Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5311
Derbyniwyd: 08/03/2026
Respondent ID: 920
Ymatebydd: Professor Andrew Vincent
The site at Weycock Cross site (NW Barry) is NOT served by ANY existing viable public transport routes. There is no adequate sustainable transport connectivity other than by car on already massively over congested roads. Walking and cycling to major destinations such as the rail station, schools, Barry town or leisure center is totally impractical for the majority of residents particularly in poor weather conditions. The roundabout at Weycock Cross was recognised in previous Public Inquiries as at or beyond capacity (even by Vale Planning). The KS1 site will only worsen this traffic chaos. It is not a sustainable site.
The site at Weycock Cross site (NW Barry) is NOT served by ANY existing viable public transport routes. There is no adequate sustainable transport connectivity other than by car on already massively over congested roads. Walking and cycling to major destinations such as the rail station, schools, Barry town or leisure center is totally impractical for the majority of residents particularly in poor weather conditions. The roundabout at Weycock Cross was recognised in previous Public Inquiries as at or beyond capacity (even by Vale Planning). The KS1 site will only worsen this traffic chaos. It is not a sustainable site.