through edge effects and disturbance.

Testun llawn:

The RLDP significantly underplays the KS1 site's Green infrastructural importance as part of a wider connected landscape. The RLDP underestimates the Green infrastructure importance of the KS1 site, describing it as “unremarkable” or “low sensitivity,” which completely contradicts the 2014/15 Inspector’s view of it as part of a continuous landscape corridor. The RLDP also treats KS1 as isolated, ignoring its role in the Green land continuum between Barry and Rhoose. Further, the adjacent ancient Millwood is vulnerable to lighting, trampling, pollution, and potentially destructive hydrological changes. This nearby development risks damaging this protected ancient woodland through edge effects and disturbance.